Eurofins Electrical Testing Service (Shanghai) Co., Ltd

Address(es)
  • Building 18, No.2168 Chenhang Highway, Minhang District
    Shanghai
    China
    +86 21 36202800
    +86 21 61819180
Website

No information declared

Acceptance date 2025-03-03
Accredited by

No information declared

Certificate

Download

Contacts

No information declared


Subcontracts for CB Testing Laboratory(ies)

No information declared

Category

Name

Tests/Clauses

Test from IECEE 02-2 Annex A

Specific Test

Used in product categories

Acceptance Date

Responsible National Certification Body

HOUS

Battery-operated appliances, separable batteries and detachable batteries for battery-operated appliances; Annex B
  • Testing of battery system in an end product, including battery/battery charger combination, for which requirements exist in end product standards (e.g. IEC 62841-1: 2014 Annex K, IEC 60335-1:2020 Annex B)

Battery-operated appliances, separable batteries and detachable batteries for battery-operated appliances

  • HOUS

TOOL

General conditions for the tests; K.5 / L.5Heating; K.12 / L.12Normal charging of lithium-ion systems; K.12.201 / L.12.201Lithium-ion charging systems - abnormal conditions; K.18.201 / L.18.202Lithium-ion BATTERY short circuit; K.18.202 / L.18.203Batteries other than lithium-ion - overcharging; K.18.203 / L18.204Lithium-ion enclosure pressure test; K.19.202 / L.19.202
  • Testing of battery system in an end product, including battery/battery charger combination, for which requirements exist in end product standards (e.g. IEC 62841-1: 2014 Annex K, IEC 60335-1:2020 Annex B)

General conditions for the tests Heating Normal charging of lithium-ion systems Lithium-ion charging systems - abnormal conditions Lithium-ion BATTERY short circuit Batteries other than lithium-ion - overcharging Lithium-ion enclosure pressure test

  • TOOL

TOOL

General conditions for the tests; K.5 / L.5Heating; K.12 / L.12Normal charging of lithium-ion systems; K.12.201 / L.12.201Lithium-ion charging systems - abnormal conditions; K.18.201 / L.18.202Lithium-ion BATTERY short circuit; K.18.202 / L.18.203Batteries other than lithium-ion - overcharging; K.18.203 / L18.204Lithium-ion enclosure pressure test; K.19.202 / L.19.202
  • Testing of battery system in an end product, including battery/battery charger combination, for which requirements exist in end product standards (e.g. IEC 62841-1: 2014 Annex K, IEC 60335-1:2020 Annex B)

General conditions for the tests Heating Normal charging of lithium-ion systems Lithium-ion charging systems - abnormal conditions Lithium-ion BATTERY short circuit Batteries other than lithium-ion - overcharging Lithium-ion enclosure pressure test

  • TOOL