ZTE CORPORATION Reliability Testing Center

Address(es)
  • No.2, Chuangyan Road, Liuxian Avenue,
    Nanshan District,

    Shenzhen
    Guangdong
    China

Website Not available
Status

MEMBER

Acceptance date 2025-01-16

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.4.11.3 – TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT5.7.8 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATION8.5.3, ANNEX T.8, ANNEX V – ACCESSIBILITY TO MOVING PARTS8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.5.4.6.3 – ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.7.3.2 – CORD STRAIN RELIEF TESTANNEX G.10.2, G.10.3 – CONDITIONING AND RESISTOR TESTANNEX G.10.6 – OVERLOAD TEST- FOR RESISTORS USED AS A CAPACITOR DISCHARGE SAFEGUARDANNEX G.15.2.1 – HYDROSTATIC PRESSURE TESTANNEX G.15.2.2 – CREEP RESISTANCE TEST FOR SELF-CONTAINED LFCANNEX G.15.2.3, G.15.3.4 – TUBING AND FITTINGS COMPATIBILITY TESTANNEX G.15.2.4 – VIBRATION TEST FOR SELF-CONTAINED LFCANNEX G.15.2.5, G.15.3.5 – THERMAL CYCING TESTANNEX G.15.2.6, G.15.3.6 – FORCE TESTANNEX G.15.3.2 – HYDROSTATIC PRESSURE TEST FOR MODULAR LFCANNEX G.15.3.3 – CREEP RESISTANCE TEST FOR MODULAR LFC Q.1 – LIMITED POWER SOURCEANNEX R.1-R.4 – LIMITED SHORT CIRCUIT TEST
2025-01-16

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.5.2, 5.4.1.5.3 – TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.2.4 – MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.7, 5.4.1.5.3 – TESTS FOR SEMICONDUCTOR COMPONENTS AND CEMENTED JOINTS5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.4.11.3 – TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATION6.6 – TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, ANNEX T.8, ANNEX V – ACCESSIBILITY TO MOVING PARTS8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.5.4.6 – LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.5.4.6.3 – ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSANNEX G.7.3.2 – CORD STRAIN RELIEF TESTANNEX G.10.3 – RESISTOR TEST, G.10.2 - CONDITIONINGANNEX G.10.6 – OVERLOAD TEST- FOR RESISTORS USED AS A CAPACITOR DISCHARGE SAFEGUARDQ.1 – LIMITED POWER SOURCEANNEX R.1 – LIMITED SHORT CIRCUIT TEST
2025-01-16

ITAV

5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 - ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.10.3 - BALL PRESSURE TEST5.4.1.3 - TEST FOR HYGROSCOPIC MATERIALS5.4.1.4, 9.2, B.1.6 , B.2.6 - HEATING5.4.1.4, ANNEX B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.5.2 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH5.4.11.3 - TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.4, ANNEX R - PROTECTIVE BONDING CONDUCTORS: LIMITED SHORT CIRCUIT TEST5.6.6.2 A) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.6.6.2 B) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXCEEDING 25 A5.6.6.2 C) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: ALTERNATIVE TO 5.6.6.2 B)5.6.6.2 D) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: DC MIANS5.6.6.2 E) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXTERNAL CIRCUIT5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.4 - EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.5 - PROTECTIVE CONDUCTOR CURRENT5.7.7 A) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: EARTHED EXTERNAL CIRCUIT5.7.7 B) - SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS: NO REFERENCE TO PROTECTIVE EARTH6.2.2.2 - POWER MEASUREMENT: WORST-CASE FAULT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.2.3 - POWER MEASUREMENT: WORST-CASE POWER SOURCE FAULT6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.5.3, 6.6, ANNEX Q.1 - LIMITED POWER SOURCE6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE FAULT6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION - WORST-CASE POWER SOURCE FAULT8.5.3, ANNEX T.8, ANNEX V - ACCESSIBILITY TO MOVING PARTS8.7 - WALL OR CEILING MOUNTING TESTS8.8 - HANDLE STRENGTH9.2.5 - TOUCH TEMPERATURE TEST: ABNORMAL OPERATING CONDITIONS9.2.5 - TOUCH TEMPERATURE TEST: NORMAL OPERATING CONDITIONSANNEX B.2.5 - INPUT TEST: POLYPHASEANNEX B.2.5 - INPUT TEST: SINGLE PHASEANNEX B.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 - SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.3.2 - SIMULATED ABNORMAL OPERATING CONDITIONS: COVERING OF VENTILATION OPENINGSANNEX B.3.3 - SIMULATED ABNORMAL OPERATING CONDITIONS: DC MAINS POLARITYANNEX B.3.4 - SIMULATED ABNORMAL OPERATING CONDITIONS: SETTING OF VOLTAGE SELECTORANNEX B.3.5 - SIMULATED ABNORMAL OPERATING CONDITIONS: MAXIMUM LOAD AT OUTPUT TERMINALSANNEX B.3.6 - SIMULATED ABNORMAL OPERATING CONDITIONS: REVERSE BATTERY POLARITYANNEX B.4 - SIMULATED SINGLE FAULT CONDITIONSANNEX B.4.1, B.4.4, B.4.5, B.4.6 - SIMULATED SINGLE FAULT CONDITIONS: BLOCKED MOTORANNEX B.4.7 - SIMULATED SINGLE FAULT CONDITIONS: CONTINUOUS OPERATION OF COMPONENTSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 - TRANSFORMER OVERLOADANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODANNEX G.7.3.2 - STRAIN RELIEF TEST4.4.4.2, ANNEX T.2 - STEADY FORCE TEST, 10N4.4.4.2, 4.4.4.5, ANNEX T.2 - T.5 - STEADY FORCE TEST (10N, 30N, 100N, 250N)4.4.4.2, ANNEX T.5 - STEADY FORCE TEST (250N)4.4.4.4, ANNEX T.6 - ENCLOSURE IMPACT TEST4.4.4.3, ANNEX T.7 – DROP TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) - STRESS RELIEF – ALTERNATE TEST PER IEC 60695-10-3
2025-01-16