ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD

Address(es)
  • NO.1199 BIN'AN RD, BINJIANG DISTRICT, HANGZHOU, ZHEJIANG, 310053
    China

Website Not available
Status

WITHDRAWN

Acceptance date 2018-03-18

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted clauses:4.4.3.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLYAccepted clauses:4.4.3.2, T.4 – STEADY FORCE TEST, 100 NAccepted clauses:4.4.3.2, T.5 – STEADY FORCE TEST, 250 NAccepted clauses:4.4.3.3, T.7 – DROP TESTAccepted clauses:4.4.3.4, T.6 - IMPACT TESTAccepted clauses:4.4.3.5, T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIERAccepted clauses:4.4.3.8, T.8 – STRESS RELIEF TESTAccepted clauses:5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCESAccepted clauses:5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALSAccepted clauses:5.4.1.8 – DETERMINATION OF WORKING VOLTAGEAccepted clauses:5.4.1.10.3 – BALL PRESSURE TESTAccepted clauses:5.4.4.6.2 – SEPARABLE THIN SHEET MATERIALAccepted clauses:5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATIONAccepted clauses:5.4.10, 5.4.10.2.2 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TESTAccepted clauses:5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR Accepted clauses:5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEMAccepted clauses:5.7.4 – – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTSAccepted clauses:5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON IT SYSTEMAccepted clauses:6.2.2.2, 6.2.2.3 – POWER MEASUREMENTSAccepted clauses:8.6.2 – STATIC STABILITYAccepted clauses:8.6.3.2 – RELOCATION STABILITY TESTAccepted clauses:8.6.4 – GLASS SLIDE TESTAccepted clauses:8.6.5 – HORIZONTAL FORCE TESTAccepted clauses:8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSAccepted clauses:8.8 – HANDLE STRENGTHAccepted clauses:B.2.5 – INPUT TEST: SINGLE PHASEAccepted clauses:B.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTAccepted clauses:B.3 – SIMULATED ABNORMAL OPERATING CONDITIONSAccepted clauses:B.4 – SIMULATED SINGLE FAULT CONDITIONSAccepted clauses:F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSAccepted clauses:G.5.3.3 – TRANSFORMER OVERLOADAccepted clauses:G.10.2, G.10.3 - CONDITIONING AND RESISTOR TEST Accepted clauses:G.10.2, G.10.4, G.10.5 - CONDITIONING, VOLTAGE SURGE TEST AND/OR IMPULSE TESTAccepted clauses:M.3.2 – PROTECTION CIRCUITS FOR BATTERIESAccepted clauses:M.4.2 – PORTABLE SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSAccepted clauses:M.4.4, T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYAccepted clauses:M.6 – EXTERNAL SHORT-CIRCUIT OF CELL TERMINALSAccepted clauses:Q.1 – LIMITED POWER SOURCE
2023-01-02

ITAV

Accepted clauses:4.4.4.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLYAccepted clauses:4.4.4.2, T.4 – STEADY FORCE TEST, 100 NAccepted clauses:4.4.4.2, T.5 – STEADY FORCE TEST, 250 NAccepted clauses:4.4.4.3, T.7 – DROP TESTAccepted clauses:4.4.4.4, T.6 - IMPACT TESTAccepted clauses:4.4.4.5, T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIERAccepted clauses:4.4.4.6, T.9 – GLASS IMPACT TESTAccepted clauses:4.4.4.7, ANNEX T.8 – STRESS RELIEF TESTAccepted clauses:5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCESAccepted clauses:5.4.1.8 – DETERMINATION OF WORKING VOLTAGEAccepted clauses:5.4.1.10.3 – BALL PRESSURE TESTAccepted clauses:5.4.4.6.2 – SEPARABLE THIN SHEET MATERIALAccepted clauses:5.4.8 – HUMIDITY CONDITIONINGAccepted clauses:5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATIONAccepted clauses:5.4.10, 5.4.10.2.2 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TESTAccepted clauses:5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTORAccepted clauses:5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEMAccepted clauses:5.7.4 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEMAccepted clauses:6.2.2.2, 6.2.2.3 – POWER MEASUREMENTSAccepted clauses:8.6.3 – RELOCATION STABILITY TESTAccepted clauses:8.6.4 – GLASS SLIDE TESTAccepted clauses:8.6.5 – HORIZONTAL FORCE TESTAccepted clauses:8.7 – WALL OR CEILING MOUNTING TESTSAccepted clauses:8.8—HANDLE STRENGTHAccepted clauses:B.2.5 – INPUT TEST: SINGLE PHASEAccepted clauses:B.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTAccepted clauses:B.3 – SIMULATED ABNORMAL OPERATING CONDITIONSAccepted clauses:B.4 – SIMULATED SINGLE FAULT CONDITIONSAccepted clauses:ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSAccepted clauses:ANNEX G.5.3.3 – TRANSFORMER OVERLOADAccepted clauses:G.10.2 - CONDITIONING AND RESISTOR TESTAccepted clauses:ANNEX G.10.3 – RESISTORS BETWEEN MAINS AND EXTERNAL CIRCUITAccepted clauses:M.3.2 – PROTECTION CIRCUITS FOR BATTERIESAccepted clauses:M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSAccepted clauses:M.4.4, T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYAccepted clauses:M.6.1 – EXTERNAL SHORT-CIRCUIT OF CELL TERMINALSAccepted clauses:Q.1 - LIMITED POWER SOURCE
2019-03-10

OFF

Accepted clauses:1.6.2 - INPUT TEST: SINGLE-PHASE. Accepted clauses:1.7.11 - DURABILITY OF MARKING TEST.Accepted clauses:2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST Accepted clauses:2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS Accepted clauses:2.1.1.7 CAPACITANCE DISCHARGE TEST Accepted clauses:2.5 LIMITED POWER SOURCE MEASUREMENTS. Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II Accepted clauses:2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST Accepted clauses:2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST Accepted clauses:4.1 STABILITY TESTS. Accepted clauses:4.2.1 - 4.2.4 – STEADY FORCE TESTS. Accepted clauses:4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST. Accepted clauses:4.2.6, 4.2.1 DROP TEST Accepted clauses:4.2.7, 4.2.1 – STRESS RELIEF TEST. Accepted clauses:4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. Accepted clauses:4.3.2 KNOB PULL/HANDLE LOADING TESTAccepted clauses:4.3.8 BATTERY TESTS Accepted clauses:4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST Accepted clauses:4.5.1, 1.4.12, 1.4.13 HEATING TEST.Accepted clauses:5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) Accepted clauses:5.2.2 ELECTRIC STRENGTH TEST Accepted clauses:5.3.1 5.3.9 ABNORMAL OPERATION TESTS. Accepted clauses:6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST
2019-03-10

OFF

Accepted clauses:1.6.2 - INPUT TEST: SINGLE-PHASE. Accepted clauses:1.7.11 - DURABILITY OF MARKING TEST.Accepted clauses:2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST Accepted clauses:2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS Accepted clauses:2.1.1.7 CAPACITANCE DISCHARGE TEST Accepted clauses:2.5 LIMITED POWER SOURCE MEASUREMENTS. Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II Accepted clauses:2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST Accepted clauses:2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST Accepted clauses:4.1 STABILITY TESTS. Accepted clauses:4.2.1 - 4.2.4 – STEADY FORCE TESTS. Accepted clauses:4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST. Accepted clauses:4.2.6, 4.2.1 DROP TEST Accepted clauses:4.2.7, 4.2.1 – STRESS RELIEF TEST. Accepted clauses:4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. Accepted clauses:4.3.2 KNOB PULL/HANDLE LOADING TESTAccepted clauses:4.3.8 BATTERY TESTS Accepted clauses:4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST Accepted clauses:4.5.1, 1.4.12, 1.4.13 HEATING TEST.Accepted clauses:5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) Accepted clauses:5.2.2 ELECTRIC STRENGTH TEST Accepted clauses:5.3.1 5.3.9 ABNORMAL OPERATION TESTS. Accepted clauses:6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST
2019-03-10

OFF

Accepted clauses:1.6.2 - INPUT TEST: SINGLE-PHASE. Accepted clauses:1.7.11 - DURABILITY OF MARKING TEST.Accepted clauses:2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST Accepted clauses:2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS Accepted clauses:2.1.1.7 CAPACITANCE DISCHARGE TEST Accepted clauses:2.5 LIMITED POWER SOURCE MEASUREMENTS. Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I Accepted clauses:2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II Accepted clauses:2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST Accepted clauses:2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST Accepted clauses:4.1 STABILITY TESTS. Accepted clauses:4.2.1 - 4.2.4 – STEADY FORCE TESTS. Accepted clauses:4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST. Accepted clauses:4.2.6, 4.2.1 DROP TEST Accepted clauses:4.2.7, 4.2.1 – STRESS RELIEF TEST. Accepted clauses:4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. Accepted clauses:4.3.2 KNOB PULL/HANDLE LOADING TESTAccepted clauses:4.3.8 BATTERY TESTS Accepted clauses:4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST Accepted clauses:4.5.1, 1.4.12, 1.4.13 HEATING TEST.Accepted clauses:5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) Accepted clauses:5.2.2 ELECTRIC STRENGTH TEST Accepted clauses:5.3.1 5.3.9 ABNORMAL OPERATION TESTS. Accepted clauses:6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE - IMPULSE TEST
2019-03-10