YANG MING INDUSTRIAL

Address(es)
  • No.10 Maliu Road Baoan Community, Yuanshan Street, Longgang District
    Shenzhen
    Guangdong 518115
    China

Website Not available
Status

MEMBER

Acceptance date 2024-11-29

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: ROD PRESSURE TEST4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: SECURITY OF INPUT CONTACTS4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: RESISTENCE TO CRUSHING4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: BLADE SECUREMENT TEST4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7, DVE , EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: WEIGHT AND MOMENT DETERMINATION5.2, CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3, BALL PRESSURE TEST5.4.1.8, DETERMINATION OF WORKING VOLTAGE5.4.4.6.2, SEPARABLE THIN SHEET MATERIAL5.4.5, ANTENNA TERMINAL INSULATION5.4.8, HUMIDITY CONDITIONING5.4.9, ELECTRIC STRENGTH5.5.2.2, SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 A), RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.7, Prospective touch voltage, touch current and protective conductor current6.2.2.2, 6.2.2.3, POWER MEASUREMENTSANNEX B.2.5, INPUT TEST: SINGLE PHASEANNEX B.2.6, OPERATING TEMPERATURE MEASUREMENT CONDITIONSANNEX B.3, SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4, SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10, TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3, TRANSFORMER OVERLOAD TESTSANNEX G.7.3.2 , STRAIN RELIEF TESTANNEX G.8.2.2, Varistor overload testANNEX Q.1 , LIMITED POWER SOURCEANNEX T.2, STEADY FORCE TEST, 10N
2024-12-18

ITAV

4.4.4.2, ANNEX T.3, STEADY FORCE TEST, 30N4.4.4.2, ANNEX T.4, STEADY FORCE TEST, 100N4.4.4.2, ANNEX T.5, STEADY FORCE TEST, 250N4.4.4.3, ANNEX T.7, DROP TEST4.4.4.4, ANNEX T.6, IMPACT4.4.4.5, ANNEX T.3, STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8, STRESS RELIEF TEST4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: SECURITY OF INPUT CONTACTS4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: RESISTENCE TO CRUSHING4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: BLADE SECUREMENT TEST4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: ROD PRESSURE TEST4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLRTS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)4.7, EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7, DVE , EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: WEIGHT AND MOMENT DETERMINATION5.2, 5.7, CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3, BALL PRESSURE TEST5.4.1.8, DETERMINATION OF WORKING VOLTAGE5.4.4.6.2, SEPARABLE THIN SHEET MATERIAL5.4.5, G.10.3.2, ANTENNA TERMINAL INSULATION - VOLTAGE SURGE5.4.8, HUMIDITY CONDITIONING5.4.9, ELECTRIC STRENGTH5.5.2.2, SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 A), RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.7, PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5, PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3, POWER MEASUREMENTSANNEX B.2.5, INPUT TEST: SINGLE PHASEANNEX B.2.6, NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3, SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4, SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10, TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3, TRANSFORMER OVERLOAD TESTSANNEX G.7.3.2 , STRAIN RELIEF TESTANNEX Q.1 , LIMITED POWER SOURCEANNEX T.2, STEADY FORCE TEST, 10N4.4.3.2, ANNEX T.3, STEADY FORCE TEST, 30N4.4.3.2, ANNEX T.4, STEADY FORCE TEST, 100N4.4.3.2, ANNEX T.5, STEADY FORCE TEST, 250N4.4.3.3, ANNEX T.7, DROP TEST4.4.3.4, ANNEX T.6, Impact tests4.4.3.5, ANNEX T.3, Internal accessible safeguard tests4.4.3.8, ANNEX T.8, STRESS RELIEF TEST
2024-12-18