YANG MING INDUSTRIAL

Address(es)
  • No.10 Maliu Road Baoan Community, Yuanshan Street, Longgang District
    Shenzhen 518115
    Guangdong,
    China

Website Not available
Status

MEMBER

Acceptance date 2019-08-06

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.4.2,ANNEX T.3 STEADY FORCE TEST, 30N4.4.4.2,ANNEX T.4 STEADY FORCE TEST, 100N4.4.4.2,ANNEX T.5 STEADY FORCE TEST, 250N4.4.4.3,ANNEX T.7 DROP TEST4.4.4.4,ANNEX T.6 IMPACT4.4.4.5,ANNEX T.3 STEADY FORCE TEST FOR INTERNALENCLOSURE ANDBARRIER4.4.4.7, ANNEX T.8 STRESS RELIEF TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: MOMENT TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.10.3 BALL PRESSURE TEST5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.5, G.10.3.2 ANTENNA TERMINAL INSULATION - VOLTAGE SURGE5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM: 25 A OR LESS5.7 Prospective touch voltage, touch current and protective conductor current5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM 5.7.6 – PROTECTIVE CONDUCTOR CURRENT 6.2.2.2,6.2.2.3 POWER MEASUREMENTSANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATINGCONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOAD TESTSANNEX T.2 STEADY FORCE TEST, 10NANNEX Q.1 LIMITED POWER SOURCEAnnex G.8.2.2 Varistor overload test
2021-12-02

ITAV

4.4.4.2, ANNEX T.3 STEADY FORCE TEST, 30N4.4.4.2, ANNEX T.4 STEADY FORCE TEST, 100N4.4.4.2, ANNEX T.5 STEADY FORCE TEST, 250N4.4.4.3, ANNEX T.7 DROP TEST4.4.4.4, ANNEX T.6 IMPACT4.4.4.5, ANNEX T.3 STEADY FORCE TEST FOR INTERNALENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8 STRESS RELIEF TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: MOMENT TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.10.3 BALL PRESSURE TEST5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.5, G.10.3.2 ANTENNA TERMINAL INSULATION - VOLTAGE SURGE5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM: 25 A OR LESS5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT5.7.4 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2,6.2.2.3 POWER MEASUREMENTSANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATINGCONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOAD TESTSANNEX T.2 STEADY FORCE TEST, 10NANNEX Q.1 LIMITED POWER SOURCEAnnex G.8.3.2 Varistor overload test
2019-08-06

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPEREMEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.5.6,2.10.5.13 TRANSFORMER AND WIRE INSULATIONELECTRIC STRENGTH2.10.5.9,2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.2.2, 2.2.3,2.2.4 SELV RELIABILITY TEST2.2.2, 2.2.3,2.2.4, PART22.6.1 SELV RELIABILITY TESTINCLUDINGHAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING2.9.1, 2.9.2,5.2.2 HUMIDITY TEST3.2.6, 4.2.1,4.2.7 STRAIN RELIEF4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 2210.2 IMPACT TEST4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF4.3.6 DIRECT PLUG-IN EQUIPMENT-MOMENT4.5.1, 1.4.12,1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4,5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD
2019-08-06

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPEREMEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.5.6,2.10.5.13 TRANSFORMER AND WIRE INSULATIONELECTRIC STRENGTH2.10.5.9,2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.2.2, 2.2.3,2.2.4 SELV RELIABILITY TEST2.2.2, 2.2.3,2.2.4, PART22.6.1 SELV RELIABILITY TESTINCLUDINGHAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING2.9.1, 2.9.2,5.2.2 HUMIDITY TEST3.2.6, 4.2.1,4.2.7 STRAIN RELIEF4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 2210.2 IMPACT TEST4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF4.3.6 DIRECT PLUG-IN EQUIPMENT-MOMENT4.5.1, 1.4.12,1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4,5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD
2019-08-06

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, ANDVOLT-AMPEREMEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5,2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE -WORKING VOLTAGE MEASUREMENT TEST2.10.5.6,2.10.5.13 TRANSFORMER AND WIRE INSULATIONELECTRIC STRENGTH2.10.5.9,2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.2.2, 2.2.3,2.2.4 SELV RELIABILITY TEST2.2.2, 2.2.3,2.2.4, PART22.6.1 SELV RELIABILITY TESTINCLUDINGHAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING2.9.1, 2.9.2,5.2.2 HUMIDITY TEST3.2.6, 4.2.1,4.2.7 STRAIN RELIEF4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 2210.2 IMPACT TEST4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF4.3.6 DIRECT PLUG-IN EQUIPMENT-MOMENT4.5.1, 1.4.12,1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4,5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD
2019-08-06