Xylem Service Italia Srl

Address(es)
  • VIA DOTTOR LOMBARDI 14
    IT- 36075 MONTECCHIO MAGGIORE
    VI
    Italy

Website Not available
Status

MEMBER

Acceptance date 2019-09-04

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS
2019-09-04

HOUS

7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS
2019-09-04

HOUS

7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS
2019-09-04

HOUS

11.7 HEATING WITH LIQUID AT THE TEMPERATURE MARKED ON THE PUMP22.101 CONSTRUCTION - MAXIMUM PRESSURE TEST
2019-09-04

HOUS

11.7 HEATING WITH LIQUID AT THE TEMPERATURE MARKED ON THE PUMP22.101 CONSTRUCTION - MAXIMUM PRESSURE TEST
2022-07-25