Xylem Service Italia Srl
Xylem Service Italia Srl
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2019-09-04 |
Further information
Stage | Country | Name |
---|---|---|
3 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
HOUS | IEC 60335-1:2010 | 7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS | 2019-09-04 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | 7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS | 2019-09-04 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | 7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.1.1 MOISTURE RESISTANCE – IPX5 MOISTURE TEST15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.47 CONSTRUCTION - WATER PRESSURE TEST23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST25 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS27 PROVISION FOR EARTHING29 CREEPAGE DISTANCES, CLEARANCES AND DISTANCES THROUGH INSULATION19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS19.11.2 ABNORMAL OPERATION – FAULT CONDITIONS19.11.3 ABNORMAL OPERATION – FAULT CONDITIONS | 2019-09-04 | |
HOUS | IEC 60335-2-41:2012 | 11.7 HEATING WITH LIQUID AT THE TEMPERATURE MARKED ON THE PUMP22.101 CONSTRUCTION - MAXIMUM PRESSURE TEST | 2019-09-04 | |
HOUS | IEC 60335-2-51:2019 | 11.7 HEATING WITH LIQUID AT THE TEMPERATURE MARKED ON THE PUMP22.101 CONSTRUCTION - MAXIMUM PRESSURE TEST | 2022-07-25 |