XP POWER LTD
XP POWER LTD
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2022-04-20 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, T.3 - STEADY FORCE TEST 30N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, T.5 - STEADY FORCE TEST 250N4.4.3.4, T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.6 – PROTECTIVE CONDUCTOR CURRENTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANANCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOAD | 2022-04-20 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, ANNEX T.5 - STEADY FORCE TEST 250N4.4.4.2, ANNEX T.3 - STEADY FORCE TEST 30N4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 (a) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 - PROTECTIVE CONDUCTOR CURRENTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOAD | 2022-04-20 | |
OFF | IEC 60950-1:2005 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST | 2022-04-20 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST | 2022-04-20 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.2.2.1 - GUIDE INFORMATION PAGE - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST | 2022-04-20 |