XP Power LLC

Address(es)
  • 340 Commerce, Suite 100, CA 92602
    Irvine
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2012-04-05

Further information

Stage

Country

Name

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.9.1 ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.5 INPUT TEST: POLYPHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 NORMAL OPERATING CONDITIONS TEMPERATURE TESTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODQ.1 LIMITED POWER SOURCE
2022-04-20

ITAV

5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9.1 ELECTRIC STRENGTH TEST - TYPE TESTING OF SOLID INSULATION5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.5 INPUT TEST: POLYPHASEANNEX B.2.6, 5.4.1.4, 6.3, 9.2 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODQ.1 LIMITED POWER SOURCE
2017-08-24

MED

11.1 EXCESSIVE TEMPERATURES IN ME EQUIPMENT13 HAZARDOUS SITUATIONS AND FAULT CONDITIONS15.5.1.2 TRANSFORMERS - SHORT-CIRCUIT TEST15.5.1.3 TRANSFORMERS - OVERLOAD TEST4.11 POWER INPUT5.7 HUMIDITY PRECONDITIONING TREATMENT8.4.3 POWER SOURCE PLUG - STORED CHARGE8.5.4 WORKING VOLTAGE8.6.4A IMPEDANCE AND CURRENT-CARRYING CAPABILITY - EARTHING AND POTENTIAL EQUALIZATION TEST8.7.4.5 LEAKAGE CURRENTS AND PATIENT AUXILIARY CURRENTS -MEASUREMENTS -MEASUREMENT OF THE EARTH LEAKAGE CURRENT8.7.4.6 TOUCH CURRENT8.7.4.7 PATIENT LEAKAGE CURRENT8.8.3 DIELECTRIC STRENGTH8.8.4.1 INSULATION - INSULATION OTHER THAN WIRE INSULATION
2014-05-08

MED

11 TEMPERATURE13 HAZARDOUS SITUATIONS AND FAULT CONDITIONS15.5.1.2 SHORT-CIRCUIT TEST15.5.1.3 OVERLOAD TEST4.11 POWER INPUT5.7 HUMIDITY PRECONDITIONING TREATMENT8.4.3 ME EQUIPMENT INTENDED TO BE CONNECTED TO A POWER SOURCE BY A PLUG8.4.4 INTERNAL CAPACITIVE CIRCUITS8.5.4 WORKING VOLTAGE8.6.4.A IMPEDANCE AND CURRENT-CARRYING CAPACITY8.7.4.5 MEASUREMENT OF THE EARTH LEAKGE CURRENT AND CURRENTS IN FUNCTIONAL EARTH CONNECTION8.7.4.6 MEASUREMENT OF TOUCH CURRENT8.7.4.7 MEASUREMENT OF PATIENT LEAKAGE CURRENT8.8.3 DIELECTRIC STRENGTH 8.8.4.1 BALL PRESSURE TEST
2015-03-17

MED

111315.5.1.215.5.1.34.115.78.4.38.4.48.5.48.6.4.A8.7.4.58.7.4.68.7.4.78.8.38.8.4.1
2023-08-23

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.6.2 INPUT TEST: POLYPHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT2.10.5.6 - 2.10.5.10 THIN SHEET MATERIAL2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR
2012-04-05

OFF

1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL 2.9.1, 2.9.2, 5.2.2 HUMIDITY 4.5 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.1-5.3.9 ABNORMAL OPERATION5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR
2012-04-05

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.6.2 INPUT TEST: POLYPHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR
2014-05-08

OFF

1.5.7.4/ 2.4.2 DOUBLE OR REINFORCED INSULATION BRIDGED BY COMPONENTS1.6.2/B INPUT TEST: POLYPHASE1.6.2/B INPUT TEST: SINGLE-PHASE2.10.2 DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL 4.2.1/4.2.2/4.2.3/4.2.4 STEADY FORCE TESTS5.1/ANNEX D TOUCH CURRENT TEST: SINGLE-PHASE/POLYPHASE; TN/TT SYSTEM5.3.3/5.3.6/ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.6 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD
2021-11-01