WISTRON NEWEB CORP

Address(es)
  • 20 PARK AVENUE II (OR YUANCHIU 2ND RD.), HSINCHU SCIENCE PARK, 300,
    HSINCHU
    Chinese Taipei

Website Not available
Status

WITHDRAWN

Acceptance date 2022-08-11

Further information

Stage

Country

Name

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 - DROP TEST4.4.3.4, ANNEX T.6 - IMPACT TEST4.4.3.5, ANNEX T.3 - STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.4.10, 5.4.10.2.2 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 – INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7, 5.7.4, 5.7.5 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.6 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.7 - WALL OR CEILING MOUNTING TESTS8.11.3 - RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TESTB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX H.2, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD AANNEX H.3, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD BANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.4.2 – METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N
2022-08-11

ITAV

4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.4.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.4.3, ANNEX T.7 - DROP TEST4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.5, ANNEX T.3 - STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.4.10, 5.4.10.2.2 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 - SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.5.8 – INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT5.7.7 – SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 - STATIC STABILITY8.6.3 - RELOCATION STABILITY TEST8.7 - WALL OR CEILING MOUNTING TESTS8.11.3 - RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 - RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX H.2, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD AANNEX H.3, 5.2.2.6 - CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD BANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.4.2 – METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N
2022-08-11

ITAV

5.1 POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTS5.3.1 DC Power transfer interconnection to building wiring5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE5.4.2 Requirement for the PD6.3.1.1.2 RFT-C CIRCUIT LIMITS UNDER NORMAL OPERATING CONDITIONS6.3.1.1.3 RFT-C CIRCUIT LIMITS UNDER SINGLE FAULT CONDITIONS6.3.1.1.4 RFT-C CIRCUIT LIMITS WITH ONE CONDUCTOR EARTHED6.3.1.2.1 RFT-V CIRCUIT LIMITS UNDER NORMAL OPERATING CONDITIONS6.4.2 FIRE PROTECTION REQUIREMENTS: MAXIMUM POWER AND CURRENT FROM THE RFT-V CIRCUIT6.3.1.2.2 RFT-V CIRCUIT LIMITS UNDER SINGLE FAULT CONDITIONS6.3.1.2.3 RFT-V CIRCUIT LIMITS WITH ONE CONDUCTOR EARTHED
2022-08-11

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2022-08-11

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2022-08-11

OFF

1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 - INPUT TEST: SINGLE - PHASE1.6.2 - INPUT TEST: POLY - PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.1.1.7 - CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TEST2.3.1 - TNV‐1, TNV‐2, TNV‐3 LIMITS (NORMAL)2.3.1, 2.3.4 - TNV‐1, TNV‐2, TNV‐3 LIMITS (SINGLE FAULT)2.3.1, ANNEX M.2 - Criteria For Telephone Ringing And Other Signals Test(Method A Europe)2.3.1b, ANNEX M.3.1 ‐ M.3.2.3 - Criteria For Telephone Ringing Test (Method B NorthAmerica)2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST2.10.2 - DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.2, Part 22, 6.1 - Determination of Working Voltage; Hazardous Voltage(Circuit) Measurement2.10.2 - DETERMINATION OF WORKING VOLTAGE – SECONDARY OUTPUT VOLTAGE TEST2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS2.10.5.13 - TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 - KNOB PULL/HANDLE LOADING TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.6 - DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 - Direct Plug‐In Blade Securement Test4.3.6 - Direct Plug‐In Security of Input Contacts4.3.6 - Direct Plug‐In Resistance To Crushing4.3.6 - Direct Plug‐In Rod Pressure Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 - HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST4.5.5, 4.5 - BALL PRESSURE TEST5.1, ANNEX D - TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D - TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1, ANNEX D - IT TOUCH CURRENT TEST(SINGLE – PHASE)5.1.8.1 - Limitation Of The Touch Current To A TelecommunicationsNetwork And A Cable Distribution System (Single‐Phase)5.1.8.3 - Limitation Of Touch Current Due To Ringing Signals5.2.2 - ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST5.3.7 - Power Supply Output Short‐Circuit/Overload Test5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 - Requirements For Separation Between TelecommunicationNetwork From Earth6.2.2 (6.2.2.1) - Electric Strength Test Procedure - Impulse Test6.2.2 (6.2.2.2) - Electric Strength Test Procedure ‐ Steady‐State Test7.3, 6.2.2, 6.2.2.1 - Cable Distribution System, Electric Strength Procedure, Impulse7.3, 6.2.2, 6.2.2.2 - Cable Distribution System, Electric Strength Procedure, Steady-State7.4.2 - Cable Distribution System, Voltage Surge7.4.3 - Cable Distribution System, ImpulseANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARYAnnex CC - Evaluation of Integrated Circuit (IC) Current LimitersAnnex DD - Rack Mounted Equipment ‐ Mechanical Strength
2022-08-11