Whirlpool Management EMEA S.r.l. ( Laboratorio Elettrico Cooking )
Whirlpool Management EMEA S.r.l. ( Laboratorio Elettrico Cooking )
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2017-01-02 |
Further information
Stage | Country | Name |
---|---|---|
3 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
EMC | CISPR 11:2015 | All | 2021-05-18 | |
EMC | CISPR 11:2015/AMD1:2016 | All | 2021-05-18 | |
EMC | CISPR 11:2015/AMD2:2019 | All | 2021-05-18 | |
EMC | CISPR 11:2009 | ALL CLAUSES (EXCLUDED RADIATED EMISSION TEST FROM 9 KHZ TO 18 GHZ) | 2017-01-02 | |
EMC | CISPR 11:2009/AMD1:2010 | All | 2017-03-22 | |
EMC | CISPR 14-1:2020 | 4.3.2 MEASUREMENT OF MAGNETIC FIELD INDUCED CURRENT 9 KHZ – 30 MHZ4.3.2 & 4.3.3; 5.4.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.3.3; 5.4.2 & 5.4.3 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.3.4; 5.3.3; 5.4.1 MEASUREMENT OF DISTURBANCE POWER 30 MHZ – 300 MHZ | 2021-06-14 | |
EMC | CISPR 14-1:2016 | 4.3.2 MEASUREMENT OF MAGNETIC FIELD INDUCED CURRENT 9 KHZ – 30 MHZ4.3.2 & 4.3.3; 5.4.1 MEASUREMENT OF CONDUCTED DISTURBANCES ON THE MAINS4.3.3; 5.4.2 & 5.4.3 MEASUREMENT OF DISCONTINUOUS DISTURBANCE (TERMINAL VOLTAGE)4.3.4; 5.3.3; 5.4.1 MEASUREMENT OF DISTURBANCE POWER 30 MHZ – 300 MHZ | 2018-03-07 | |
EMC | CISPR 14-2:2020 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS, RADIATED IMMUNITY UP TO 3GHZ) | 2021-06-14 | |
EMC | CISPR 14-2:2015 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-05-29 | |
EMC | CISPR 14-2:1997 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-01-02 | |
EMC | CISPR 14-2:1997/AMD1:2001 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-01-02 | |
EMC | CISPR 14-2:1997/AMD2:2008 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-01-02 | |
EMC | IEC 61000-3-2:2018 | ALL CLAUSES | 2021-05-18 | |
EMC | IEC 61000-3-2:2018/AMD1:2020 | ALL CLAUSES | 2021-06-14 | |
EMC | IEC 61000-3-2:2014 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-2:2005 | ALL CLAUSES | 2017-01-02 | |
EMC | IEC 61000-3-2:2005/AMD1:2008 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-2:2005/AMD2:2009 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-3:2013 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-3:2013/AMD1:2017 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-3:2013/AMD2:2021 | ALL CLAUSES | 2022-04-04 | |
EMC | IEC 61000-3-11:2017 | ALL CLAUSES (ONLY TEST WITH ZREF) | 2018-03-07 | |
EMC | IEC 61000-3-11:2000 | ALL CLAUSES (ONLY TEST WITH ZREF) | 2019-03-31 | |
EMC | IEC 61000-3-12:2011 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-3-12:2011/AMD1:2021 | ALL CLAUSES | 2022-04-01 | |
EMC | IEC 61000-4-2:2008 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-4-3:2020 | ALL CLAUSES (FREQUENCY RANGE LIMITED UP TO 3 GHZ) | 2021-06-14 | |
EMC | IEC 61000-4-3:2006 | ALL CLAUSES (FREQUENCY RANGE LIMITED UP TO 3 GHZ) | 2019-03-31 | |
EMC | IEC 61000-4-3:2006/AMD1:2007 | ALL CLAUSES (FREQUENCY RANGE LIMITED UP TO 3 GHZ) | 2019-03-31 | |
EMC | IEC 61000-4-3:2006/AMD2:2010 | ALL CLAUSES (FREQUENCY RANGE LIMITED UP TO 3 GHZ) | 2019-03-31 | |
EMC | IEC 61000-4-4:2012 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2018-03-08 | |
EMC | IEC 61000-4-5:2014 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2019-03-31 | |
EMC | IEC 61000-4-5:2014/AMD1:2017 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2018-03-07 | |
EMC | IEC 61000-4-5:2005 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-01-02 | |
EMC | IEC 61000-4-6:2013 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2019-03-31 | |
EMC | IEC 61000-4-6:2008 | ALL CLAUSES (EXCLUDED TESTS ON SIGNAL AND CONTROL PORTS) | 2017-01-02 | |
EMC | IEC 61000-4-11:2020 | ALL CLAUSES | 2021-06-14 | |
EMC | IEC 61000-4-11:2004 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-4-11:2004/AMD1:2017 | ALL CLAUSES | 2018-03-07 | |
EMC | IEC 61000-4-13:2002 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-4-13:2002/AMD1:2009 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-4-13:2002/AMD2:2015 | ALL CLAUSES | 2019-03-31 | |
EMC | IEC 61000-4-34:2005 | ALL CLAUSES | 2024-02-28 | |
EMC | IEC 61000-4-34:2005/AMD1:2009 | ALL CLAUSES | 2024-02-28 | |
EMC | IEC 62233:2005 | ALL CLAUSES | 2019-03-31 | |
HOUS | IEC 60335-1:2020 | 101113.213.315.215.316.216.31719.1019.11.119.11.219.11.319.11.4.119.11.4.219.11.4.319.11.4.419.11.4.519.11.4.619.11.4.719.11.4.819.1219.1419.219.319.419.519.619.719.819.920.120.221.122.1122.1222.1322.1622.4222.4722.522.622.723.323.524.525.1425.15, 25.1625.225.2126.1026.326.527.528.129.1, 29.229.2, 29.3.230.130.257.148.1.18.1.28.1.38.1.48.1.4ANNEX CANNEX DANNEX GANNEX IANNEX R | 2022-04-01 | |
HOUS | IEC 60335-1:2010 | 10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.2 MOISTURE RESISTANCE - SPILLAGE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT17 OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUIS19.10 ABNORMAL OPERATION - SERIES MOTOR19.11.1 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - LOW POWER CIRCUIT19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.11.4.1 ABNORMAL OPERATION – IMMUNITY TO ELECTROSTATIC DISCHARGES19.11.4.2 ABNORMAL OPERATION - IMMUNITY TO RADIATED FIELDS19.11.4.3 ABNORMAL OPERATION – IMMUNITY TO FAST TRANSIENTS19.11.4.4 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE SURGES19.11.4.5 ABNORMAL OPERATION – IMMUNITY TO INJECTED CURRENTS19.11.4.6 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE DIPS AND INTERRUPTIONS19.11.4.7 ABNORMAL OPERATION – IMMUNITY TO MAINS SIGNALS19.11.4.8 ABNORMAL OPERATION - UNDER VOLTAGE19.12 ABNORMAL OPERATION - MINIATURE FUSE-LINK19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT19.2 ABNORMAL OPERATION - UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION19.3 ABNORMAL OPERATION - OVER VOLTAGE & RESTRICTED HEAT DISSIPATION19.4 ABNORMAL OPERATION - SHORT CIRCUIT OF TEMPERATURE CONTROLS19.5 ABNORMAL OPERATION - TUBULAR SHEATHED OR EMBEDDED HEATING ELEMENTS19.6 ABNORMAL OPERATION - PTC HEATING ELEMENTS19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY20.2 STABILITY AND MECHANICAL HAZARDS - MECHANICAL FORCE21.1 MECHANICAL STRENGTH - SPRING HAMMER TEST22.11 CONSTRUCTION - RELIABILITY OF NON-DETACHABLE PARTS FIXING22.12 CONSTRUCTION - HANDLES, KNOBS, GRIPS, LEVERS - AXIAL PULL22.13 CONSTRUCTION - HANDLES - TEMPERATURE RISE22.16 CONSTRUCTION - AUTOMATIC CORD REEL ENDURANCE22.42 CONSTRUCTION - PROTECTIVE IMPEDANCE22.47 CONSTRUCTION - WATER PRESSURE TEST22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.6 CONSTRUCTION - LEAKAGE OF LIQUID22.7 CONSTRUCTION - EXCESSIVE PRESSURE23.3 INTERNAL WIRING - MOVABLE PARTS WIRE FLEXING23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR25.14 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - CORD FLEXING TEST25.15, 25.16 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - PUSH, PULL & TORQUE TESTS FOR FLEXIBLE CORD25.2 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - ELECTRIC STRENGTH TEST FOR MULTIPLE SUPPLY25.21 SUPPLY CONNECTION AND EXTERNAL FLEXING CORDS - CONNECTION SPACE FOR PORTABLE APPLIANCES 26.10 TERMINALS FOR EXTERNAL CONDUCTORS – CONNECTION TERMINALS FOR FLAT TWIN TINSEL CORDS26.3 TERMINALS FOR EXTERNAL CONDUCTORS - TERMINAL SECUREMENT TEST26.5 TERMINALS FOR EXTERNAL CONDUCTORS – STRANDED CONDUCTOR27.5 PROVISION FOR EARTHING - VOLTAGE DROP28.1 SCREWS AND CONNECTIONS - SCREW TORQUE TEST29.1, 29.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - STEADY FORCE ON INTERNAL BARE CONDUCTORS 29.2, CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - PROOF TRACKING TEST29.3.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION – ELECTRIC STRENGTH TEST ON INSULATION LAYERS5 GENERAL CONDITIONS FOR THE TESTS7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY8.1.1 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE B OF IEC610328.1.2 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 13 OF IEC610328.1.3 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 41 OF IEC610328.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - PROTECTIVE IMPEDANCE8.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - SELVANNEX C AGING TEST ON MOTORSANNEX D THERMAL MOTOR PROTECTORSANNEX G SAFETY ISOLATING TRANSFORMERSANNEX I MOTORS HAVING BASIC INSULATI | 2019-03-31 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | 10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.2 MOISTURE RESISTANCE - SPILLAGE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT17 OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUIS19.10 ABNORMAL OPERATION - SERIES MOTOR19.11.1 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - LOW POWER CIRCUIT19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.11.4.1 ABNORMAL OPERATION – IMMUNITY TO ELECTROSTATIC DISCHARGES19.11.4.2 ABNORMAL OPERATION - IMMUNITY TO RADIATED FIELDS19.11.4.3 ABNORMAL OPERATION – IMMUNITY TO FAST TRANSIENTS19.11.4.4 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE SURGES19.11.4.5 ABNORMAL OPERATION – IMMUNITY TO INJECTED CURRENTS19.11.4.6 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE DIPS AND INTERRUPTIONS19.11.4.7 ABNORMAL OPERATION – IMMUNITY TO MAINS SIGNALS19.11.4.8 ABNORMAL OPERATION - UNDER VOLTAGE19.12 ABNORMAL OPERATION - MINIATURE FUSE-LINK19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT19.2 ABNORMAL OPERATION - UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION19.3 ABNORMAL OPERATION - OVER VOLTAGE & RESTRICTED HEAT DISSIPATION19.4 ABNORMAL OPERATION - SHORT CIRCUIT OF TEMPERATURE CONTROLS19.5 ABNORMAL OPERATION - TUBULAR SHEATHED OR EMBEDDED HEATING ELEMENTS19.6 ABNORMAL OPERATION - PTC HEATING ELEMENTS19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY20.2 STABILITY AND MECHANICAL HAZARDS - MECHANICAL FORCE21.1 MECHANICAL STRENGTH - SPRING HAMMER TEST22.11 CONSTRUCTION - RELIABILITY OF NON-DETACHABLE PARTS FIXING22.12 CONSTRUCTION - HANDLES, KNOBS, GRIPS, LEVERS - AXIAL PULL22.13 CONSTRUCTION - HANDLES - TEMPERATURE RISE22.16 CONSTRUCTION - AUTOMATIC CORD REEL ENDURANCE22.42 CONSTRUCTION - PROTECTIVE IMPEDANCE22.47 CONSTRUCTION - WATER PRESSURE TEST22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.6 CONSTRUCTION - LEAKAGE OF LIQUID22.7 CONSTRUCTION - EXCESSIVE PRESSURE23.3 INTERNAL WIRING - MOVABLE PARTS WIRE FLEXING23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR25.14 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - CORD FLEXING TEST25.15, 25.16 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - PUSH, PULL & TORQUE TESTS FOR FLEXIBLE CORD25.2 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - ELECTRIC STRENGTH TEST FOR MULTIPLE SUPPLY25.21 SUPPLY CONNECTION AND EXTERNAL FLEXING CORDS - CONNECTION SPACE FOR PORTABLE APPLIANCES 26.10 TERMINALS FOR EXTERNAL CONDUCTORS – CONNECTION TERMINALS FOR FLAT TWIN TINSEL CORDS26.3 TERMINALS FOR EXTERNAL CONDUCTORS - TERMINAL SECUREMENT TEST26.5 TERMINALS FOR EXTERNAL CONDUCTORS – STRANDED CONDUCTOR27.5 PROVISION FOR EARTHING - VOLTAGE DROP28.1 SCREWS AND CONNECTIONS - SCREW TORQUE TEST29.1, 29.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - STEADY FORCE ON INTERNAL BARE CONDUCTORS 29.2, CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - PROOF TRACKING TEST29.3.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION – ELECTRIC STRENGTH TEST ON INSULATION LAYERS5 GENERAL CONDITIONS FOR THE TESTS7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY8.1.1 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE B OF IEC610328.1.2 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 13 OF IEC610328.1.3 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 41 OF IEC610328.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - PROTECTIVE IMPEDANCE8.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - SELVANNEX C AGING TEST ON MOTORSANNEX D THERMAL MOTOR PROTECTORSANNEX G SAFETY ISOLATING TRANSFORMERSANNEX I MOTORS HAVING BASIC INSULATI | 2019-03-31 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | 10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.2 MOISTURE RESISTANCE - SPILLAGE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT17 OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUIS19.10 ABNORMAL OPERATION - SERIES MOTOR19.11.1 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - LOW POWER CIRCUIT19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.11.4.1 ABNORMAL OPERATION – IMMUNITY TO ELECTROSTATIC DISCHARGES19.11.4.2 ABNORMAL OPERATION - IMMUNITY TO RADIATED FIELDS19.11.4.3 ABNORMAL OPERATION – IMMUNITY TO FAST TRANSIENTS19.11.4.4 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE SURGES19.11.4.5 ABNORMAL OPERATION – IMMUNITY TO INJECTED CURRENTS19.11.4.6 ABNORMAL OPERATION – IMMUNITY TO VOLTAGE DIPS AND INTERRUPTIONS19.11.4.7 ABNORMAL OPERATION – IMMUNITY TO MAINS SIGNALS19.11.4.8 ABNORMAL OPERATION - UNDER VOLTAGE19.12 ABNORMAL OPERATION - MINIATURE FUSE-LINK19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT19.2 ABNORMAL OPERATION - UNDER VOLTAGE & RESTRICTED HEAT DISSIPATION19.3 ABNORMAL OPERATION - OVER VOLTAGE & RESTRICTED HEAT DISSIPATION19.4 ABNORMAL OPERATION - SHORT CIRCUIT OF TEMPERATURE CONTROLS19.5 ABNORMAL OPERATION - TUBULAR SHEATHED OR EMBEDDED HEATING ELEMENTS19.6 ABNORMAL OPERATION - PTC HEATING ELEMENTS19.7 ABNORMAL OPERATION - STALLED CONDITIONS19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD20.1 STABILITY AND MECHANICAL HAZARDS - STABILITY20.2 STABILITY AND MECHANICAL HAZARDS - MECHANICAL FORCE21.1 MECHANICAL STRENGTH - SPRING HAMMER TEST22.11 CONSTRUCTION - RELIABILITY OF NON-DETACHABLE PARTS FIXING22.12 CONSTRUCTION - HANDLES, KNOBS, GRIPS, LEVERS - AXIAL PULL22.13 CONSTRUCTION - HANDLES - TEMPERATURE RISE22.16 CONSTRUCTION - AUTOMATIC CORD REEL ENDURANCE22.42 CONSTRUCTION - PROTECTIVE IMPEDANCE22.47 CONSTRUCTION - WATER PRESSURE TEST22.5 CONSTRUCTION - CAPACITOR DISCHARGE TEST22.6 CONSTRUCTION - LEAKAGE OF LIQUID22.7 CONSTRUCTION - EXCESSIVE PRESSURE23.3 INTERNAL WIRING - MOVABLE PARTS WIRE FLEXING23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR25.14 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - CORD FLEXING TEST25.15, 25.16 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - PUSH, PULL & TORQUE TESTS FOR FLEXIBLE CORD25.2 SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS - ELECTRIC STRENGTH TEST FOR MULTIPLE SUPPLY25.21 SUPPLY CONNECTION AND EXTERNAL FLEXING CORDS - CONNECTION SPACE FOR PORTABLE APPLIANCES 26.10 TERMINALS FOR EXTERNAL CONDUCTORS – CONNECTION TERMINALS FOR FLAT TWIN TINSEL CORDS26.3 TERMINALS FOR EXTERNAL CONDUCTORS - TERMINAL SECUREMENT TEST26.5 TERMINALS FOR EXTERNAL CONDUCTORS – STRANDED CONDUCTOR27.5 PROVISION FOR EARTHING - VOLTAGE DROP28.1 SCREWS AND CONNECTIONS - SCREW TORQUE TEST29.1, 29.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - STEADY FORCE ON INTERNAL BARE CONDUCTORS 29.2, CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION - PROOF TRACKING TEST29.3.2 CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION – ELECTRIC STRENGTH TEST ON INSULATION LAYERS5 GENERAL CONDITIONS FOR THE TESTS7.14 MARKING AND INSTRUCTIONS - MARKING DURABILITY8.1.1 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE B OF IEC610328.1.2 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 13 OF IEC610328.1.3 PROTECTION AGAINST ACCESS TO LIVE PARTS - TEST PROBE 41 OF IEC610328.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - PROTECTIVE IMPEDANCE8.1.4 PROTECTION AGAINST ACCESS TO LIVE PARTS - ACCESSIBLE PART - SELVANNEX C AGING TEST ON MOTORSANNEX D THERMAL MOTOR PROTECTORSANNEX G SAFETY ISOLATING TRANSFORMERSANNEX I MOTORS HAVING BASIC INSULATI | 2019-03-31 | |
HOUS | IEC 60335-2-6:2014 | 1011131515.1011617192020.10120.1022121.10121.10221.10321.1042222.10822.10922.11022.11122.11322.115232424.10125262728293032578 | 2019-03-31 | |
HOUS | IEC 60335-2-6:2014/AMD1:2018 | 1011131515.1011617192020.10120.1022121.10121.10221.10321.1042222.10822.10922.11022.11122.11322.115232424.10125262728293032578 | 2019-05-20 | |
HOUS | IEC 60335-2-25:2020 | 15.10115.10215.10316.1011819.10119.10119.10219.10319.10419.10520.10121.10121.10221.10321.10421.10522.10322.10522.10822.10922.11022.11122.11222.11522.11822.119.122.119.222.119.322.12022.12132 | 2020-07-17 | |
HOUS | IEC 60335-2-25:2010 | 15.10115.10215.10316.1011819.10119.10219.10319.10419.10520.10121.10121.10221.10321.10421.10522.10322.10522.10822.10922.11022.11122.11222.11522.11822.11932 | 2019-03-01 | |
HOUS | IEC 60335-2-25:2010/AMD1:2014 | 15.10115.10215.10316.1011819.10119.10219.10319.10419.10520.10121.10121.10221.10321.10421.10522.10322.10522.10822.10922.11022.11122.11222.11522.11822.11932 | 2019-03-01 | |
HOUS | IEC 60335-2-25:2010/AMD2:2015 | 15.10115.10215.10316.1011819.10119.10219.10319.10419.10520.10121.10121.10221.10321.10421.10522.10322.10522.10822.10922.11022.11122.11222.11522.11822.11932 | 2019-03-01 |