Beko Europe Management S.r.l.
Beko Europe Management S.r.l.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2017-09-04 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark | |
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
EMC | IEC 62233:2005 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2023-09-14 | |
HOUS | IEC 60335-1:2010 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2019-10-07 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2019-10-07 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2019-10-07 | |
HOUS | IEC 60335-2-7:2019 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2019-10-07 | |
HOUS | IEC 60335-2-11:2019 | All, except of§ 19.11.4.1 – to 19.11.4.7§ 22.48Clause 10 Power input and currentClause 11 HeatingClause 13.2 / 16.2 Leakage current testClause 13.3 /16.3 Electric strength testClause 15 Moisture resistanceClause 19 Abnormal Operation limited to cl.: 19.7; 19.8; 19.10; 19.11.2Clause 21.1 Mechanical strengthClause 22.6 Water leakage testClause 22.11 ConstructionClause 22.12 ConstructionClause 23.1 – Internal wiringClause 25.15 – SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS Clause 27 - Provision for earthingClause 30 Resistance to heat and fire | 2019-10-07 |