WAGO GmbH & Co. KG

Address(es)
  • Hansastrasse 27 Minden
    DE-32423 Nordrhein-Westfalen
    Germany

Website Not available
Status

MEMBER

Acceptance date 2021-12-08

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MEAS

10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES4.4.1 COMPONENT ABNORMAL TEST4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT ABNORMAL TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD ABNORMAL TEST4.4.2.8 OUTPUT ABNORMAL TEST5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.2.1 DETERMINATION OF ACCESSIBLE PARTS TEST6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.7, ANNEX K INSULATION REQUIREMENTS 6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.2 SHARP EDGES8.2.1 STATIC TEST8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST
2021-11-30

MEAS

10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES4.4.1 COMPONENT ABNORMAL TEST4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT ABNORMAL TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD ABNORMAL TEST4.4.2.8 OUTPUT ABNORMAL TEST5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.2.1 DETERMINATION OF ACCESSIBLE PARTS TEST6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.7, ANNEX K INSULATION REQUIREMENTS 6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.2 SHARP EDGES8.2.1 STATIC TEST8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST
2021-11-30

MEAS

4.4.1.101.2 ENDURANCE TEST8.2.2 IMPACT10 EQUIPMENT TEMPERATURE LIMITS AND RESISTANCE TO HEAT4.4.1.101.1 OVERLOAD TEST4.4.1.101.2 SWITCHING DEVICES - ENDURANCE TEST8.2.2 IMPACT
2021-11-30

MEAS

10.1 TEMPERATURE TEST4.4.1.101.1 OVERLOAD TEST
2021-11-30