WAGO GmbH & Co. KG
WAGO GmbH & Co. KG
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2021-12-08 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
MEAS | IEC 61010-1:2010 | 10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES4.4.1 COMPONENT ABNORMAL TEST4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT ABNORMAL TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD ABNORMAL TEST4.4.2.8 OUTPUT ABNORMAL TEST5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.2.1 DETERMINATION OF ACCESSIBLE PARTS TEST6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.7, ANNEX K INSULATION REQUIREMENTS 6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.2 SHARP EDGES8.2.1 STATIC TEST8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST | 2021-11-30 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | 10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES4.4.1 COMPONENT ABNORMAL TEST4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT ABNORMAL TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD ABNORMAL TEST4.4.2.8 OUTPUT ABNORMAL TEST5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.2.1 DETERMINATION OF ACCESSIBLE PARTS TEST6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.7, ANNEX K INSULATION REQUIREMENTS 6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.2 SHARP EDGES8.2.1 STATIC TEST8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST | 2021-11-30 | |
MEAS | IEC 61010-2-201:2017 | 4.4.1.101.2 ENDURANCE TEST8.2.2 IMPACT10 EQUIPMENT TEMPERATURE LIMITS AND RESISTANCE TO HEAT4.4.1.101.1 OVERLOAD TEST4.4.1.101.2 SWITCHING DEVICES - ENDURANCE TEST8.2.2 IMPACT | 2021-11-30 | |
MEAS | IEC 61010-2-201:2013 | 10.1 TEMPERATURE TEST4.4.1.101.1 OVERLOAD TEST | 2021-11-30 |