Vertiv Tech (Xi'an) Co., Ltd.

Address(es)
  • 55 KEJI RD 3
    XIAN HIGH-TECH IND DEVELOPMENT ZONE
    XIAN , SHANXI 710075
    China

Website Not available
Status

MEMBER

Acceptance date 2018-03-13

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, STEADY FORCE TESTS4.4.3.2, Annex T.3, STEADY FORCE TEST, 30N4.4.3.2, Annex T.4, STEADY FORCE TEST, 100N4.4.3.2, Annex T.5, STEADY FORCE TEST, 250N4.4.3.3., Annex T.7, DROP TESTS4.4.3.3, Annex T.6, IMPACT4.4.3.5, Annex T.3, STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8 THERMOPLASTIC MATERIAL TESTS5.2, CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3, BALL PRESSURE TEST5.4.1.5.2 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND5.4.1.5.3 THERMAL CYCLING TEST PROCEDURE5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7, PROSPECTIVE TOUCH VOLTAGE, TOUCH CURRENT AND PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENT6.2.3.1 ARCING PIS6.2.3.2 RESISTIVE PIS8.8, HANDLE STRENGTH Annex B.2.5 Input: Single-PhaseAnnex B.2.5 Input: PolyphaseAnnex B.2.6 OPERATING TEMPERATURE MEASUREMENT CONDITIONSAnnex B.3 SIMULATED ABNORMAL OPERATING CONDITIONSAnnex B.4 SIMULATED SINGLE FAULT CONDITIONSAnnex F.3.10 TEST FOR THE PERMANENCE OF MARKINGSAnnex G.5.3.3 TRANSFORMER OVERLOAD TESTSAnnex Q.1 LIMITED POWER SOURCE
2020-08-20

ITAV

5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 - ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.10.3 - BALL PRESSURE TEST5.4.1.8 - DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 A) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.6.6.2 B) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: EXCEEDING 25 A5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.4 - EARTHED ACCESSIBLE CONDUCTIVE PARTS6.2.2.2 - POWER MEASUREMENT: WORST-CASE FAULT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.2.3 - POWER MEASUREMENT: WORST-CASE POWER SOURCE FAULT8.8 - HANDLE STRENGTHANNEX B.2.5 - INPUT TEST: SINGLE PHASEANNEX B.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 - SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 - SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 - TRANSFORMER OVERLOAD4.4.4.2, ANNEX T.2 - STEADY FORCE TEST, 10N4.4.4.2, 4.4.4.5, ANNEX T.2 - T.5 - STEADY FORCE TEST (10N, 30N, 100N, 250N)4.4.4.2, ANNEX T.5 - STEADY FORCE TEST (250N)4.4.4.4, ANNEX T.6 - ENCLOSURE IMPACT TEST
2019-03-18

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLTAMPEREMEASUREMENT1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENT2.7 DC CIRCUIT FUSE2.10.10/2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FORINSULATING COMPOUND2.10.11, 2.10.9 TESTS FOR SEMICONDUCTOR DEVICES AND FORCEMENTED JOINTS2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ HAZARDOUSVOLTAGE (CIRCUIT) MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ SECONDARYOUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRICSTRENGTH2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.6.3.4 LIMITED SHORT‐CIRCUIT TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD3.3.8, 3.2.9 FIELD‐WIRING4.1 STABILITY4.2.1 ‐ 4.2.4 STEADY FORCE4.2.10 LOADING4.2.5, 4.2.1, PART 2210.2 IMPACT4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST: SINGLE‐PHASE/POLYPHASE:TN/TT SYSTEM5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE‐PHASE)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO ATELECOMMUNICATIONS NETWORK AND A CABLEDISTRIBUTION SYSTEM5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 ELECTRIC STRENGTH5.3.1 ‐ 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOROFF IEC 60950‐1,2nd Edition;5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOADANNEX B.7 LOCKED‐ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITSB.5/B.8 LOCKED‐ROTOR OVERLOAD/ENDURANCE
2019-03-18

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLTAMPEREMEASUREMENT1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENT2.7 DC CIRCUIT FUSE2.10.10/2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FORINSULATING COMPOUND2.10.11, 2.10.9 TESTS FOR SEMICONDUCTOR DEVICES AND FORCEMENTED JOINTS2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ HAZARDOUSVOLTAGE (CIRCUIT) MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ SECONDARYOUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRICSTRENGTH2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.6.3.4 LIMITED SHORT‐CIRCUIT TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD3.3.8, 3.2.9 FIELD‐WIRING4.1 STABILITY4.2.1 ‐ 4.2.4 STEADY FORCE4.2.10 LOADING4.2.5, 4.2.1, PART 2210.2 IMPACT4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST: SINGLE‐PHASE/POLYPHASE:TN/TT SYSTEM5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE‐PHASE)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO ATELECOMMUNICATIONS NETWORK AND A CABLEDISTRIBUTION SYSTEM5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 ELECTRIC STRENGTH5.3.1 ‐ 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOROFF IEC 60950‐1,2nd Edition;5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOADANNEX B.7 LOCKED‐ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITSB.5/B.8 LOCKED‐ROTOR OVERLOAD/ENDURANCE
2019-03-18

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLTAMPEREMEASUREMENT1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENT2.7 DC CIRCUIT FUSE2.10.10/2.10.9 TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FORINSULATING COMPOUND2.10.11, 2.10.9 TESTS FOR SEMICONDUCTOR DEVICES AND FORCEMENTED JOINTS2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ HAZARDOUSVOLTAGE (CIRCUIT) MEASUREMENT2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ SECONDARYOUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRICSTRENGTH2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.6.3.4 LIMITED SHORT‐CIRCUIT TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD3.3.8, 3.2.9 FIELD‐WIRING4.1 STABILITY4.2.1 ‐ 4.2.4 STEADY FORCE4.2.10 LOADING4.2.5, 4.2.1, PART 2210.2 IMPACT4.2.6, 4.2.1 DROP4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.5 CONNECTOR CURRENT INTERRUPTION4.3.8 BATTERY TEST4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST: SINGLE‐PHASE/POLYPHASE:TN/TT SYSTEM5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE‐PHASE)5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO ATELECOMMUNICATIONS NETWORK AND A CABLEDISTRIBUTION SYSTEM5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 ELECTRIC STRENGTH5.3.1 ‐ 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOROFF IEC 60950‐1,2nd Edition;5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOADANNEX B.7 LOCKED‐ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITSB.5/B.8 LOCKED‐ROTOR OVERLOAD/ENDURANCE
2019-03-18