Vertiv Corporation dba Geist

Address(es)
  • 1777 Yolande Ave
    Lincoln NE 68516
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2019-04-12

Further information

Stage

Country

Name

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, T.4 – STEADY FORCE TEST, 100 N4.4.3.2, T.5 – STEADY FORCE TEST, 250 N4.4.3.4, T.6 - IMPACT TEST4.4.3.5, T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.8, T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON IT SYSTEM5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON TN OR TT SYSTEM5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – THREE-PHASE EQUIPMENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATION6.6 – TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5.3, T.8, V – ACCESSIBILITY TO MOVING PARTS8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 – INPUT TEST: POLYPHASEB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSDVH – FIELD-WIRING TESTG.5.3.3 – TRANSFORMER OVERLOADG.7.3.2 – CORD STRAIN RELIEF TESTG.7.6.2.2 – STRANDED WIREM.3.2 – PROTECTION CIRCUITS FOR BATTERIESQ.1 – LIMITED POWER SOURCE5.4.1.10.3 Ball Pressure TestT.2, 5.4.2.6, 5.4.3.2, G.15.2.6 Steady Force Test, 10N6.4.3.2 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES8.11.3.1 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: DOWNWARD FORCE TEST8.11.3.2, 8.11.3.3 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: LATERAL PUSH FORCE AND END STOPS TESTS8.11.3.3 – INTEGRITY OF SLIDE-RAIL END STOPS
2022-08-24

ITAV

4.4.4.2, Annex T.4 Steady Force Test 100N 4.4.2, Annex T.5 Steady Force Test 250N 4.4.2, Annex T.3 Steady Force Test 30N 4.4.4.4, Annex T.6 Impact 4.4.4.7, Annex T8 Stress Relief 5.4.8 Humidity Conditioning 5.4.9 Electrical Strength 5.6.6(a) Resistance of the Protective Bonding System 6.3 Normal Operating Conditions Temperature B.2.5 Input Test: Single Phase B.2.5 Input Test Polyphase B.2.6 Normal Operating Conditions Temperature Measurement G.7.3.2 Strain Relief T.1, 5.4.2.6, 5.4.3.2, G.15.3.6 Steady Force Test 10N 4.4.4.5, Annex T.3 Steady Force Test for Internal Barriers and Enclosures 5.2, 5.7 Classification of electrical energy Sources 5.4.1.8 Determination of Working Voltages 5.5.2.2 Safeguards Against Capacitor Discharge after Disconnection of a Capacitor 5.7 Prospective Touch Voltage and Touch Current Measurement 6.2.2.2 Power Measurement for Worst Case Fault 6.2.2.3 Power Measurement for Worst Case Power Source Fault 6.2.3.1 Arching PIS Determination 6.2.3.2 Resistive PIS Determination 6.4.3.3 Reduction of the Likelihood of Ignition – Temperatures Limited by Fuses 6.6 Test to Determine Delivered Power: PS2 Determination 8.5.3, Annex T.8, Annex V Accessibility of Moving Parts Annex B.4 Simulated Abnormal Operating Conditions Annex B.4 Simulated Single Fault Conditions Annex G.5.3.3 Transformer Overload Annex G.7.6.2.2 Stranded Wire Annex Q.1 Limited Power Source Annex DVH Field Wiring Test 8.7 Wall or Ceiling Mounting Tests 5.4.1.4 Maximum Operating Temperature for Materials, Components and Systems 9.2.5 Touch Temperature Test M.3.2 Protection Circuits for Batteries5.4.1.10.3 Ball Pressute Test8.11.3 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 – RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS
2020-04-09

OFF

1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 1.5.6 Capacitors Bridging Double / Reinforced Insulation 1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.1 / Annex D IT Touch Current Test 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 4.3.8 Battery Test4.3.8 Lithium Battery Reverse Current Measurement Test4.5.5, 4.5 Ball Pressure TestAnnex DD Rack Mounted Equipment – Mechanical Strength
2019-08-26

OFF

1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 1.5.6 Capacitors Bridging Double / Reinforced Insulation 1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.1 / Annex D IT Touch Current Test 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 4.3.8 Battery Test4.3.8 Lithium Battery Reverse Current Measurement Test4.5.5, 4.5 Ball Pressure TestAnnex DD Rack Mounted Equipment – Mechanical Strength
2019-08-26

OFF

1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 1.5.6 Capacitors Bridging Double / Reinforced Insulation 1.5.7.4, 2.4.2 Double or Reinforced Insulation Bridged by Components 1.6.2 Input Test: Single Phase 1.6.2/B Input Test: Polyphase 2.1.1.1, 2.8.2 Access to Energized Parts 2.1.1.7 Capacitance Discharge Test 2.10.2 Determination of Working Voltage – Hazardous Voltage (Circuit) Measurement Test 2.10.2 Determination of Working Voltage – Working Voltage Measurement Test 2.2.2, 2.2.3, 2.2.4 SELV Reliability Tests 2.4.1, 2.4.2 Limited Current Circuit Measurement 2.5 Limited Power Source Measurement 2.6.1 / 2.6.3.3 Earthing Test 1 2.6.3.4, 2.6.1 Earthing Test 2 2.9.1, 2.9.2, 5.2.2 Humidity 3.2.6 / 4.2.1 / 4.2.7 Strain Relief 4.2.1 / 4.2.2 / 4.2.3 / 4.2.4 Steady Force Test 4.2.5 Impact 4.2.7 Stress Relief 4.3.5 Connector Current Interruption 4.4.2 / 4.4.4 Hazardous Moving Parts 4.5.1 / 1.4.12 / 1.4.13 Heating 5.1 / Annex D Touch Current Test: Single Phase/Polyphase; TN/TT System 5.1 / Annex D IT Touch Current Test 5.2.2 Electric Strength 5.3.1 / 5.3.4 / 5.3.6 Component Failure 5.3.1 – 5.3.9 Abnormal Operation 5.3.3 / 5.3.6B / Annex C.1 Transformer Abnormal Operation 5.3.6 Power Supply Output Short – Circuit / Overload 5.3.6 Overload of Operator Accessible Connector 4.3.8 Battery Test4.3.8 Lithium Battery Reverse Current Measurement Test4.5.5, 4.5 Ball Pressure TestAnnex DD Rack Mounted Equipment – Mechanical Strength
2019-08-26