Toshiba TEC Singapore Pte Ltd
Toshiba TEC Singapore Pte Ltd
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2008-01-10 |
Further information
Stage | Country | Name |
---|---|---|
1 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, T.3 - STEADY FORCE TEST 30N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, T.5 - STEADY FORCE TEST 250N4.4.3.4, T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.6.2 – STATIC STABILITY8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSANNEX G.5.4.6.3 – ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORSQ.1 – LIMITED POWER SOURCE | 2022-07-25 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, ANNEX T.5 - STEADY FORCE TEST 250N4.4.4.2, ANNEX T.3 - STEADY FORCE TEST 30N4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, ANNEX B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEM5.4.8 - HUMIDITY CONDITIONING5.4.9 - ELECTRIC STRENGTH TEST5.6.6.2 (a) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 - PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS8.6.2 - STATIC STABILITY8.7 - WALL OR CEILING MOUNTING TESTSB.2.5 - INPUT TEST: SINGLE PHASEB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX M.3.2 - PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.4 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYANNEX M.6.2 - LEAKAGE CURRENTS FROM BATTERY CIRCUITSANNEX Q.1 - LIMITED POWER SOURCE | 2019-10-22 | |
ITAV | IEC 62368-3:2017 | 5.1 – POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTS5.3.1 – DC POWER TRANSFER INTERCONNECTION TO BUILDING WIRING5.3.2 – DP POWER TRANSFER INTERCONNECTION TO OTHER EQUIPMENT5.4.1 - REQUIREMENT FOR THE PSE5.4.2 – REQUIREMENT FOR THE PD | 2022-07-25 | |
OFF | IEC 60950-1:2005 | 1.2.2.1 - GUIDE INFORMATION PAGE – MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 - LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2019-10-22 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.2.2.1 - GUIDE INFORMATION PAGE – MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 - LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2019-10-22 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.2.2.1 - GUIDE INFORMATION PAGE – MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST4.1 - STABILITY TESTS4.2.1, 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.7, 4.2.1 - STRESS RELIEF TEST4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, ANNEX D - ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TESTANNEX B.7 - LOCKED-ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS | 2019-10-22 |