TDK-LAMBDA AMERICAS INC.
TDK-LAMBDA AMERICAS INC.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2024-01-19 |
Further information
Stage | Country | Name |
---|---|---|
1 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | B.2.5 - Input Test: Single Phase5.4.8 – Humidity Test5.4.1.5, 9.4.1.2 - Heating Test5.4.9.1 – Electric Strength TestB.3 - Abnormal Operating Condition TestsB.3.5 - Power Supply Output Short‐Circuit/Overload B.4 - Component FailureB.2.5 - Input Test: Single Phase5.4.8 – Humidity TestB.2.6, 9.4.1.2 - Heating Test5.4.9.1 – Electric Strength TestB.3 - Abnormal Operating Condition TestsB.3.5 - Power Supply Output Short‐Circuit/Overload B.4 – Simulated Single Fault | 2024-01-19 | |
ITAV | IEC 62368-1:2014 | B.2.5 - Input Test: Single Phase5.4.8 – Humidity Test5.4.1.5, 9.4.1.2 - Heating Test5.4.9.1 – Electric Strength TestB.3 - Abnormal Operating Condition TestsB.3.5 - Power Supply Output Short‐Circuit/Overload B.4 - Component FailureB.2.5 - Input Test: Single Phase5.4.8 – Humidity TestB.2.6, 9.4.1.2 - Heating Test5.4.9.1 – Electric Strength TestB.3 - Abnormal Operating Condition TestsB.3.5 - Power Supply Output Short‐Circuit/Overload B.4 – Simulated Single Fault | 2024-01-19 | |
OFF | IEC 60950-1:2005 | 1.6.2 - Input Test: Single-Phase2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - Earthing Test I4.5.1, 1.4.12, 1.4.13, 3.3.2 - Heating (Temperature) Test5.1, Annex D - Touch Current Test (Single-Phase/ Polyphase; TN/TT System)5.2.2 - Electric Strength Test5.3.1-5.3.9.2 - Abnormal Operation Tests5.3.7 - Overload of Operator Accessible Connector Test | 2024-01-19 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.6.2 - Input Test: Single-Phase2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - Earthing Test I4.5.1, 1.4.12, 1.4.13, 3.3.2 - Heating (Temperature) Test5.1, Annex D - Touch Current Test (Single-Phase/ Polyphase; TN/TT System)5.2.2 - Electric Strength Test5.3.1-5.3.9.2 - Abnormal Operation Tests5.3.7 - Overload of Operator Accessible Connector Test | 2024-01-19 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.6.2 - Input Test: Single-Phase2.5 - Limited Power Source Measurements2.6.3.4, 2.6.1 - Earthing Test I4.5.1, 1.4.12, 1.4.13, 3.3.2 - Heating (Temperature) Test5.1, Annex D - Touch Current Test (Single-Phase/ Polyphase; TN/TT System)5.2.2 - Electric Strength Test5.3.1-5.3.9.2 - Abnormal Operation Tests5.3.7 - Overload of Operator Accessible Connector Test | 2024-01-19 |