TCL KING ELECTRICAL APPLIANCES (HUIZHOU) CO LTD

Address(es)
  • NO.78 4TH HUIFENG RD ZHONGKAI NEW & HIGH-TECH INDUSTRIES, DEVELOPMENT ZONE, HUIZHOU, 516006
    GUANGDONG
    China

Website Not available
Status

WITHDRAWN

Acceptance date 2022-12-15

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST4.4.3.7, ANNEX T.9 – GLASS FIXATION TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.2 – CLEARANCES5.4.3 – CREEPAGE DISTANCES5.4.5 – ANTENNA TERMINAL INSULATION – VOLTAGE SURGE5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.6.2 – STATIC STABILITY8.6.3.2 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 – INPUT TEST: TELEVISION RECEIVERS/MONITORSB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX Q.1 – LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 N
2022-12-15

ITAV

4.4.4.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.4.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.4.4, ANNEX T.6, ANNEX Y.6.2 – IMPACT TEST4.4.4.7, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.2 – CLEARANCES5.4.3 – CREEPAGE DISTANCES5.4.5 – ANTENNA TERMINAL INSULATION – VOLTAGE SURGE5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 – INPUT TEST: TELEVISION RECEIVERS/MONITORSB.2.6, 5.4.1.4, 6.3, 9.2, B.1.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX Q.1 – LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 N
2023-03-01

TRON

NORMAL OPERATING CONDITIONS - TEST CONDITIONS (4.2)INPUT TEST FOR TELEVISION RECEIVERS/MONITORS (4.2)FAULT CONDITIONS (4.3)FAULT CONDITIONS CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS (4.3.2, 4.3.3, 4.3.5)FAULT CONDITIONS, MAXIMUM POWER FOR AUDIO AMPLIFIER (4.3.6)FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD (4.3.10)FAULT CONDITIONS VENTILATION OPENINGS BLOCKED (4.3.11)DIELECTRIC STRENGTH AFTER FAULT CONDITIONS (11)TOUCH CURRENT AFTER FAULT CONDITIONS (11.1)MARKING DURABILITY AND LEGIBILITY (5)HEATING UNDER NORMAL OPERATING CONDITIONS (7)SOFTENING TEMPERATURE OF THERMOPLASTICS (7.2)WINDING INSULATION TEST (8.8)TOUCH CURRENT (9.1.1)WITHDRAWAL OF MAINS PLUG (9.1.6)ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST (9.1.7)SURGE TEST (10.2)HUMIDITY TREATMENT (10.3)INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT (10.4)BUMP TEST (12.1.2)VIBRATION TEST (12.1.3)IMPACT TEST (IMPACT HAMMER) (12.1.4)DIELECTRIC STRENGTH AFTER IMPACT TEST (IMPACT HAMMER) (12.1.4)STRESS RELIEF TEST (12.1.6)DETERMINATION OF WORKING VOLTAGE (13.2)SCREW SECUREMENT TEST (17.1)TEST AT 10° TO THE HORIZONTAL (19.2)VERTICAL FORCE TEST (19.3)WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST (19.7)
2023-03-01