Socomec S.a.s.
Socomec S.a.s.
Address(es) |
|
Website | https://www.socomec.com/ |
Status | MEMBER |
Acceptance date | 2024-06-14 |
Further information
Stage | Country | Name |
---|---|---|
1 | Slovenia |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
OFF | IEC 62040-1:2017 | 5.2.2.1: Clearance and creepage distances5.2.2.2: Non-accessibility test, including energy hazard test after disconnection5.2.2.4.2.2: Steady force test 30N5.2.2.4.2.2: Steady force test 250N5.2.2.4.3: Impact test5.2.2.5: Stability Test5.2.3.4: AC or DC voltage test (dielectric strength test)5.2.3.6: Protective impedance test5.2.3.7: Touch current measurement test5.2.3.8: Capacitor discharge test5.2.3.9: Limited power source, test including energy hazards test5.2.3.10: Temperature rise test5.2.3.101: Backfeed protection test5.2.3.11, 5.2.4.3: Protective equipotential bonding (SCCR)5.2.3.102: Input current5.2.3.104: Transformer protection5.2.3.4: Case insulation test5.2.4.4: Output short-circuit test5.2.3.103: Short-time withstand current5.2.3.105: Unsynchronised load transfer test5.2.4.5: Output overload test5.2.4.6: Breakdown of components test5.2.4.7: PWB short-circuit test5.2.4.8: Loss of phase test5.2.4.9.2: Inoperative blower test5.2.4.9.3: Clogged filter test5.2.4.9.4: Loss of coolant test5.2.6.3.1: Dry heat test5.2.6.3.2: Damp heat test5.2.3.7: Hydrostatic pressure test* Equipment from CB laboratory is required in addition | 2024-06-01 | |
OFF | IEC 62040-1:2017/AMD1:2021 | 5.2.2.1: Clearance and creepage distances5.2.2.2: Non-accessibility test, including energy hazard test after disconnection5.2.2.4.2.2: Steady force test 30N5.2.2.4.2.2: Steady force test 250N5.2.2.4.3: Impact test5.2.2.5: Stability Test5.2.3.4: AC or DC voltage test (dielectric strength test)5.2.3.6: Protective impedance test5.2.3.7: Touch current measurement test5.2.3.8: Capacitor discharge test5.2.3.9: Limited power source, test including energy hazards test5.2.3.10: Temperature rise test5.2.3.101: Backfeed protection test5.2.3.11, 5.2.4.3: Protective equipotential bonding (SCCR)5.2.3.102: Input current5.2.3.104: Transformer protection5.2.3.4: Case insulation test5.2.4.4: Output short-circuit test5.2.3.103: Short-time withstand current5.2.3.105: Unsynchronised load transfer test5.2.4.5: Output overload test5.2.4.6: Breakdown of components test5.2.4.7: PWB short-circuit test5.2.4.8: Loss of phase test5.2.4.9.2: Inoperative blower test5.2.4.9.3: Clogged filter test5.2.4.9.4: Loss of coolant test5.2.6.3.1: Dry heat test5.2.6.3.2: Damp heat test5.2.3.7: Hydrostatic pressure test* Equipment from CB laboratory is required in addition | 2024-06-01 | |
OFF | IEC 62040-1:2017/AMD2:2022 | 5.2.2.1: Clearance and creepage distances5.2.2.2: Non-accessibility test, including energy hazard test after disconnection5.2.2.4.2.2: Steady force test 30N5.2.2.4.2.2: Steady force test 250N5.2.2.4.3: Impact test5.2.2.5: Stability Test5.2.3.4: AC or DC voltage test (dielectric strength test)5.2.3.6: Protective impedance test5.2.3.7: Touch current measurement test5.2.3.8: Capacitor discharge test5.2.3.9: Limited power source, test including energy hazards test5.2.3.10: Temperature rise test5.2.3.101: Backfeed protection test5.2.3.11, 5.2.4.3: Protective equipotential bonding (SCCR)5.2.3.102: Input current5.2.3.104: Transformer protection5.2.3.4: Case insulation test5.2.4.4: Output short-circuit test5.2.3.103: Short-time withstand current5.2.3.105: Unsynchronised load transfer test5.2.4.5: Output overload test5.2.4.6: Breakdown of components test5.2.4.7: PWB short-circuit test5.2.4.8: Loss of phase test5.2.4.9.2: Inoperative blower test5.2.4.9.3: Clogged filter test5.2.4.9.4: Loss of coolant test5.2.6.3.1: Dry heat test5.2.6.3.2: Damp heat test5.2.3.7: Hydrostatic pressure test* Equipment from CB laboratory is required in addition | 2024-06-01 |