SL Shanghai Power Electronics Corp. (prior Ault )

Address(es)
  • 1089 Quinzhou North Rd.
    4th Fl.
    Bldg. 53

    Shanghai 200233
    China

Website Not available
Status

MEMBER

Acceptance date 2009-04-27

Further information

Stage

Country

Name

3

United States of America

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.5 STEADY FORCE TEST, 250N4.4.3.3, ANNEX T.7 DROP TEST4.4.3.4, ANNEX T.6 IMPACT4.4.3.8, ANNEX T.8 STRESS RELIEF TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS5.4.1.10.3 BALL PRESSURE TEST5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM: 25 A OR LESS5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 TRANSFORMER OVERLOADQ.1 LIMITED POWER SOURCEG.8.2.2 VARISTOR OVERLOADG.10.2, G.10.6 CONDITIONING AND OVERLOAD
2021-07-14

ITAV

4.4.4.2, T.5 STEADY FORCE TEST, 250N4.4.4.3, ANNEX T.7 DROP TEST4.4.4.4, T.6 IMPACT TEST4.4.4.7, ANNEX T.8 STRESS RELIEF TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.2.2 STEADY-STATE VOLTAGE AND CURRENT LIMITS5.4.1.10.3 BALL PRESSURE TEST5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.8.3.2 VARISTOR OVERLOAD TESTANNEX G.10.2 CONDITIONING AND RESISTOR TESTQ.1 LIMITED POWER SOURCE
2019-06-10

MED

11 TEMPERATURE11.1.1 MAXIMUM TEMPERATURE DURING NORMAL USE13 ABNORMAL OPERATION TESTING15.3.3 ENCLOSURE IMPACT15.3.4 DROP IMPACT15.3.6 MOLD STRESS RELIEF15.5.1.2 TRANSFORMER SHORT CIRCUIT15.5.1.3 TRANSFORMER - OVERLOAD TEST15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND4.11 POWER INPUT5.7 HUMIDITY CONDITIONING8.11.3.5 CORD ANCHORAGE8.11.3.6 CORD BENDING8.4.2 LIMITATION OF VOLTAGE, CURRENT OR POWER8.4.3 VOLTAGE OR CHARGE LIMITATION8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 A IMPEDANCE AND CURRENT CARRYING CAPABILITY8.7 LEAKAGE CURRENT TESTS8.8.3 DIELECTRIC VOLTAGE WITHSTAND8.8.4.1 BALL PRESSURE8.9.2 SHORT CIRCUITING IN LIEU OF SPACINGS9.4.2.1 INSTABILITY IN TRANSPORT POSITION
2015-05-04

MED

11 TEMPERATURE11.1.1 MAXIMUM TEMPERATURE DURING NORMAL USE13 ABNORMAL OPERATION TESTING15.3.3 ENCLOSURE IMPACT15.3.4 DROP IMPACT15.3.6 MOLD STRESS RELIEF15.5.1.2 TRANSFORMER SHORT CIRCUIT15.5.1.3 TRANSFORMER - OVERLOAD TEST15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND4.11 POWER INPUT5.7 HUMIDITY CONDITIONING8.11.3.5 CORD ANCHORAGE8.11.3.6 CORD BENDING8.4.2 LIMITATION OF VOLTAGE, CURRENT OR POWER8.4.3 VOLTAGE OR CHARGE LIMITATION8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 A IMPEDANCE AND CURRENT CARRYING CAPABILITY8.7 LEAKAGE CURRENT TESTS8.8.3 DIELECTRIC VOLTAGE WITHSTAND8.8.4.1 BALL PRESSURE8.9.2 SHORT CIRCUITING IN LIEU OF SPACINGS9.4.2.1 INSTABILITY IN TRANSPORT POSITION
2017-08-03

MED

4.11 POWER INPUT5.7 HUMIDITY CONDITIONING8.4.2 LIMITATION OF VOLTAGE, CURRENT OR POWER8.4.3 VOLTAGE OR CHARGE LIMITATION8.4.4 VOLTAGE LIMITATION (PART 2)8.5.4 WORKING VOLTAGE MEASUREMENTS8.6.4 A IMPEDANCE AND CURRENT CARRYING CAPABILITY8.7 LEAKAGE CURRENT TESTS8.8.3 DIELECTRIC VOLTAGE WITHSTAND8.8.4.1 BALL PRESSURE8.9.2 SHORT CIRCUITING IN LIEU OF SPACINGS8.11.3.5 CORD ANCHORAGE8.11.3.6 CORD BENDING9.4.2.1 INSTABILITY IN TRANSPORT POSITION11 TEMPERATURE13 ABNORMAL OPERATION TESTING15.3.3 ENCLOSURE IMPACT15.3.4 DROP IMPACT15.3.6 MOLD STRESS RELIEF15.5.1.2 TRANSFORMER SHORT CIRCUIT15.5.1.3 TRANSFORMER - OVERLOAD TEST15.5.2 TRANSFORMER DIELECTRIC VOLTAGE WITHSTAND
2022-10-11

MED

15.0 VOLTAGE LIMITATION - B)16E LOW VOLTAGE RELIABILITY18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.4 EARTH LEAKAGE CURRENT - F)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.5 HAND HELD EQUIPMENT FREE FALL21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)21A, B ENCLOSURE MECHANICAL STRENGTH24.0 STABILITY IN NORMAL USE4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.9 FAILURE OF COMPONENTS57.10 CREEPAGE DISTANCES AND AIR CLEARANCES57.4 CONNECTION OF POWER SUPPLY - CORD GUARD - B)57.4 CONNECTION OF POWER SUPPLY - CORD ANCHORAGE - A)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - OVERLOAD - B)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - SHORT CIRCUIT - A)57.9.4 TRANSFORMER CONSTRUCTION59.2 RESISTANCE TO HEAT - BALL PRESSURE - B)7.1 POWER INPUT
2016-08-03

MED

15.0 VOLTAGE LIMITATION - B)16E LOW VOLTAGE RELIABILITY18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.4 EARTH LEAKAGE CURRENT - F)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.5 HAND HELD EQUIPMENT FREE FALL21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)21A, B ENCLOSURE MECHANICAL STRENGTH24.0 STABILITY IN NORMAL USE4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.9 FAILURE OF COMPONENTS57.10 CREEPAGE DISTANCES AND AIR CLEARANCES57.4 CONNECTION OF POWER SUPPLY - CORD GUARD - B)57.4 CONNECTION OF POWER SUPPLY - CORD ANCHORAGE - A)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - OVERLOAD - B)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - SHORT CIRCUIT - A)57.9.4 TRANSFORMER CONSTRUCTION59.2 RESISTANCE TO HEAT - BALL PRESSURE - B)7.1 POWER INPUT
2016-08-03

MED

15.0 VOLTAGE LIMITATION - B)16E LOW VOLTAGE RELIABILITY18.0 EARTHING AND POTENTIAL EQUALIZATION - F)19.4 EARTH LEAKAGE CURRENT - F)19.4 ENCLOSURE LEAKAGE CURRENT - G)19.4 PATIENT LEAKAGE CURRENT - H)20.3 WORKING VOLTAGE MEASUREMENTS 20.4 DIELECTRIC VOLTAGE WITHSTAND21.5 HAND HELD EQUIPMENT FREE FALL21.6 PORTABLE EQUIPMENT ROUGH HANDLING - DROP - A)21A, B ENCLOSURE MECHANICAL STRENGTH24.0 STABILITY IN NORMAL USE4.10 HUMIDITY PRECONDITIONING42.0 EXCESSIVE TEMPERATURES44.5 HUMIDITY52.4.1 POWER DISSIPATION LIMIT52.5.5 IMPAIRMENT OF COOLING52.5.9 FAILURE OF COMPONENTS57.10 CREEPAGE DISTANCES AND AIR CLEARANCES57.4 CONNECTION OF POWER SUPPLY - CORD GUARD - B)57.4 CONNECTION OF POWER SUPPLY - CORD ANCHORAGE - A)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - OVERLOAD - B)57.9.1 MAINS SUPPLY TRANSFORMERS - OVERHEATING - SHORT CIRCUIT - A)57.9.4 TRANSFORMER CONSTRUCTION59.2 RESISTANCE TO HEAT - BALL PRESSURE - B)7.1 POWER INPUT
2016-08-03

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2 SELV CIRCUITS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2015-05-04

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2 SELV CIRCUITS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2015-05-04

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: SINGLE-PHASE2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2 SELV CIRCUITS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.2.1 - 4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2015-05-04