Siemens Industrial Automation Products Ltd., Chengdu

Address(es)
  • Tianyuan road No.99 High Tech Zone West, ChengDu City,Sichuan Province,PR.China
    China

Website Not available
Status

MEMBER

Acceptance date 2019-12-19

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

STEADY FORCE TEST, 250 N (4.4.3.2, T.5)STEADY FORCE TEST, 100 N (4.4.3.2, T.4)STEADY FORCE TEST, 10 N (T.2, 5.4.2.6, 5.4.3.2, G.15.2.6)IMPACT TEST (4.4.3.4, T.6)STRESS RELIEF TEST (4.4.3.8, T.8)GLASS IMPACT TEST (4.4.3.6, T.9)GLASS FIXATION TEST (4.4.3.7, T.9)CLASSIFICATION OF ELECTRICAL ENERGY SOURCES (5.2.2.1-5.2.2.6)NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT (B.2.6, 5.4.1.4, 6.3, 9.3, B.1.5)DETERMINATION OF WORKING VOLTAGE (5.4.1.8)HUMIDITY CONDITIONING (5.4.8)ELECTRIC STRENGTH TEST (5.4.9)SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST (5.4.10)TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH (5.4.11)RESISTANCE OF THE PROTECTIVE BONDING SYSTEM (5.6.6.2)TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS (5.7.4)TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON IT SYSTEM (5.7.5)POWER MEASUREMENTS (6.2.2.2, 6.2.2.3)STATIC STABILITY(8.6.2)Equipment mounted to a wall or ceiling (8.7)Handle strength test method (8.8)INPUT TEST (B.2.5)SIMULATED ABNORMAL OPERATING CONDITIONS (B.3)SIMULATED SINGLE FAULT CONDITIONS (B.4)TRANSFORMER OVERLOAD (G.5.3.3)LIMITED POWER SOURCE (Q.1)PROTECTION CIRCUITS FOR BATTERIES (M.3.2)
2022-11-04

ITAV

STEADY FORCE TEST, 250 N (4.4.4.2, ANNEX T.5)STEADY FORCE TEST, 100 N (4.4.4.2, ANNEX T.4)STEADY FORCE TEST, 10 N (5.4.2.6, 5.4.3.2, G.15.3.6, ANNEX T.2)IMPACT TEST (4.4.4.4, ANNEX T.6)STRESS RELIEF TEST (4.4.4.7, ANNEX T.8)GLASS IMPACT TEST (4.4.4.6, ANNEX T.9)CLASSIFICATION OF ELECTRICAL ENERGY SOURCES (5.2, 5.7)MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS (5.4.1.4, 6.2, 9.2.5 ANNEX B.2)DETERMINATION OF WORKING VOLTAGE (5.4.1.8)HUMIDITY CONDITIONING (5.4.8)ELECTRIC STRENGTH TEST (5.4.9)SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST (5.4.10)TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH (5.4.11)RESISTANCE OF THE PROTECTIVE BONDING SYSTEM (5.6.6.2)PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT (5.7)POWER MEASUREMENTS (6.2.2.2, 6.2.2.3)INPUT TEST (B.2.5)SIMULATED ABNORMAL OPERATING CONDITIONS (B.3)TRANSFORMER OVERLOAD(ANNEX G.5.3.3)LIMITED POWER SOURCE(ANNEX Q.1)SIMULATED SINGLE FAULT CONDITIONS (B.4)STATIC STABILITY(8.6.2)Equipment mounted to a wall or ceiling (8.7)Handle strength test method (8.8)PROTECTION CIRCUITS FOR BATTERIES (Annex M.3.2)
2020-10-12

MEAS

4.4 SINGLE FAULT CONDITION4.4.1 COMPONENT ABNORMAL4.4.2.3 Protective conductor abnormal test4.4.2.8 OUTPUT ABNORMAL TEST4.4.2.10 Cooling abnormal5.1.3 Mains supply6.2 Determination of accessible parts6.3 Limit values for accessible part test6.5.2.4 and 6.5.2.5 GROUNDING CONTINUITY TEST6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 Humidity preconditioning6.8.3 Dielectric strength tests6.10.3 Capacitor discharge test7.6 WALL MOUNTING TEST8.2.1 Static test8.2.2 Impact test9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 TEMPERATURE TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES11.6 Specially protected equipment
2019-12-19

MEAS

4.4 SINGLE FAULT CONDITION4.4.1 COMPONENT ABNORMAL4.4.2.3 Protective conductor abnormal test4.4.2.8 OUTPUT ABNORMAL TEST4.4.2.10 Cooling abnormal5.1.3 Mains supply6.2 Determination of accessible parts6.3 Limit values for accessible part test6.5.2.4 and 6.5.2.5 GROUNDING CONTINUITY TEST6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 Humidity preconditioning6.8.3 Dielectric strength tests6.10.3 Capacitor discharge test7.6 WALL MOUNTING TEST8.2.1 Static test8.2.2 Impact test9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 TEMPERATURE TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES11.6 Specially protected equipment
2019-12-19

MEAS

4.4 SINGLE FAULT CONDITION4.4.1 COMPONENT ABNORMAL4.4.2.3 Protective conductor abnormal test4.4.2.8 OUTPUT ABNORMAL TEST4.4.2.10 Cooling abnormal5.1.3 Mains supply6.2 Determination of accessible parts6.3 Limit values for accessible part test6.5.2.4 and 6.5.2.5 GROUNDING CONTINUITY TEST6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 Humidity preconditioning6.8.3 Dielectric strength tests6.10.3 Capacitor discharge test7.6 WALL MOUNTING TEST8.2.1 Static test8.2.2 Impact test9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 TEMPERATURE TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES11.6 Specially protected equipment
2019-12-19