Siemens AG, Type Test Center

Address(es)
  • Oestliche Rheinbrueckenstr. 50 76187 Karlsruhe
    Germany

Website Not available
Status

MEMBER

Acceptance date 2005-04-21

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEMANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3 BALL PRESSURE TEST5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9 ELECTRIC STRENGTH5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.6 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.3.2 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS8.5.3, ANNEX T.8, ANNEX V SAFEGUARDS AGAINST MOVING PARTS8.6.2 STATIC STABILITY8.6.3.2 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTHANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.2.3.2 CONSEQUENCE OF ENTRY TESTANNEX T.6 ENCLOSURE IMPACT TESTANNEX T.7 DROP TESTG.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORSM.3.2 PROTECTION CIRCUITS FOR BATTERIESQ.1 LIMITED POWER SOURCET.8 STRESS RELIEF
2022-03-07

ITAV

5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEMANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.10.3 BALL PRESSURE TEST5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.9 ELECTRIC STRENGTH5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS8.5.3, ANNEX T.8, ANNEX V SAFEGUARDS AGAINST MOVING PARTS8.6.2 STATIC STABILITY8.6.3.2 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTHANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSANNEX P.2.3.2 CONSEQUENCE OF ENTRY TESTANNEX T.6 ENCLOSURE IMPACT TESTANNEX T.7 DROP TESTG.5.4.6 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORSM.3.2 PROTECTION CIRCUITS FOR BATTERIESQ.1 LIMITED POWER SOURCET.8 STRESS RELIEF
2020-07-30

MEAS

10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES10.5.3 BALL PRESSURE 11.2 CLEANING11.3 SPILLAGE 11.4 OVERFLOW 11.7.1 MAXIMUM WORKING PRESSURE MEASUREMENT 11.7.2 LEAKAGE AND RUPTURE AT HIGH PRESSURE 11.7.3 LEAKAGE FROM LOW PRESSURE PARTS 13.2.2 BATTERY ABNORMAL14.3 OVER TEMPERATURE PROTECTIVE DEVICES4.4.1 COMPONENT ABNORMAL4.4.2.10 COOLING ABNORMAL4.4.2.11 HEATING DEVICE ABNORMAL 4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT4.4.2.7.3 MAINS TRANSFORMER OVERLOAD4.4.2.8 OUTPUT ABNORMAL TEST4.4.2.9 MULTI-SUPPLY ABNORMAL5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKINGS6.10.2 FITTING OF NON-DETACHABLE MAINS SUPPLY CORDS6.10.3 CAPACITOR DISCHARGE6.2.1 DETERMINATION OF ACCESSIBLE PARTS6.3 LIMIT VALUES FOR ACCESSIBLE PARTS6.5.2.3.J TIGHTENING TORQUE6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.7, ANNEX K INSULATION REQUIREMENTS6.8 DIELECTRIC VOLTAGE WITHSTAND 6.8.2 HUMIDITY CONDITIONING 7.2 SHARP EDGES7.4 STABILITY 1 METER7.5.2 HANDLES AND GRIPS7.5.3 LIFTING DEVICES AND SUPPORTING PARTS7.6 WALL MOUNTING8.2.1 STATIC TEST8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST
2019-05-30

MEAS

10.1-10.4 TEMPERATURE TEST10.5.1 RESISTANCE TO HEAT-INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT-NONMETALLIC ENCLOSURE10.5.3 BALL PRESSURE 11.2 CLEANING11.3 SPILLAGE 11.4 OVERFLOW 11.7.1 MAXIMUM WORKING PRESSURE MEASUREMENT 11.7.2 LEAKAGE AND RUPTURE AT HIGH PRESSURE 11.7.3 LEAKAGE FROM LOW PRESSURE PARTS 13.2.2 BATTERY ABNORMAL14.3 OVER TEMPERATURE PROTECTIVE DEVICES4.4.1 COMPONENT ABNORMAL4.4.2.10 COOLING ABNORMAL4.4.2.11 HEATING DEVICE ABNORMAL 4.4.2.12 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT4.4.2.7.3 MAINS TRANSFORMER OVERLOAD4.4.2.8 OUTPUT ABNORMAL4.4.2.9 MULTI-SUPPLY ABNORMAL5.1.3 MAINS SUPPLY5.3 DURABILITY OF MARKINGS6.10.2.2 CORD ANCHORAGE6.10.3C PLUGS AND CONNECTORS6.2 DETERMINATION OF ACCESSIBLE PARTS6.5.2.3.J TIGHTENING TORQUE6.5.2.4 IMPEDANCE OF PROTECTIVE BONDING PLUG-CONNECTED EQUIPMENT6.5.2.5 IMPEDANCE OF PROTECTIVE BONDING OF PERMANENTLY CONNECTED EQUIPMENT6.7 INSULATION RESISTANCE6.8 DIELECTRIC VOLTAGE WITHSTAND 6.8.2 HUMIDITY PRECONDITIONING7.2 SHARP EDGES7.4 STABILITY7.5.2 HANDLES AND GRIPS7.5.3 LIFTING DEVICES AND SUPPORTING PARTS7.6 WALL MOUNTING8.2.1 ENCLOSURE RIGIDITY TEST- STATIC8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD AND DIRECT PLUG-IN8.3.2 DROP TEST HAND-HELD AND DIRECT PLUG-IN9.4 LIMITED ENERGY CIRCUIT DETERMINATION
2020-12-15

MEAS

10 EQUIPMENT TEMPERATURE LIMITS AND RESISTANCE TO HEAT6.2.101 ACCESSIBILITY OF INTERFACES, PORTS AND TERMINALS6.5.2.5 IMPEDANCE OF PROTECTIVE BONDING OF PERMANENTLY CONNECTED EQUIPMENT6.7 INSULATION REQUIREMENTS8.2.2 IMPACT
2020-07-30

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT: SINGLE-PHASE2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TESTMTL MTL1.7.11 DURABILITY2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.10.2, PART 22 6.1 DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT)2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.9.1, 2.9.2, 5.2.2 HUMIDITY4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.3.8 BATTERY TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5 HEATING4.5.5, 4.5 BALL PRESSURE4.6.5 BARRIER ADHESIVE5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITSANNEX CC EVALUATION OF INTEGRATED CIRCUIT (IC) CURRENT LIMITERSANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2019-05-30

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT: SINGLE-PHASE2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TESTMTL MTL1.7.11 DURABILITY2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.10.2, PART 22 6.1 DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT)2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.9.1, 2.9.2, 5.2.2 HUMIDITY4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.3.8 BATTERY TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5 HEATING4.5.5, 4.5 BALL PRESSURE4.6.5 BARRIER ADHESIVE5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITSANNEX CC EVALUATION OF INTEGRATED CIRCUIT (IC) CURRENT LIMITERSANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2019-05-30

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST1.6.2 INPUT TEST: POLYPHASE1.6.2 INPUT: SINGLE-PHASE2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TESTMTL MTL1.7.11 DURABILITY2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.10.2, PART 22 6.1 DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT)2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.9.1, 2.9.2, 5.2.2 HUMIDITY4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.3.8 BATTERY TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5 HEATING4.5.5, 4.5 BALL PRESSURE4.6.5 BARRIER ADHESIVE5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE - STEADY-STATE TESTANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITSANNEX CC EVALUATION OF INTEGRATED CIRCUIT (IC) CURRENT LIMITERSANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2019-05-30