Siam Compressor Industry Co., Ltd.

Address(es)
  • Laem Chabang Industrial Estate
    87/10 Moo 2, Sukhumvit Rd., Tungsukhla, Sriracha, 20230
    Chonburi
    Thailand

Website Not available
Status

MEMBER

Acceptance date 2023-05-19

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

7 – Marking and instructions 8 – Protection against access to live parts 11 – Heating 13 – Leakage current and electric strength at operating temperature 14 – Transient overvoltages 15 – Moisture resistance 16 – Leakage current and electric strength 17 – Overload protection of transformers and associated circuits 18 – Endurance 19 – Abnormal operation 20 – Stability and mechanical hazards 21 – Mechanical strength 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 28 – Screws and connections 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts 11 – Heating 13 – Leakage current and electric strength at operating temperature 14 – Transient overvoltages 15 – Moisture resistance 16 – Leakage current and electric strength 17 – Overload protection of transformers and associated circuits 18 – Endurance 19 – Abnormal operation 20 – Stability and mechanical hazards 21 – Mechanical strength 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 28 – Screws and connections 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts 11 – Heating 13 – Leakage current and electric strength at operating temperature 14 – Transient overvoltages 15 – Moisture resistance 16 – Leakage current and electric strength 17 – Overload protection of transformers and associated circuits 18 – Endurance 19 – Abnormal operation 20 – Stability and mechanical hazards 21 – Mechanical strength 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 28 – Screws and connections 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts11– Heating 13 – Leakage current and electric strength at operating temperature 15 – Moisture resistance 16 – Leakage current and electric strength 18 – Endurance 19 – Abnormal operation 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts11– Heating 13 – Leakage current and electric strength at operating temperature 15 – Moisture resistance 16 – Leakage current and electric strength 18 – Endurance 19 – Abnormal operation 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts11– Heating 13 – Leakage current and electric strength at operating temperature 15 – Moisture resistance 16 – Leakage current and electric strength 18 – Endurance 19 – Abnormal operation 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19

HOUS

7 – Marking and instructions 8 – Protection against access to live parts11– Heating 13 – Leakage current and electric strength at operating temperature 15 – Moisture resistance 16 – Leakage current and electric strength 18 – Endurance 19 – Abnormal operation 22 – Construction 23 – Internal wiring 24 – Components 25 – Supply connection and external flexible cord 26 – Terminals for external conductors 27 – Provision for earthing 29 – Clearances, creepage distances and solid insulation 30 – Resistance to heat and fire 31 – Resistance to rusting
2023-05-19