Shenzhen Huntkey Electric Co. Ltd.
Shenzhen Huntkey Electric Co. Ltd.
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2022-02-07 |
Further information
Stage | Country | Name |
---|---|---|
2 | Canada |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2014 | 4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TES4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENTTEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUTCONTACTS4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTSAND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST8.8 HANDLE STRENGTHANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.7.3.2 STRAIN RELIEF TESTANNEX Q.1 LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) STEADY FORCE TEST, 10 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENTTEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUTCONTACTS4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTSAND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST8.8 HANDLE STRENGTHANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.7.3.2 STRAIN RELIEF TESTANNEX Q.1 LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) STEADY FORCE TEST, 10 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 N ANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST | 2022-02-07 |