SHENZHEN HUNTKEY ELECTRIC CO LTD

Address(es)
  • HUNTKEY INDUSTRIAL PARK BANXUE RD
    BANTIAN SHENZHEN GUANGDONG 518129
    China

Website Not available
Status

MEMBER

Acceptance date 2017-07-19

Further information

Stage

Country

Name

1

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

STEADY FORCE TEST, 250 N (4.4.3.2, ANNEX T.5)STEADY FORCE TEST, 100 N (4.4.3.2, ANNEX T.4)STEADY FORCE TEST, 30 N (4.4.3.2, ANNEX T.3)STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER(4.4.3.5, ANNEX T.3)DROP TEST (4.4.3.3, ANNEX T.7)IMPACT TEST (4.4.3.4, ANNEX T.6)STRESS RELIEF TEST (4.4.3.8, ANNEX T.8)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST(4.7)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST(4.7)WEIGHT AND MOMENT DETERMINATION: (DIRECT PLUG-IN UNIT) TEST(4.7)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS(4.7)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING(4.7)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST(4.7)EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES) (4.7)CLASSIFICATION OF ELECTRICAL ENERGY SOURCES (5.2.2.1- 5.2.2.6)ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS (5.3.2.2)TEST FOR HYGROSCOPIC MATERIALS(5.4.1.3)BALL PRESSURE TEST(5.4.1.10.3)MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS(5.4.1.4, 6.3, 9.3 ANNEX B.1.5)DETERMINATION OF WORKING VOLTAGE (5.4.1.8)SEPARABLE THIN SHEET MATERIAL (5.4.4.6.2)HUMIDITY CONDITIONING (5.4.8)ELECTRIC STRENGTH TEST (5.4.9)SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF ACONNECTOR (5.5.2.2)RESISTANCE OF THE PROTECTIVE BONDING SYSTEM (5.6.6.2)TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE CONDUCTIVE PARTS (5.7.4)TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS (5.7.5)POWER MEASUREMENTS (6.2.2.2, 6.2.2.3)INPUT TEST (B.2.5)NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT(B.1.5, B.2.6, 5.4.1.4, 6.3, 9.3)SIMULATED ABNORMAL OPERATING CONDITIONS (B.3)SIMULATED SINGLE FAULT CONDITIONS (B.4)TEST FOR THE PERMANENCE OF MARKINGS(ANNEX F.3.10)TRANSFORMER OVERLOAD(ANNEX G.5.3.3)STRAIN RELIEF TEST(ANNEX G.7.3.2)VARISTOR OVERLOAD TEST(ANNEX G.8.2.2 )LIMITED POWER SOURCE(ANNEX Q.1)STEADY FORCE TEST, 10 N(ANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N)
2020-08-19

ITAV

4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 BALL PRESSURE TEST5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.5 (G.10.3.2) ANTENNA TERMINAL INSULATION – VOLTAGE SURGE5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TESTANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX G.7.3.2 STRAIN RELIEF TESTANNEX Q.1 LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST
2019-07-17

ITAV

5.3.1 DC Power transfer interconnection to building wiring5.3.1 DC Power transfer interconnection to building wiring5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE
2020-08-19

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.7.11 Durability of Marking2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material2.10.5.13 Transformer and Wire /Insulation Electric Strength3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.2.10 Loading - Wall and Ceiling Mounted Equipment4.3.6 Direct Plug-In Equipment-Moment4.3.6 Direct Plug-In Blade Securement4.3.6 Direct Plug-In Security of Input Contacts4.3.6 Direct Plug-In Resistance to Crushing4.3.6 Direct Plug-In Rod Pressure4.3.6 Direct Plug-In Input Blade Endurance4.4.2, 4.4.4 Hazardous Moving Parts4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal operation Test5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-circuit/overload Test
2019-07-17

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.7.11 Durability of Marking2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material2.10.5.13 Transformer and Wire /Insulation Electric Strength3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.2.10 Loading - Wall and Ceiling Mounted Equipment4.3.6 Direct Plug-In Equipment-Moment4.3.6 Direct Plug-In Blade Securement4.3.6 Direct Plug-In Security of Input Contacts4.3.6 Direct Plug-In Resistance to Crushing4.3.6 Direct Plug-In Rod Pressure4.3.6 Direct Plug-In Input Blade Endurance4.4.2, 4.4.4 Hazardous Moving Parts4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal operation Test5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-circuit/overload Test
2019-07-17

OFF

1.2.2.1 Guide Information Page - Maximum Output Voltage, Current, and Volt Ampere Measurement1.6.2 Input: Single-Phase1.7.11 Durability of Marking2.1.1.5, 2.1.2, 1.2.8.10 Energy Hazard Measurements2.1.1.7 Capacitance Discharge2.2.2, 2.2.3, 2.2.4 SELV Reliability Test Including Hazardous Voltage Measurements2.4.1, 2.4.2 Limited Current Circuit Measurement2.5 Limited Power Source Measurements2.6.3.4, 2.6.1 Protective Bonding I2.6.3.4, 2.6.1 Protective Bonding II2.9.1, 2.9.2, 5.2.2 Humidity2.10.2 Determination of Working Voltage; Working Voltage Measurement2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material2.10.5.13 Transformer and Wire /Insulation Electric Strength3.2.6, 4.2.1, 4.2.7 Strain Relief4.1 Stability4.2.1 - 4.2.4 Steady Force4.2.5, 4.2.1, Part 22 10.2 Impact4.2.6, 4.2.1 Drop4.2.7, 4.2.1 Stress Relief4.2.10 Loading - Wall and Ceiling Mounted Equipment4.3.6 Direct Plug-In Equipment-Moment4.3.6 Direct Plug-In Blade Securement4.3.6 Direct Plug-In Security of Input Contacts4.3.6 Direct Plug-In Resistance to Crushing4.3.6 Direct Plug-In Rod Pressure4.3.6 Direct Plug-In Input Blade Endurance4.4.2, 4.4.4 Hazardous Moving Parts4.5.1, 1.4.12, 1.4.13 Heating4.5.5, 4.5 Ball Pressure5.1, Annex D Touch Current (Single-Phase; TN/TT System)5.2.2 Electric Strength Test5.3.1, 5.3.4, 5.3.7 Component Failure Test5.3.1 - 5.3.9 Abnormal operation Test5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test5.3.7 Power Supply Output Short-circuit/overload Test
2019-07-17