Schneider Electric / DBA Telemecanique

Address(es)
  • Zone Industrielle,
    BP 660,
    FR- 16340 L'isle D'espagnac
    France

Website Not available
Status

MEMBER

Acceptance date 2019-01-30

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

POW

9.4.2 TEST FOR EMC-IMMUNITYAnnex C Degrees of protection of enclosed equipment9.2.9 Test of earth continuity for protective earth
2023-10-09

POW

8.1.4 CLEARANCES AND CREEPAGE DISTANCES9.2.5.1 GENERAL CONDITIONS FOR TESTS - Mechanical and electrical properties of terminals9.2.5.2 TESTS OF MECHANICAL STRENGTH OF TERMINALS9.2.5.3 TESTING FOR DAMAGE TO AND ACCIDENTAL LOOSENING OF CONDUCTORS (FLEXION TEST)9.2.5.4 PULL-OUT TEST9.2.5.5 TEST FOR INSERTABILITY OF UNPREPARED ROUND COPPER CONDUCTORS HAVING THE MAXIMUM CROSS-SECTION9.2.5.7 ELECTRICAL PERFORMANCE OF SCREWLESS-TYPE CLAMPING UNITS9.2.5.8 AGEING TEST FOR SCREWLESS-TYPE CLAMPING UNITS9.2.5 VERIFICATION OF ACTUATING FORCE (OR MOMENT)9.2.7 VERIFICATION OF LIMITATION OF ROTATION OF A ROTARY SWITCH9.3.3.3 TEMPERATURE RISE9.3.3.4 DIELECTRIC PROPERTIES9.3.3.5.3 MAKING AND BREAKING CAPACITIES OF SWITCHING ELEMENTS UNDER NORMAL CONDITIONS9.3.3.5.4 MAKING AND BREAKING CAPACITIES OF SWITCHING ELEMENTS UNDER ABNORMAL CONDITIONS9.3.3.5.6 B) Results to obtain (b) DIELECTRIC VERIFICATION9.4.2 ELECTROMAGNETIC COMPATIBILITY (EMC) - IMMUNITYK.9.3.6 VERIFICATION OF DIRECT OPENING ACTIONK.9.3.7 VERIFICATION OF ROBUSTNESS OF THE ACTUATING SYSTEM9.3.1 Sequence V - Degree of protection of enclosed control circuit devices TEST 1 And 29.2.11 BREAKDOWN OF COMPONENT TESTANNEX F Class II control circuit devices –Requirements and testsANNEX G Additional requirements for control circuit devices with integrally connected cables
2025-02-26

POW

7.1.4 CLEARANCES AND CREEPAGE DISTANCES8.2.4.1 GENERAL CONDITIONS FOR TESTS - Mechanical and electrical properties of terminals8.2.4.2 TESTS OF MECHANICAL STRENGTH OF TERMINALS8.2.4.3 TESTING FOR DAMAGE TO AND ACCIDENTAL LOOSENING OF CONDUCTORS (FLEXION TEST)8.2.4.4 PULL-OUT TEST8.2.4.5 TEST FOR INSERTABILITY OF UNPREPARED ROUND COPPER CONDUCTORS HAVING THE MAXIMUM CROSS-SECTION8.2.4.7 ELECTRICAL PERFORMANCE OF SCREWLESS-TYPE CLAMPING UNITS8.2.4.8 AGEING TEST FOR SCREWLESS-TYPE CLAMPING UNITS8.2.5 VERIFICATION OF ACTUATING FORCE (OR MOMENT)8.2.6 VERIFICATION OF LIMITATION OF ROTATION OF A ROTARY SWITCH8.3.3.3 TEMPERATURE RISE8.3.3.4 DIELECTRIC PROPERTIES8.3.3.5.2 MAKING AND BREAKING CAPACITIES OF SWITCHING ELEMENTS UNDER NORMAL CONDITIONS8.3.3.5.3 MAKING AND BREAKING CAPACITIES OF SWITCHING ELEMENTS UNDER ABNORMAL CONDITIONS8.3.3.5.6 B) DIELECTRIC VERIFICATION8.4.2 ELECTROMAGNETIC COMPATIBILITY (EMC) - IMMUNITYK.8.3.6 VERIFICATION OF DIRECT OPENING ACTIONK.8.3.7 VERIFICATION OF ROBUSTNESS OF THE ACTUATING SYSTEM8.3.1 Sequence V - Degree of protection of enclosed control circuit devices
2019-08-20

POW

6.3 ADDITIONAL REQUIREMENTS FOR BUTTON TYPE EMERGENCY STOP DEVICE7.3.2 ROBUSTNESS OF A BUTTON ACTUATOR7.3.3 DURABILITY TEST7.4 CONDITIONING PROCEDURES7.5 SHOCK TEST7.6 VIBRATION TEST7.7.2 OPENING TEST7.7.3 LATCHING TEST7.7.4 RESETTING TEST7.7.5 IMPACT TEST FOR BUTTON TYPE ACTUATORS
2019-08-20

POW

6.3 ADDITIONAL REQUIREMENTS FOR BUTTON TYPE EMERGENCY STOP DEVICE7.3.2 ROBUSTNESS OF A BUTTON ACTUATOR7.3.3 DURABILITY TEST7.4 CONDITIONING PROCEDURES7.5 SHOCK TEST7.6 VIBRATION TEST7.7.2 OPENING TEST7.7.3 LATCHING TEST7.7.4 RESETTING TEST7.7.5 IMPACT TEST FOR BUTTON TYPE ACTUATORS
2019-08-20

POW

6.3 ADDITIONAL REQUIREMENTS FOR BUTTON TYPE EMERGENCY STOP DEVICE7.3.2 ROBUSTNESS OF A BUTTON ACTUATOR7.3.3 DURABILITY TEST7.4 CONDITIONING PROCEDURES7.5 SHOCK TEST7.6 VIBRATION TEST7.7.2 OPENING TEST7.7.3 LATCHING TEST7.7.4 RESETTING TEST7.7.5 IMPACT TEST FOR BUTTON TYPE ACTUATORS
2019-08-20