Schneider Electric (China) Co Ltd Shanghai Pudong Branch

Address(es)
  • Building 5 No. 3000, Longdong Avenue, 201203
    Shanghai
    China

Website Not available
Status

MEMBER

Acceptance date 2023-05-29

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

OFF

WORKING VOLTAGE MEASUREMENT, CLEARANCES AND CREEPAGE DISTANCES TEST, DISTANCE THROUGH INSULATION MEASUREMENTS:(Clause 4.4.7.4 to 4.4.7.5/RD, 4.4.7.8.3.2/RD to 4.4.7.9 4 5.2.2.1)INGRESS PROTECTION TEST (IP RATING): (Clause 4.4.4.3, 5.2.2.2, RD 5.2.2.3)STEADY FORCE TEST (30 N and /or 250 N):( Clause 5.2.2.4.2.2 and Clause 5.2.2.4.2.3)IMPACT TEST:(Clause 5.2.2.4.3)STRESS RELIEF TEST:(Clause 5.2.2.4.5)STABILITY TEST:(Clause 5.2.2.5)IMPULS VOLTAGE TEST, ALTERNATE TO IMPULSE VOLTAGE TEST:(Clause 5.2.3.2, 5.2.3.3)AC OR D.C. VOLTAGE TEST:(Clause 5.2.3.4.2)PARTIAL DISCHARGE TEST:(Clause 5.2.3.5)PROTECTIVE IMPEDANCE TEST:(Clause 5.2.3.6)PROTECTIVE IMPEDANCE DISCHARGE ENERGY TEST:(Clause 4.4.5.4)TOUCH CURRENT MEASUREMENT TEST:(Clause 5.2.3.7)CAPACITOR DISCHARGE TEST:(Clause 5.2.3.8)CAPACITOR DISCHARGE TEST (Capacitors mounted behind a panel):(Clause 4.5.2, RD 4.5.2)LIMITED POWER SOURCE TEST:(Clause 5.2.3.9)TEMPERATURE RISE TEST:(Clause 5.2.3.10)PROTECTIVE EQUIPOTENTIAL BONDING IMPEDANCE TEST:(Clause 5.2.3.11.2)BACKFEED PROTECTION TEST:(Clause 5.2.3.101)INPUT CURRENT TEST:(Clause 5.2.3.102)ABNORMAL OPERATION AND SIMULATED FAULTS TESTS:(Clause 5.2.4, RD 5.2.4)PROTECTIVE EQUIPOTENTIAL BONDING SHORT CIRCUIT WITHSTAND TEST:(Clause 5.2.4.3)OUTPUT SHORT-CIRCUIT TEST:(Clause 5.2.4.4)OUTPUT OVERLOAD TEST:(Clause 5.2.4.5)BREAKDOWN OF COMPONENTS TEST:(Clause 5.2.4.6)PWB SHORT CIRCUIT TEST:(Clause 5.2.4.7)LOSS OF PHASE TEST:(Clause 5.2.4.8)COOLING FAILURE TESTS:(Clause 5.2.4.9)DRY HEAT TEST:(Clause 5.2.6.3.1)DAMP HEAT TEST:(Clause 5.2.6.3.2)BATTERY OVERCHARGE TEST(Annex CC, CC.4)
2023-05-29