SAMSUNG ELECTRONICS CO LTD

Address(es)
  • 129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677
    Korea, Republic of

Website Not available
Status

MEMBER

Acceptance date 2012-09-18

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.5, ANNEX T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.6, ANNEX T.9 – GLASS IMPACT TEST4.4.3.7, ANNEX T.9 – GLASS FIXATION TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST4.4.3.10, ANNEX T.10 – GLASS FRAGMENTATION TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.2 – VICAT TEST5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.5 – ANTENNA TERMINAL INSULATION – VOLTAGE SURGE5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.5.8 – INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATION6.3.1 [IEC 60695-2-11] – GLOW-WIRE FLAMMABILITY TEST6.6 – TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: PRODUCTS CONTAINING AN AUDIO AMPLIFIERB.2.5 – INPUT TEST: TELEVISION RECEIVERS/MONITORSB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.3.3 – TRANSFORMER OVERLOADG.10.3 – RESISTOR TEST, G.10.2 - CONDITIONINGG.10.6 – OVERLOAD TEST- FOR RESISTORS USED AS A CAPACITOR DISCHARGE SAFEGUARDP.4.2 – METALLIZED COATINGS AND ADHESIVES SECURING PARTSQ.1 – LIMITED POWER SOURCET.2, 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 NY.5.3 – WATER SPRAY TESTY.6.2 – OUTDOOR ENCLOSURE IMPACT TEST
2020-09-01

ITAV

5.1 POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTS5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE
2020-09-01

OFF

1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 KNOB PULL/HANDLE LOADING TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2021-12-21

OFF

1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 KNOB PULL/HANDLE LOADING TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2021-12-21

OFF

1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 KNOB PULL/HANDLE LOADING TEST4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2021-12-21

OFF

10.2 – IMPACT TESTANNEX B – WATER SPRAY TEST
2019-08-20

TRON

4.2 - INPUT TEST4.3 - FAULT CONDITIONS4.3.2, 4.3.3, 4.3.5 - FAULT CONDITIONS CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS4.3.6 - FAULT CONDITIONS, MAXIMUM POWER FOR AUDIO AMPLIFIER4.3.7 - FAULT CONDITIONS, STALLED ROTOR4.3.10 - FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD4.3.11 - FAULT CONDITIONS VENTILATION OPENINGS BLOCKED4.3.12 - FAULT CONDITIONS, REVERSED POLARITY TEST ON BATTERIES4.3.16 - FAULT CONDITIONS, APPARATUS SUPPLIED BY SUPPLY APPARATUS4.3.17 - FAULT CONDITIONS, APPARATUS WITH CHARGING CIRCUIT11 - DIELECTRIC STRENGTH AFTER FAULT CONDITIONS11.1 - TOUCH CURRENT AFTER FAULT CONDITIONS5 - MARKING DURABILITY AND LEGIBILITY7 - HEATING UNDER NORMAL OPERATING CONDITIONS7.2 - SOFTENING TEMPERATURE OF THERMOPLASTICS8.8 - WINDING INSULATION TEST9.1.1 - TOUCH CURRENT9.1.6 - WITHDRAWAL OF MAINS PLUG9.1.7 - ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST10.2 - SURGE TEST10.3 - HUMIDITY TREATMENT10.4 - INSULATION RESISTANCE AND DIELECTRIC STRENGTH12.1.2 - BUMP TEST12.1.3 - VIBRATION TEST12.1.4 - IMPACT TEST12.1.5 - DROP TEST12.1.6 - STRESS RELIEF TEST13.2 - DETERMINATION OF WORKING VOLTAGE14.2 - RESISTOR DAMP HEAT TESTS15.2 - PROTECTIVE EARTH TERMINAL RESISTANCE TEST16.5 - MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST17.1 - SCREW SECUREMENT TEST19.2 - TEST AT 10° TO THE HORIZONTAL19.3 - VERTICAL FORCE TEST19.4 - HORIZONTAL FORCE TEST19.6.1 - MECHANICAL STRENGTH OF GLASS19.7 - WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST20 - PWB VOLTAGE AND POWER MEASUREMENT TEST
2019-07-12