Rockwell Collins STS

Address(es)
  • 600 Komas Drive
    Salt Lake City UT 84108
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2021-03-22

Further information

Stage

Country

Name

1

Germany

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

clauses Annex T Safeguard robustness 4.4.4Annex P Likelihood of fire or shock due to entry of conductive object 4.95.6.6 Resistance of protective conductors and terminations5.2.2 Steady State Voltage and Current conditions 5.4.1.4, 6.3.2, 9.0, B.2.6 Maximum operating temperature for insulating materials, Thermal Burn Injury5.4.9 Electric Strength6.2 Power source circuit classifications8.6 StabilityB.2.5 Input testB.3 ,B4 Abnormal Operating Conditions
2022-04-11

ITAV

only:Annex T Safeguard robustness 4.4.4Annex P Likelihood of fire or shock due to entry of conductive object 4.95.6.6 Resistance of protective conductors and terminations5.2.2 Steady State Voltage and Current conditions 5.4.1.4, 6.3.2, 9.0, B.2.6 Maximum operating temperature for insulating materials, Thermal Burn Injury5.4.9 Electric Strength6.2 Power source circuit classifications8.6 StabilityB.2.5 Input testB.3 ,B4 Abnormal Operating Conditions
2021-03-22

ITAV

5 Power transfer using ES1 or ES2 voltages
2022-04-11

OFF

only:1.6.2 Input Test2.1.1.1 Accessibility to Energized parts (test finger, test pin)2.2 SELV circuits2.6.3 Earthing Test2.10 Creepage and clearance3.1.9 Termination of conductors – 10N pull test4.5 Temperature Test5.1 Touch current measurement5.2 Electric strength Test5.3 AbnormalsAnnex C Testing on Transformers
2021-03-22

OFF

only:1.6.2 Input Test2.1.1.1 Accessibility to Energized parts (test finger, test pin)2.2 SELV circuits2.6.3 Earthing Test2.10 Creepage and clearance3.1.9 Termination of conductors – 10N pull test4.5 Temperature Test5.1 Touch current measurement5.2 Electric strength Test5.3 AbnormalsAnnex C Testing on Transformers
2021-03-22

OFF

only:1.6.2 Input Test2.1.1.1 Accessibility to Energized parts (test finger, test pin)2.2 SELV circuits2.6.3 Earthing Test2.10 Creepage and clearance3.1.9 Termination of conductors – 10N pull test4.5 Temperature Test5.1 Touch current measurement5.2 Electric strength Test5.3 AbnormalsAnnex C Testing on Transformers
2021-03-22