REGAL BELOIT AMERICA INC

Address(es)
  • 531 N 4TH ST
    TIPP CITY, 45371-1857
    OH,
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2020-12-09

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

HOUS

10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - LOCKED ROTOR19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR27.5 EARTHING IMPEDANCE TEST19.11.4.8 RELIABILITY OF PROGRAMMABLE COMPONENTS22.18 INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST19.11.4.1 ELECTROSTATIC DISCHARGE19.11.4.3 ELECTRICAL FAST TRANSIENT 19.11.4.4 SURGE IMMUNITY TEST19.11.4.6 VOLTAGE DIPS, VOLTAGE INTERRUPTIONS AND VOLTAGE VARIATIONS IN THE POWER SUPPLY NETWORK
2022-05-03

HOUS

10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - LOCKED ROTOR19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR27.5 EARTHING IMPEDANCE TEST19.11.4.8 RELIABILITY OF PROGRAMMABLE COMPONENTS22.18 INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST19.11.4.1 ELECTROSTATIC DISCHARGE19.11.4.3 ELECTRICAL FAST TRANSIENT 19.11.4.4 SURGE IMMUNITY TEST19.11.4.6 VOLTAGE DIPS, VOLTAGE INTERRUPTIONS AND VOLTAGE VARIATIONS IN THE POWER SUPPLY NETWORK
2020-12-09

HOUS

10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - LOCKED ROTOR19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR27.5 EARTHING IMPEDANCE TEST19.11.4.8 RELIABILITY OF PROGRAMMABLE COMPONENTS22.18 INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST19.11.4.1 ELECTROSTATIC DISCHARGE19.11.4.3 ELECTRICAL FAST TRANSIENT 19.11.4.4 SURGE IMMUNITY TEST19.11.4.6 VOLTAGE DIPS, VOLTAGE INTERRUPTIONS AND VOLTAGE VARIATIONS IN THE POWER SUPPLY NETWORK
2020-12-09

HOUS

10 POWER INPUT AND CURRENT11 HEATING13.2 LEAKAGE CURRENT AT OPERATING TEMPERATURE13.3 ELECTRIC STRENGTH AT OPERATING TEMPERATURE15.3 MOISTURE RESISTANCE - HUMIDITY16.2 LEAKAGE CURRENT AFTER HUMIDITY TREATMENT16.3 ELECTRIC STRENGTH AFTER HUMIDITY TREATMENT19.7 ABNORMAL OPERATION - LOCKED ROTOR19.8 ABNORMAL OPERATION – DISCONNECTED PHASE19.9 ABNORMAL OPERATION - RUNNING OVERLOAD19.11.2 ABNORMAL OPERATION - ELECTRONIC CIRCUITS - FAULT CONDITIONS19.11.3 ABNORMAL OPERATION - PROTECTIVE ELECTRONIC CIRCUIT19.14 ABNORMAL OPERATION - CONTACTOR OR RELAY SHORT CIRCUIT23.5 INTERNAL WIRING - ELECTRIC STRENGTH TEST24.5 COMPONENT - VOLTAGE ACROSS CAPACITOR27.5 EARTHING IMPEDANCE TEST19.11.4.8 RELIABILITY OF PROGRAMMABLE COMPONENTS22.18 INSPECTION FOR CORROSION (FOLLOWING ABNORMAL OPERATION) TEST19.11.4.1 ELECTROSTATIC DISCHARGE19.11.4.3 ELECTRICAL FAST TRANSIENT 19.11.4.4 SURGE IMMUNITY TEST19.11.4.6 VOLTAGE DIPS, VOLTAGE INTERRUPTIONS AND VOLTAGE VARIATIONS IN THE POWER SUPPLY NETWORK
2020-12-09