Rechi Precision Co Ltd
Rechi Precision Co Ltd
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2019-08-15 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
HOUS | IEC 60335-1:2020 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2024-07-16 | |
HOUS | IEC 60335-1:2010 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-1:2001 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 | |
HOUS | IEC 60335-1:2001/AMD1:2004 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 | |
HOUS | IEC 60335-1:2001/AMD2:2006 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 | |
HOUS | IEC 60335-2-34:2021 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2024-07-16 | |
HOUS | IEC 60335-2-34:2012 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-2-34:2012/AMD1:2015 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-2-34:2012/AMD2:2016 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2022-08-25 | |
HOUS | IEC 60335-2-34:2002 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 | |
HOUS | IEC 60335-2-34:2002/AMD1:2004 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 | |
HOUS | IEC 60335-2-34:2002/AMD2:2008 | Accepted clauses:8 Protection Against Access To Live Parts13.3 Leakage Current And Electric Strength At Operating Temperature15.3 Moisture resistance (Humidity Test)16 Leakage Current And Electric Strength19 Abnormal Operation(also include 19.11.1, 19.11.2, 19.11.3, 19.12, 19.13)19.101 Abnormal Operation – Locked Rotor Temperature Test19.102 Abnormal Operation - Locked-Rotor Temperature Test With Open And Shorted Capacitors19.103 Abnormal Operation - Locked-Rotor Temperature Test With Loss Of Phase (3 Phase Only)9.104 During the tests of 19.101, 19.102 and 19.103.21 Mechanical Strength22 Construction22.7 Motor Compressor Enclosure Strength Test29 Clearances, Creepage Distances And Solid InsulationAnnex AA - Running Overload Tests For Motor-Compressors Classified As Tested With Annex AA | 2019-08-15 |