Raritan International B.V. Taiwan Branch

Address(es)
  • 5th Floor
    121 Lane 235 Baoqiao Road
    Xindian District
    TW-231 New Taipei
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2014-09-22

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.3.2.2 - ACCESSIBILITY TO ELECTRICAL ENERGY SOURCES AND SAFEGUARDS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9.1 – ELECTRIC STRENGTH TEST5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.7 – WALL OR CEILING MOUNTING TESTS8.9 – WHEEL OR CASTER SECUREMENTB.2.5 – INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADANNEX G.7.3.2 – STRAIN RELIEF TESTQ.1 – LIMITED POWER SOURCE
2020-10-15

ITAV

5.2, 5.7 / CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 / ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.4, Annex B.2 / MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 / DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 / BALL PRESSURE TEST5.4.4.6.2 / SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9 / ELECTRIC STRENGTH TEST5.5.2.2 / SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) / RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 / PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 / PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 / POWER MEASUREMENTS6.3 / NORMAL OPERATING CONDITIONS TEMPERATURE TEST8.7 – WALL OR CEILING MOUNTING TESTS8.9 – WHEEL OR CASTER SECUREMENTB.2.5 / INPUT TEST: SINGLE PHASEB.2.5 – INPUT TEST: POLYPHASEANNEX B.2.6 / NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 / SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 / SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 / TRANSFORMER OVERLOADANNEX G.7.3.2 / STRAIN RELIEF TESTANNEX Q.1 / LIMITED POWER SOURCEANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) / STEADY FORCE TEST, 10 NANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) / STEADY FORCE TEST, 30 NANNEX T.4 (4.4.4.2) / STEADY FORCE TEST, 100 NANNEX T.5 (4.4.4.2) / STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4, 8.10.4) / ENCLOSURE IMPACT TESTANNEX T.7 (4.4.4.3) / DROP TESTANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) / STRESS RELIEF TEST
2020-10-15

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-08-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-08-02

OFF

1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST 1.5.7.2, 1.5.7.3 RESISTOR TEST - BRIDGING DOUBLE/REINFORCED INSULATION BETWEEN AC MAINS AND OTHER CIRCUITS, ANTENNA OR COAXIAL CABLE. 1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE /INSULATION ELECTRIC STRENGTH 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLEPHASE; TN/TT SYSTEM)5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1, 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST
2019-08-02