Phoenix Contact Power Supplies GMBH

Address(es)
  • Oberes Feld 1
    Paderborn
    D‐33106
    Germany

Website Not available
Status

MEMBER

Acceptance date 2016-06-15

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MEAS

4.4SINGLE FAULT CONDITION TESTS4.4.1COMPONENT ABNORMAL4.4.2.3PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.7.2MAINS TRANSFORMER SHORTCIRCUIT TEST4.4.2.7.3MAINS TRANSFORMER OVERLOAD TEST4.4.2.8OUTPUT ABNORMAL5.1.3INPUT POWER/CURRENT MEASUREMENT5.3DURABILITY OF MARKINGS TEST6.2DETERMINATION OF ACCESSIBLE PARTS6.2.1DETERMINATION OF ACCESSIBLE PARTS6.3LIMIT VALUES FOR ACCESSIBLE PARTS6.5.2.4 and 6.5.2.5GROUNDING CONTINUITY TEST6.5.2.4DVLIMITED SHORT-CIRCUIT TEST6.7,ANNEX KINSULATION REQUIREMENTS6.8DIELECTRIC STRENGTH6.8.2HUMIDITY CONDITIONING TEST7.2SHARP EDGES7.6WALL MOUNTING TEST8.2.1RIGIDITY TEST8.2.2IMPACT TEST9.4LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1 - 10.4NORMAL TEMPERATURE TEST10.5RESISTANCE TO HEAT
2019-12-04

MEAS

4.4SINGLE FAULT CONDITION TESTS4.4.1COMPONENT ABNORMAL4.4.2.3PROTECTIVE CONDUCTOR ABNORMAL TEST4.4.2.7.2MAINS TRANSFORMER SHORTCIRCUIT TEST4.4.2.7.3MAINS TRANSFORMER OVERLOAD TEST4.4.2.8OUTPUT ABNORMAL5.1.3INPUT POWER/CURRENT MEASUREMENT5.3DURABILITY OF MARKINGS TEST6.2DETERMINATION OF ACCESSIBLE PARTS6.2.1DETERMINATION OF ACCESSIBLE PARTS6.3LIMIT VALUES FOR ACCESSIBLE PARTS6.5.2.4 and 6.5.2.5GROUNDING CONTINUITY TEST6.5.2.4DVLIMITED SHORT-CIRCUIT TEST6.7,ANNEX KINSULATION REQUIREMENTS6.8DIELECTRIC STRENGTH6.8.2HUMIDITY CONDITIONING TEST7.2SHARP EDGES7.6WALL MOUNTING TEST8.2.1RIGIDITY TEST8.2.2IMPACT TEST9.4LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1 - 10.4NORMAL TEMPERATURE TEST10.5RESISTANCE TO HEAT
2019-12-04

MEAS

4.4.1.101.1OVERLOAD TEST4.4.1.101.2SWITCHING DEVICES - ENDURANCE TEST6.2.101ACCESSIBILITY OF INTERFACES, PORTS AND TERMINALS6.2.102CONTROL EQUIPMENT6.5.2.102PROTECTIVE EARTHING REQUIREMENTS FOR ENCLOSED EQUIPMENT6.5.2.103PROTECTIVE EARTHING REQUIREMENTS FOR OPEN EQUIPMENT8.2.2IMPACT TEST
2019-12-04