Performance Controls Inc.

Address(es)
  • 151 Domorah Drive Montgomeryville
    PA 18936
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2018-08-20

Further information

Stage

Country

Name

1

United States of America

1

United States of America

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MEAS

Cl 4.4 - Single Fault Condition TestsCl. 4.4.1 - Component AbnormalCl. 4.4.2.2 - Protective Impedance Abnormal TestCl. 4.4.2.3 - Protective Conductor Abnormal TestCl. 4.4.2.4 - Short Term / Intermittent Operation Abnormal TestCl. 4.4.2.5 - Motor Abnormal TestCl. 4.4.2.6 - Motor Capacitor Short Circuit Abnormal TestCl. 4.4.2.7.2 - Mains Transformer Short Circuit TestCl. 4.4.2.7.3 - Mains Transformer Overload TestCl. 4.4.2.8 - Output Abnormal TestCl. 4.4.2.9 – Multi-Supply Abnormal TestCl. 4.4.2.10 – Cooling Abnormal TestCl. 5.1.3 – Mains SupplyCl. 5.3 – Durability of Markings TestCl. 6.2 - Determination Of Accessible PartsCl. 6.3 - Limit Values For Accessible PartsCl. 6.5.2.3J - Tightening Torque Test Cl. 6.5.2.4 and 6.5.2.5 - Grounding Continuity TestCl. 6.7, ANNEX K - Insulation RequirementsDETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST (60950)Cl. 6.8 - Dielectric Voltage Withstand TestCl. 6.8.2 - Humidity Conditioning TestCl. 8.2.1 - Rigidity TestCl. 8.2.2 - Impact TestCl. 10.1-10.4 - Temperature Test
2023-12-01

MEAS

Cl 4.4 - Single Fault Condition TestsCl. 4.4.1 - Component AbnormalCl. 4.4.2.2 - Protective Impedance Abnormal TestCl. 4.4.2.3 - Protective Conductor Abnormal TestCl. 4.4.2.4 - Short Term / Intermittent Operation Abnormal TestCl. 4.4.2.5 - Motor Abnormal TestCl. 4.4.2.6 - Motor Capacitor Short Circuit Abnormal TestCl. 4.4.2.7.2 - Mains Transformer Short Circuit TestCl. 4.4.2.7.3 - Mains Transformer Overload TestCl. 4.4.2.8 - Output Abnormal TestCl. 4.4.2.9 – Multi-Supply Abnormal TestCl. 4.4.2.10 – Cooling Abnormal TestCl. 5.1.3 – Mains SupplyCl. 5.3 – Durability of Markings TestCl. 6.2 - Determination Of Accessible PartsCl. 6.3 - Limit Values For Accessible PartsCl. 6.5.2.3J - Tightening Torque Test Cl. 6.5.2.4 and 6.5.2.5 - Grounding Continuity TestCl. 6.7, ANNEX K - Insulation RequirementsDETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST (60950)Cl. 6.8 - Dielectric Voltage Withstand TestCl. 6.8.2 - Humidity Conditioning TestCl. 8.2.1 - Rigidity TestCl. 8.2.2 - Impact TestCl. 10.1-10.4 - Temperature Test
2023-12-01

MED

Cl. 4.11 - Power InputCl. 5.7 – Humidity PreconditioningCl. 5.9.2 – Accessible PartsCl. 7.1.2 – Legilbility of MarkingsCl. 7.1.3 – Durability of MarkingsCl. 8.1b – Shorting of One MOPCl. 8.5.4 - Working VoltageCl. 8.6.4a - Impedance and Current Carrying CapabilityCl. 8.7 - Leakage CurrentCl. 8.7.4.5 – Earth Leakage TestsCl. 8.7.4.6 – Touch (Leakage Current) TestsCl. 8.7.3 e) – Non-Frequency-Weighted Leakage CurrentCl. 8.8.3 - Dielectric StrengthCl.11 - TemperatureCl. 11.8 - Interruption of PowerCl. 13.2 - Abnormal Operation TestingCl. 13.2.8 – Locking of Moving PartsCl. 13.2.9 – Impairment of CoolingCl. 13.2.13 - OverloadCl. 15.3.2 –Enclosure ForceCl. 15.3.3 – Enclosure ImpactCl. 15.5.1.2 - Transformer Short CircuitCl. 15.5.1.3 - Transformer Overload
2018-08-20

MED

Cl. 4.11 - Power InputCl. 5.7 – Humidity PreconditioningCl. 5.9.2 – Accessible PartsCl. 7.1.2 – Legilbility of MarkingsCl. 7.1.3 – Durability of MarkingsCl. 8.1b – Shorting of One MOPCl. 8.5.4 - Working VoltageCl. 8.6.4a - Impedance and Current Carrying CapabilityCl. 8.7 - Leakage CurrentCl. 8.7.4.5 – Earth Leakage TestsCl. 8.7.4.6 – Touch (Leakage Current) TestsCl. 8.7.3 e) – Non-Frequency-Weighted Leakage CurrentCl. 8.8.3 - Dielectric StrengthCl.11 - TemperatureCl. 11.8 - Interruption of PowerCl. 13.2 - Abnormal Operation TestingCl. 13.2.8 – Locking of Moving PartsCl. 13.2.9 – Impairment of CoolingCl. 13.2.13 - OverloadCl. 15.3.2 –Enclosure ForceCl. 15.3.3 – Enclosure ImpactCl. 15.5.1.2 - Transformer Short CircuitCl. 15.5.1.3 - Transformer Overload
2018-08-20

MED

Cl. 4.11 - Power InputCl. 5.7 – Humidity PreconditioningCl. 5.9.2 – Accessible PartsCl. 7.1.2 – Legilbility of MarkingsCl. 7.1.3 – Durability of MarkingsCl. 8.1b – Shorting of One MOPCl. 8.5.4 - Working VoltageCl. 8.6.4a - Impedance and Current Carrying CapabilityCl. 8.7 - Leakage CurrentCl. 8.7.4.5 – Earth Leakage TestsCl. 8.7.4.6 – Touch (Leakage Current) TestsCl. 8.7.3 e) – Non-Frequency-Weighted Leakage CurrentCl. 8.8.3 - Dielectric StrengthCl.11 - TemperatureCl. 11.8 - Interruption of PowerCl. 13.2 - Abnormal Operation TestingCl. 13.2.8 – Locking of Moving PartsCl. 13.2.9 – Impairment of CoolingCl. 13.2.13 - OverloadCl. 15.3.2 –Enclosure ForceCl. 15.3.3 – Enclosure ImpactCl. 15.5.1.2 - Transformer Short CircuitCl. 15.5.1.3 - Transformer Overload
2023-12-01

MED

Cl. 10.5.1 - Integrity of Creepage and Clearances TestCl. 7 - Power InputCl. 15 - Voltage and/or Energy LimitationCl. 18 - Protective EarthingCl. 19 - Leakage CurrentCl. 20 - Dielectric StrengthCl. 21 - Mechanical StrengthCl. 24 - Stability StrengthCl. 28 - Suspended MassesCl. 42 - TemperatureCl. 44 - Humidity PreconditioningCl. 52 - Abnormal Operation and Fault ConditionsCl. 57.9.1 - Transformer Overload and Short-Circuit TestCl. 57.9. 2 - Transformer Dielectric Strength Test
2018-08-20

MED

Cl. 10.5.1 - Integrity of Creepage and Clearances TestCl. 7 - Power InputCl. 15 - Voltage and/or Energy LimitationCl. 18 - Protective EarthingCl. 19 - Leakage CurrentCl. 20 - Dielectric StrengthCl. 21 - Mechanical StrengthCl. 24 - Stability StrengthCl. 28 - Suspended MassesCl. 42 - TemperatureCl. 44 - Humidity PreconditioningCl. 52 - Abnormal Operation and Fault ConditionsCl. 57.9.1 - Transformer Overload and Short-Circuit TestCl. 57.9. 2 - Transformer Dielectric Strength Test
2018-08-20

MED

Cl. 10.5.1 - Integrity of Creepage and Clearances TestCl. 7 - Power InputCl. 15 - Voltage and/or Energy LimitationCl. 18 - Protective EarthingCl. 19 - Leakage CurrentCl. 20 - Dielectric StrengthCl. 21 - Mechanical StrengthCl. 24 - Stability StrengthCl. 28 - Suspended MassesCl. 42 - TemperatureCl. 44 - Humidity PreconditioningCl. 52 - Abnormal Operation and Fault ConditionsCl. 57.9.1 - Transformer Overload and Short-Circuit TestCl. 57.9. 2 - Transformer Dielectric Strength Test
2023-12-01