Panasonic Energy México SA de CV

Address(es)
  • AV SANTA BARBARA 601 COL EX-EJIDO SAN NICOLAS ESCOBEDO
    NL 66050
    Mexico

Website Not available
Status

MEMBER

Acceptance date 2013-09-18

Further information

Stage

Country

Name

3

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

BATT

8.2.2 LITHIUM SYSTEMS - MOULDED CASE STRESS AT HIGH AMBIENT TEMPERATURE (BATTERY)8.3.2 LITHIUM SYSTEMS - EXTERNAL SHORT CIRCUIT (BATTERY)8.3.3 LITHIUM SYSTEMS - FREE FALL8.3.6 LITHIUM SYSTEMS - OVER-CHARGING OF BATTERY
2019-03-12

BATT

2.1 INSULATION RESISTANCE4.102 FUNCTION OF THE OVERCHARGE PROTECTION OF BATTERIES - JAPAN NATIONAL DIFFERENCES4.103 FREE FALL OF APPLIANCE - JAPAN NATIONAL DIFFERENCES4.2.2 VIBRATION4.2.2 VIBRATION - JAPAN NATIONAL DIFFERENCES4.2.3 MOULDED CASE ENCLOSURE4.2.4 TEMPERATURE CYCLING4.3.2 EXTERNAL SHORT CIRCUIT - JAPAN NATIONAL DIFFERENCES4.3.2 EXTERNAL SHORT CIRCUIT4.3.3 FREE FALL4.3.4 MECHANICAL SHOCK - JAPAN NATIONAL DIFFERENCES4.3.4 MECHANICAL SHOCK
2019-03-12

BATT

7.2.2 CASE STRESS AT HIGH AMBIENT TEMPERATURE (BATTERY)7.3.2 EXTERNAL SHORT-CIRCUIT (BATTERY)7.3.3` FREE FALL7.3.8.1 VIBRATION7.3.8.2 MECHANICAL SHOCK7.3.6 OVER-CHARGING OF BATTERY
2019-03-12

BATT

7.2.2 CASE STRESS AT HIGH AMBIENT TEMPERATURE (BATTERY)7.3.2 EXTERNAL SHORT-CIRCUIT (BATTERY)7.3.3` FREE FALL7.3.8.1 VIBRATION7.3.8.2 MECHANICAL SHOCK7.3.6 OVER-CHARGING OF BATTERY
2023-05-09

ITAV

B.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS4.4.3.2, T.5 STEADY FORCE TEST 250N4.4.3.8, T.8 STRESS RELIEF TESTQ.1 LIMITED POWER SOURCE4.4.3.3, T.7 DROP TEST
2024-05-08

ITAV

5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMSANNEX T.5 STEADY FORCE TEST 250NANNEX T.8 STRESS RELIEF TESTQ.1 LIMITED POWER SOURCE
2019-03-12