Oracle America, Inc.

Address(es)
  • 4090 Network Circle
    Santa Clara CA 95054
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2016-08-24

Further information

Stage

Country

Name

2

United States of America

2

United States of America

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.2, 5.7. CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2. MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.9.1 ELECTRIC STRENGTH TEST5.5.2.2. SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2. RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7. PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.7. SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3. POWER MEASUREMENTS6.3. NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.6. TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5. ACCESSIBILITY TO MOVING PARTS8.6.2. STATIC STABILITY8.1. RELOCATION STABILITY TEST8.11.3. RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4. RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSANNEX B.2.5. INPUT TEST: SINGLE PHASEANNEX B.2.6. NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3. SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4. SIMULATED SINGLE FAULT CONDITIONSANNEX B.4. SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10. TEST FOR THE PERMANENCE OF MARKINGS6.2.3.1, 6.2.3.2. ARCING PIS/RESISTIVE PIS DETERMINATIONANNEX G.5.4.6.3. ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX T.2, T.3, T.4. STEADY FORCE TESTS, 10N, 30N, 250NANNEX Q.1. LIMITED POWER SOURCE
2021-09-29

ITAV

5.2, 5.7. CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, Annex B.2. MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.9. ELECTRIC STRENGTH TEST5.5.2.2. SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2. RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7. PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5. PROTECTIVE CONDUCTOR CURRENT5.7.7. SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS6.2.2.2, 6.2.2.3. POWER MEASUREMENTS6.3. NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.6. TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION8.5. ACCESSIBILITY TO MOVING PARTS8.6.2. STATIC STABILITY8.1. RELOCATION STABILITY TEST8.11.3. RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4. RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPSANNEX B.2.5. INPUT TEST: SINGLE PHASEANNEX B.2.6. NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3. SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4. SIMULATED SINGLE FAULT CONDITIONSANNEX B.4. SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10. TEST FOR THE PERMANENCE OF MARKINGS6.2.3.1, 6.2.3.2. ARCING PIS/RESISTIVE PIS DETERMINATIONANNEX G.5.4.6.3. ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX T.2, T.3, T.4. STEADY FORCE TESTS, 10N, 30N, 250NANNEX Q.1. LIMITED POWER SOURCE
2019-09-10

OFF

2.1.1.7. Capacitor Discharge2.5. LPS Measurements2.6.3.4, 2.6.1. Protective Bonding Test I (Earthing); Protective Bonding Test II4.5.1, 1.4.12, 1.4.13. Heating Test5.1, Annex D. Touch Current Test (Single-Phase and three-phase; TN/TT System)5.3.7. Overload of Operator Accessible Connector Test1.6.2. Input1.7.13. Durability of Marking4.1. Stability4.2.11.1. Mechanical Strength4.2.3, 4.2.4. Enclosure Push4.3.2. Loading4.3.5. Connector current interruption5.2.2. Electric Strength5.3.1,5.3.4, 5.3.7. Component Failure5.3.1 - 5.3.9. Abnormal OperationAnnex DD. Rack Mounted Equipment – Mechanical Strength
2019-09-10

OFF

2.1.1.7. Capacitor Discharge2.5. LPS Measurements2.6.3.4, 2.6.1. Protective Bonding Test I (Earthing); Protective Bonding Test II4.5.1, 1.4.12, 1.4.13. Heating Test5.1, Annex D. Touch Current Test (Single-Phase and three-phase; TN/TT System)5.3.7. Overload of Operator Accessible Connector Test1.6.2. Input1.7.13. Durability of Marking4.1. Stability4.2.11.1. Mechanical Strength4.2.3, 4.2.4. Enclosure Push4.3.2. Loading4.3.5. Connector current interruption5.2.2. Electric Strength5.3.1,5.3.4, 5.3.7. Component Failure5.3.1 - 5.3.9. Abnormal OperationAnnex DD. Rack Mounted Equipment – Mechanical Strength
2019-09-10

OFF

2.1.1.7. Capacitor Discharge2.5. LPS Measurements2.6.3.4, 2.6.1. Protective Bonding Test I (Earthing); Protective Bonding Test II4.5.1, 1.4.12, 1.4.13. Heating Test5.1, Annex D. Touch Current Test (Single-Phase and three-phase; TN/TT System)5.3.7. Overload of Operator Accessible Connector Test1.6.2. Input1.7.13. Durability of Marking4.1. Stability4.2.11.1. Mechanical Strength4.2.3, 4.2.4. Enclosure Push4.3.2. Loading4.3.5. Connector current interruption5.2.2. Electric Strength5.3.1,5.3.4, 5.3.7. Component Failure5.3.1 - 5.3.9. Abnormal OperationAnnex DD. Rack Mounted Equipment – Mechanical Strength
2019-09-10