OMRON SHANGHAI CO LTD

Address(es)
  • 789 JINJI RD
    CHINA (SHANGHAI) PILOT FREE TRADE ZONE
    PUDONG SHANGHAI 201206
    SHANGHAI 201206
    China

Website Not available
Status

MEMBER

Acceptance date 2015-04-20

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Accepted clauses:4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N 4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST 5.4.1.3 –TEST FOR HYGROSCOPIC MATERIALS 5.4.1.8 – DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 – BALL PRESSURE TEST 5.4.9 – ELECTRIC STRENGTH TEST 5.4.10, 5.4.10.2.2 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST 5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 8.6.2 – STATIC STABILITY 8.6.3 – RELOCATION STABILITY TEST 8.6.5 – HORIZONTAL FORCE TEST 8.7 – WALL OR CEILING MOUNTING TESTS 8.8—HANDLE STRENGTH B.2.5 – INPUT TEST:SINGLE PHASE B.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.10.3 – RESISTOR TEST ANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIES ANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4, ANNEX T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX Q.1 – LIMITED POWER SOURCE
2021-11-18

ITAV

Accepted clauses:4.4.4.2, ANNEX T.5 – STEADY FORCE TEST, 250 N 4.4.4.4, ANNEX T.6 – IMPACT TEST 4.4.4.7, ANNEX T.8 – STRESS RELIEF TEST 5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.8 – DETERMINATION OF WORKING VOLTAGE 5.4.8 – HUMIDITY CONDITIONING 5.4.9 – ELECTRIC STRENGTH TEST 5.4.10, 5.4.10.2.2 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 – SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST 5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 8.6.2 – STATIC STABILITY 8.6.3 – RELOCATION STABILITY TEST 8.6.3.2 – HORIZONTAL FORCE TEST 8.7 – WALL OR CEILING MOUNTING TESTS 8.8—HANDLE STRENGTH B.2.5 – INPUT TEST:SINGLE PHASE B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.10.2 – RESISTOR TEST ANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIES ANNEX M.4.2 – SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4, ANNEX T.7 – DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX Q.1 – LIMITED POWER SOURCE
2019-08-02

MEAS

4.4.1 Component abnormal test4.4.2.3 Protective conductor abnormal test4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD TEST4.4.2.8 OUTPUTS SHORT CIRCUIT4.4.2.10 COOLING ABNORMAL5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 Durability of markings6.2 DETERMINATION OF ACCESSIBLE PARTS6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.46.5.2.5 GROUNDING CONTINUITY TEST6.10.3 CAPACITOR DISCHARGE TEST6.7ANNEX K INSULATION REQUIREMENTS6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.6 Wall mounting8.2.1 ENCLOSURE RIGIDITY TEST‐ STATIC8.2.2 ENCLOSURE RIGIDITY TEST‐ IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGES TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES10.5.3 BALL PRESSURE TEST
2019-11-13

MEAS

4.4.1 Component abnormal test4.4.2.3 Protective conductor abnormal test4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD TEST4.4.2.8 OUTPUTS SHORT CIRCUIT4.4.2.10 COOLING ABNORMAL5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 Durability of markings6.2 DETERMINATION OF ACCESSIBLE PARTS6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.46.5.2.5 GROUNDING CONTINUITY TEST6.10.3 CAPACITOR DISCHARGE TEST6.7ANNEX K INSULATION REQUIREMENTS6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.6 Wall mounting8.2.1 ENCLOSURE RIGIDITY TEST‐ STATIC8.2.2 ENCLOSURE RIGIDITY TEST‐ IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGES TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES10.5.3 BALL PRESSURE TEST
2019-11-13

MEAS

6.6.102 SPECIALIZED MEASURING CIRCUITS TERMINALS
2020-10-28

MEAS

4.4.1 Component abnormal test4.4.2.3 Protective conductor abnormal test4.4.2.7.2 MAINS TRANSFORMER SHORT CIRCUIT TEST4.4.2.7.3 MAINS TRANSFORMER OVERLOAD TEST4.4.2.8 OUTPUTS SHORT CIRCUIT4.4.2.10 COOLING ABNORMAL5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 Durability of markings6.2 DETERMINATION OF ACCESSIBLE PARTS6.3 LIMIT VALUES FOR ACCESSIBLE PARTS TEST6.5.2.46.5.2.5 GROUNDING CONTINUITY TEST6.10.3 CAPACITOR DISCHARGE TEST6.7ANNEX K INSULATION REQUIREMENTS6.8 PROCEDURE FOR VOLTAGE TESTS6.8.2 HUMIDITY PRECONDITIONING TEST7.6 Wall mounting8.2.1 ENCLOSURE RIGIDITY TEST‐ STATIC8.2.2 ENCLOSURE RIGIDITY TEST‐ IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGES TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES10.5.3 BALL PRESSURE TEST4.4.2.101.1 Overload test4.4.2.101.2 Endurance test
2019-11-13

OFF

Accepted clauses:1.2.2.1 - Maximum Output Voltage, Current, and Volt‐ AmpereMeasurement 1.6.2 ‐ INPUT TEST: SINGLE‐PHASE. 1.7.11 ‐ DURABILITY OF MARKING TEST. 2.1.1.1, 2.8.2, PART 21 4.2 ‐ ACCESS TO ENERGIZED PARTS TEST 2.1.1.5, 2.1.2, 1.2.8.10 ‐ ENERGY HAZARD MEASUREMENTS 2.1.1.7 ‐ CAPACITANCE DISCHARGE TEST 2.5 ‐ LIMITED POWER SOURCE MEASUREMENTS. 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 ‐ HUMIDITY TEST 2.10.2 ‐ DETERMINATION OF WORKING VOLTAGE ‐ WORKING VOLTAGE MEASUREMENT TEST 2.10.5.9,2.10.5.10, 2.10.5.6 ‐ Thin Sheet Material Test 4.1 ‐ STABILITY TESTS. 4.2.1 ‐ 4.2.4 – STEADY FORCE TESTS. 4.2.5, 4.2.1, PART 22 10.2 ‐ IMPACT TEST. 4.2.6, 4.2.1 ‐ DROP TEST 4.2.7, 4.2.1 – STRESS RELIEF TEST. 4.2.10 ‐ LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.8 ‐ BATTERY TESTS 4.3.8 ‐ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 ‐ HEATING TEST. 5.1, ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM) 5.2.2 ‐ ELECTRIC STRENGTH TEST 5.3.1 ‐ 5.3.9 ‐ ABNORMAL OPERATION TESTS. 5.4.1.10.3‐ BALL PRESSURE TEST. 6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE ‐ IMPULSE TEST 6.2.2 (6.2.2.2) – ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST
2019-08-02

OFF

Accepted clauses:1.2.2.1 - Maximum Output Voltage, Current, and Volt‐ AmpereMeasurement 1.6.2 ‐ INPUT TEST: SINGLE‐PHASE. 1.7.11 ‐ DURABILITY OF MARKING TEST. 2.1.1.1, 2.8.2, PART 21 4.2 ‐ ACCESS TO ENERGIZED PARTS TEST 2.1.1.5, 2.1.2, 1.2.8.10 ‐ ENERGY HAZARD MEASUREMENTS 2.1.1.7 ‐ CAPACITANCE DISCHARGE TEST 2.5 ‐ LIMITED POWER SOURCE MEASUREMENTS. 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 ‐ HUMIDITY TEST 2.10.2 ‐ DETERMINATION OF WORKING VOLTAGE ‐ WORKING VOLTAGE MEASUREMENT TEST 2.10.5.9,2.10.5.10, 2.10.5.6 ‐ Thin Sheet Material Test 4.1 ‐ STABILITY TESTS. 4.2.1 ‐ 4.2.4 – STEADY FORCE TESTS. 4.2.5, 4.2.1, PART 22 10.2 ‐ IMPACT TEST. 4.2.6, 4.2.1 ‐ DROP TEST 4.2.7, 4.2.1 – STRESS RELIEF TEST. 4.2.10 ‐ LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.8 ‐ BATTERY TESTS 4.3.8 ‐ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 ‐ HEATING TEST. 5.1, ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM) 5.2.2 ‐ ELECTRIC STRENGTH TEST 5.3.1 ‐ 5.3.9 ‐ ABNORMAL OPERATION TESTS. 5.4.1.10.3‐ BALL PRESSURE TEST. 6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE ‐ IMPULSE TEST 6.2.2 (6.2.2.2) – ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST
2019-08-02

OFF

Accepted clauses:1.2.2.1 - Maximum Output Voltage, Current, and Volt‐ AmpereMeasurement 1.6.2 ‐ INPUT TEST: SINGLE‐PHASE. 1.7.11 ‐ DURABILITY OF MARKING TEST. 2.1.1.1, 2.8.2, PART 21 4.2 ‐ ACCESS TO ENERGIZED PARTS TEST 2.1.1.5, 2.1.2, 1.2.8.10 ‐ ENERGY HAZARD MEASUREMENTS 2.1.1.7 ‐ CAPACITANCE DISCHARGE TEST 2.5 ‐ LIMITED POWER SOURCE MEASUREMENTS. 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 ‐ PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 ‐ HUMIDITY TEST 2.10.2 ‐ DETERMINATION OF WORKING VOLTAGE ‐ WORKING VOLTAGE MEASUREMENT TEST 2.10.5.9,2.10.5.10, 2.10.5.6 ‐ Thin Sheet Material Test 4.1 ‐ STABILITY TESTS. 4.2.1 ‐ 4.2.4 – STEADY FORCE TESTS. 4.2.5, 4.2.1, PART 22 10.2 ‐ IMPACT TEST. 4.2.6, 4.2.1 ‐ DROP TEST 4.2.7, 4.2.1 – STRESS RELIEF TEST. 4.2.10 ‐ LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT. 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.8 ‐ BATTERY TESTS 4.3.8 ‐ LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 ‐ HEATING TEST. 5.1, ANNEX D ‐ TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM) 5.2.2 ‐ ELECTRIC STRENGTH TEST 5.3.1 ‐ 5.3.9 ‐ ABNORMAL OPERATION TESTS. 5.4.1.10.3‐ BALL PRESSURE TEST. 6.2.2 (6.2.2.1) – ELECTRIC STRENGTH TEST PROCEDURE ‐ IMPULSE TEST 6.2.2 (6.2.2.2) – ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST
2019-08-02