Odink en Koenderink Nederland B.V. (DEKRA-601)

Address(es)
  • Kabelstraat 13
    7483 PR Haaksbergen
    NL-7483 PR Haaksbergen
    Netherlands

Website Not available
Status

MEMBER

Acceptance date 2024-02-26

Further information

Stage

Country

Name

2

Netherlands

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

POW

Accepted clauses:Clause 10.2.5 Lifting testClause10.2.6 Mechanical Impact partly (pendulumhammer)Clause 10.2.7 MarkingsClause 10.2.8 Mechanical operationsClause 10.3 Degree of protection upto IP46Clause 10.4 clearances and creepage distancesClause 10.5.2 Pe metingClause 10.6-10.8Clause 10.9 Dielectric testsClause 10.10 temperature-rise tests
2024-02-26

POW

Accepted clauses:Clause 10.2.5 Lifting testClause10.2.6 Mechanical Impact partly (pendulumhammer)Clause 10.2.7 MarkingsClause 10.2.8 Mechanical operationsClause 10.3 Degree of protection upto IP46Clause 10.4 clearances and creepage distancesClause 10.5.2 Pe metingClause 10.6-10.8Clause 10.9 Dielectric testsClause 10.10 temperature-rise tests
2024-02-26

POW

Accepted clauses:Clause 10.2.5 Lifting testClause10.2.6 Mechanical Impact partly (pendulumhammer)Clause 10.2.7 MarkingsClause 10.2.8 Mechanical operationsClause 10.3 Degree of protection upto IP46Clause 10.4 clearances and creepage distancesClause 10.5.2 Pe metingClause 10.6-10.8Clause 10.9 Dielectric testsClause 10.10 temperature-rise tests
2024-02-26

POW

Accepted clauses:Same as above and including:Clause 10.2.101 Mechanical strength
2024-02-26

POW

Accepted clauses:Clause 10.2.5 Lifting testClause10.2.6 Mechanical Impact partly (pendulumhammer)Clause 10.2.7 MarkingsClause 10.2.8 Mechanical operationsClause 10.3 Degree of protection upto IP46Clause 10.4 clearances and creepage distancesClause 10.5.2 Pe metingClause 10.6-10.8Clause 10.9 Dielectric testsClause 10.10 temperature-rise tests
2024-02-26