NINGHAI YINGJIAO ELECTRICAL CO LTD

Address(es)
  • CUIJIA XIDIAN TOWN,
    NINGHAI 315613
    ZHEJIANG
    China

Website Not available
Status

MEMBER

Acceptance date 2024-08-20

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGUARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.2, T.4 – STEADY FORCE TEST, 100 N4.4.3.2, T.5 – STEADY FORCE TEST, 250 N4.4.3.3, T.7 – DROP TEST4.4.3.4, T.6 - IMPACT TEST4.4.3.5, T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.7 – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES)4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS4.7, DVE – EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: WEIGHT AND MOMENT DETERMINATION5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.4.6.3, 5.4.4.6.4, 5.4.4.6.5 – NON-SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS – SINGLE-PHASE EQUIPMENT ON IT SYSTEM5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.1 – ARCING PIS DETERMINATION6.2.3.2 – RESISTIVE PIS DETERMINATIONB.2.5 – INPUT TEST: SINGLE PHASEB.2.6, 5.4.1.4, 6.3, 9.3, B.1.5 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.3.3 – TRANSFORMER OVERLOADG.5.3.3.3 – TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHODG.7.3.2 – CORD STRAIN RELIEF TESTQ.1 – LIMITED POWER SOURCE
2024-08-20