National Instruments Corp.

Address(es)
  • 11500 North Mopac Expressway
    Austin 78759
    TX
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2012-04-04

Further information

Stage

Country

Name

3

United States of America

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MEAS

10.1-10.410.5.110.5.211.213.2.216.24.4.14.4.2.104.4.2.124.4.2.24.4.2.34.4.2.54.4.2.7.24.4.2.7.34.4.2.85.1.35.36.10.26.10.36.2.16.36.5.2.4 AND 6.5.2.56.86.8.27.47,67.5.28.2.18.2.28.3.18.3.29.4
2012-04-04

MEAS

10.1 - 10.410.5.110.5.211.213.2.24.4.14.4.2.104.4.2.124.4.2.24.4.2.34.4.2.54.4.2.7.24.4.2.7.34.4.2.85.1.35.36.10.2.26.10.36.26.36.5.2.4 AND 6.5.2.56.86.8.27.47.5.27.5.37,68.2.18.2.28.3.19.4
2021-05-21

MEAS

101.3.26.5.2.1016.6.102101.4101.5
2022-05-04

MEAS

101.3.26.5.2.1016.6.1026.9.10114.101
2018-01-16

OFF

1.6.2 INPUT: SINGLE-PHASE2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D IT TOUCH CURRENT (SINGLE-PHASE)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST
2012-04-04

OFF

1.6.2 INPUT: SINGLE-PHASE2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF4.1 STABILITY TESTS4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D IT TOUCH CURRENT (SINGLE-PHASE)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST
2012-04-04

OFF

1.6.2 2.1.1.1, 2.8.22.1.1.72.10.22.52.6.3.4, 2.6.12.6.3.4, 2.6.12.9.1, 2.9.2, 5.2.23.2.6, 4.2.1, 4.2.74.1 4.2.1-4.2.4 4.2.5, 4.2.14.2.6, 4.2.14.2.7, 4.2.14.3.24.5.1, 1.4.12, 1.4.135.1, ANNEX D5.2.25.3.1 - 5.3.95.3.1, 5.3.4, 5.3.7 5.3.3, 5.3.7B, ANNEX C.1
2012-04-04