MEAN WELL (Guangzhou) Electronics Co. , Ltd.
MEAN WELL (Guangzhou) Electronics Co. , Ltd.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2023-08-21 |
Further information
Stage | Country | Name |
---|---|---|
1 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.4.2, T.5 Steady Force Test, 250N 4.4.4.4, T.6 Impact Test 4.4.4.4, T.7 Drop Test 4.4.4.4, T.8 Stress Relief Test 4.4.4.5, T.3 Steady Force Test, 30N 4.4.4.5, T.4 Steady Force Test, 100N 5.2.2.2 Steady-State Voltage and Current 5.4.1.4, 6.3.2, 9, B.1.5 Temperature Tests 5.4.1.8 Determination of Working Voltage 5.4.1.10.3 Ball Pressure Test 5.4.2, 5.4.3 Clearance and Creepage Distance Measuremen 5.4.2.6, T.2 Steady Force Test, 10N 5.4.8 Humidity Conditioning 5.4.9 Electric Strength 5.5.2.2 Stored Discharge on Capacitors 5.6.6.2 Resistance of The Protective Bonding System 5.7 Prospective Touch Voltage And Touch Current Measurement 5.7.4 Unearthed Accessible Parts 5.7.5 Earthed Accessible Conductive Parts 6.2.2 Power Measurements 6.2.3.1 Arcing PIS Determination 6.2.3.2 Resistive PIS Determination ANNEX B.2.5 Input CurrentANNEX B.3, B.4 Abnormal Operating and Fault Conditions ANNEX F.3.10 Test for The Permanence of Markings ANNEX G.5.3.3 Transformer Overloaded Test ANNEX G.7.3.2 Strain Relief Test ANNEX G.8.2.2 Varistor Overload Test ANNEX Q.1 Limited Power Source NNEX Q.1 Limited Power Source ANNEX V.1 Accessible Parts of Equipment | 2023-08-21 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2,ANNEX T.3 STEADY FORCE TEST, 30N 4.4.4.2,ANNEX T.4 STEADY FORCE TEST, 100N 4.4.4.2,ANNEX T.5 STEADY FORCE TEST, 250N 4.4.4.3,ANNEX T.7 DROP TEST 4.4.4.4,ANNEX T.6 IMPACT 4.4.4.5,ANNEX T.3 STEADY FORCE TEST FOR INTERNALENCLOSURE AND BARRIER 4.4.4.7,ANNEX T.8 STRESS RELIEF TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES 5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TEST 5.4.1.10.3 BALL PRESSURE TEST 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF ACONNECTOR 5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM: 25 A OR LESS 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2,6.2.2.3 POWER MEASUREMENTS ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 NORMAL OPERATING CONDITIONSTEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATINGCONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEXF.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEXG.5.3.3 TRANSFORMER OVERLOAD TESTS ANNEX T.2 STEADY FORCE TEST, 10N ANNEX Q.1 LIMITED POWER SOURCE | 2023-08-21 |