Lexmark International, Inc.

Address(es)
  • 740 West New Circle Road
    KY 40550
    Lexington
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2016-01-01

Further information

Stage

Country

Name

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

Clause 4.4.4.2-9, Annex T 4.4.4: Safeguard robustness (4.4.4.2-9, Annex T)Clause 5.2.2.1-5.2.2.6 Classification of Electrical Energy SourcesClause 5.4.1.10.3 5.4.1.10.3: Ball PressureClause 5.4.1.4, Annex B.2 5.4.1.4: Maximum Operating Temperature for Materials, Components and SystemsClause 5.4.1.8 5.4.1.8: Determination of Working VoltageClause 5.4.8 5.4.8: Humidity ConditioningClause 5.4.9 5.4.9: Electric Strength TestClause 5.5.2.2 5.5.2.2: Capacitor Discharge After Disconnection of a ConnectorClause 5.6.6.2 5.6.6.2: Resistance of Protective Bonding SystemClause 5.7.4 5.7.4: Touch Voltage and Touch Current Measurement – Unearthed Accessible PartsClause 5.7.5 5.7.5: Touch Current Measurement - Earthed Accessible Conductive PartsClause 6.2.2.2, 6.2.2.3 6.2.2.2, 6.2.2.3: Power MeasurementClause 6.2.3.1. 6.2.3.1: Arcing PISClause 6.2.3.2 6.2.3.2: Resistive PISClause 6.3 6.3: Safeguards Against Fire Under Normal Operating Conditions and Abnormal Operating ConditionsClause 6.4.3 6.4.3: Reduction of the Likelihood of Ignition Under Single Fault ConditionsClause 6.4.3.2 6.4.3.2: Reduction of the Likelihood of Ignition – Temperatures Limited by Fuses.Clause 6.4.8.2, Annex S.1 6.4.8.2, Annex S.1 – Fire Enclosure/Fire Barrier Flammability Test: Steady State Power Does Not Exceed 4 000 WClause 6.4.8.4, Annex S.1 6.4.8.4 Annex S.2 – Fire Enclosure/Fire Barrier Integrity TestClause 8.6.2 8.6.2 – Static Stability TestClause 8.6.3 8.6.3 – Relocation Stability TestClause 8.6.3.2 8.6.3.2 – Horizontal Force TestClause 8.6.4 8.6.4 – Glass SlideClause 8.9 8.9 – Caster Securement Clause 8.10.3 8.10.3 – Cart, Stand, or Carrier Loading Clause 8.10.5 8.10.5 – Cart, Stand, or Carrier Mechanical SatbilityClause 9.5 9.5: Requirements for SafeguardsAnnex B.2.5 B.2.5: Input TestAnnex B.3.5 B.3.5: Maximum Load at Output TerminalsAnnex F.3.10 F.3.10: Test for Permanence of MarkingsAnnex G.5.3.3 G.5.3.3: Transformer Overload TestAnnex G.5.4.5 G.5.4.5: Running Overload Test for D.C. MotorsAnnex G.5.4.6 G.5.4.6: Locked Rotor Overload Test for D.C. MotorsAnnex Q.1 Q.1: Limited Power SourceAnnex T.2 T.2: Steady Force Test, 10 NAnnex T.3 T.3 : Steady Force Test, 30 NAnnex T.4 T.5 : Steady Force Test, 100 NAnnex T.5 T.5 : Steady Force Test, 250 NAnnex T.6 T.6: Enclosure Impact TestAnnex T.7 T.7: Drop TestAnnex T.8 T.8: Stress Relief Test Annex DVA Size of Protective Bonding Conductors and Terminals
2020-12-14

ITAV

Clause 4.4.4.2-9, Annex T 4.4.4: Safeguard robustness (4.4.4.2-9, Annex T)Annex T.5 T.5 : Steady Force Test, 250 NAnnex T.6 T.6: Enclosure Impact TestAnnex T.8 T.8: Stress Relief Test Clause 5.2.2.2 5.2.2.2: Touch CurrentClause 5.2.2.3 5.2.2.3 Capacitance DischargeClause 5.4.1.3 5.4.1.3: Test for Hygroscopic MaterialsClause 5.4.1.4 5.4.1.4: Maximum Operating Temperature for Insulating MaterialsClause 5.4.1.8 5.4.1.8: Determination of Working VoltageClause 5.4.1.10 5.4.1.10 Mains on Thermoplastics (Vicat or Ball Pressure)Clause 5.4.9 5.4.9: Electric Strength TestClause 5.5.2.2 5.5.2.2: Safeguards Against Capacitor DischargeClause 5.6.6.3 5.6.6.3: Size of Protective Bonding Conductors and TerminalsClause 5.6.6.2 5.6.6.2: Resistance of Protective Bonding ConductorClause 5.7.4 5.7.4: Earthed Accessible Conductive PartsClause 6.2.2.2. 6.2.2.2: Power Measurement for Worst-case Load FaultClause 6.2.2.3 6.2.2.3: Power Measurement for Worst-case Source FaultClause 6.2.3.1. 6.2.3.1: Determination of an Arcing PISClause 6.2.3.2 6.2.3.2: Determination of a Resistive PISClause 6.3, Annex B.2.5., B.2.6, 9.2.6 6.3: Normal Operating Conditions Temperature Test (B.2.5, B.2.6, 9.2.6)Clause 6.3, Annex B.3 6.3: Temperatures under Abnormal Operating Conditions (B.3)Clause 6.4.3. 6.4.3 Abnormal conditionsClause 6.4.8.2, Annex S.1 6.4.8.2, Annex S.1 – Fire Enclosure/Fire Barrier Flammability Test: Steady State Power Does Not Exceed 4 000 WClause 6.4.8.4, Annex S.1 6.4.8.4 Annex S.2 – Fire Enclosure/Fire Barrier Integrity TestClause 6.5.2 6.5.2: Test for Insulation of Internal or External WiringClause 8.6.2.2 8.6.2.2 – 250 N force Clause 8.6.2.3 8.6.2.3 – 800 N down forceClause 8.6.3.2 8.6.3.2 – Relocation Stability Test Clause 8.6.5 8.6.5 – Horizontal ForceClause 8.6.4 8.6.4 – Glass SlideClause 8.9 8.9 – Wheel or Caster Securement Clause 8.10.3 8.10.3 – Cart, Stand, or Carrier Loading Clause 8.10.5 8.10.5 – Cart, Stand, or Carrier Mechanical SatbilityClause 9.4 9.4: Test for Equipment Safeguards for Thermal BurnClause B.2.5 B.2.5: Input TestClause B.3.5 B.3.5: Maximum Load at Output TerminalsClause F.3.10 F.3.10 : Test for Permanence of MarkingsClause G.5.3.3 G.5.3.3: Transformer Overload TestClause G.5.4 G.5.4: Motors
2019-04-12

MISC

Clause 6 Engineering SpecificationClause 7 LabelingClause 8 Other Informational RequirementsClasue 9 Additional Requirements for Specific Laser ProductsClause 4 ClassificationClause 5 Determination of Accessible Emission Levels
2019-04-12

MISC

Clause 4 Engineering SpecificationClause 5 LabelingClause 6 Other Informational RequirementsClasue 7 Additional Requirements for Specific Laser ProductsClause 8 ClassificationClause 9 Determination of Accessible Emission Levels
2019-04-12

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10` ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENT2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.8, 2.8.4, 2.8.5 SAFETY INTERLOCKS, FAIL-SAFE OPERATION (CYCLING), INTERLOCKS WITH MOVING PARTS2.8.2 SAFETY INTERLOCK SHOCK AND ENERGY2.8.7.2 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - OVERLOAD2.8.7.3 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ENDURANCE2.8.7.4 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ELECTRIC STRENGTH2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 22 20.2 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE: TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.4, 5.2 ELECTRIC STRENGTH (FOR SPACINGS DEFICIENT PWBS)5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR5.3.8 UNATTENDED EQUIPMENTANNEX B.6 SECONDARY MOTOR RUNNING OVERLOAD FOR DC MOTORSANNEX B.7 LOCKED-ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITS
2019-04-12

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10` ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENT2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.8, 2.8.4, 2.8.5 SAFETY INTERLOCKS, FAIL-SAFE OPERATION (CYCLING), INTERLOCKS WITH MOVING PARTS2.8.2 SAFETY INTERLOCK SHOCK AND ENERGY2.8.7.2 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - OVERLOAD2.8.7.3 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ENDURANCE2.8.7.4 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ELECTRIC STRENGTH2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 22 20.2 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE: TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.4, 5.2 ELECTRIC STRENGTH (FOR SPACINGS DEFICIENT PWBS)5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR5.3.8 UNATTENDED EQUIPMENTANNEX B.6 SECONDARY MOTOR RUNNING OVERLOAD FOR DC MOTORSANNEX B.7 LOCKED-ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITS
2019-04-12

OFF

1.6.2 INPUT TEST: SINGLE-PHASE1.7.11 DURABILITY OF MARKING2.1.1.1/2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5/2.1.2/1.2.8.10` ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENT2.5 LIMITED POWER SOURCE MEASUREMENT2.6.3.4, 2.6.1 PROTECTIVE BONDING I2.6.3.4, 2.6.1 PROTECTIVE BONDING II2.8, 2.8.4, 2.8.5 SAFETY INTERLOCKS, FAIL-SAFE OPERATION (CYCLING), INTERLOCKS WITH MOVING PARTS2.8.2 SAFETY INTERLOCK SHOCK AND ENERGY2.8.7.2 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - OVERLOAD2.8.7.3 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ENDURANCE2.8.7.4 SWITCHES AND RELAYS IN INTERLOCK SYSTEMS - ELECTRIC STRENGTH2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST4.1 STABILITY4.2.1 - 4.2.4 STEADY FORCE4.2.5, 4.2.1, PART 22 20.2 IMPACT4.2.7, 4.2.1 STRESS RELIEF TEST4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.1 SHARP EDGE4.3.2 KNOB PULL/HANDLE LOADING TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING4.5.5, 4.5 BALL PRESSURE5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE: TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH5.3.1 - 5.3.9 ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION5.3.4, 5.2 ELECTRIC STRENGTH (FOR SPACINGS DEFICIENT PWBS)5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR5.3.8 UNATTENDED EQUIPMENTANNEX B.6 SECONDARY MOTOR RUNNING OVERLOAD FOR DC MOTORSANNEX B.7 LOCKED-ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITS
2019-04-12