Lenze SE
Lenze SE
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2021-11-29 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
INST | IEC 61800-5-1:2007 | 5.2.1 VISUAL INSPECTION5.2.2.1 NON-ACCESSIBILITY5.2.2.4 ENCLOSURE INTEGRITY, (IP RATING) => IP205.2.2.5.2 DEFLECTION TEST5.2.2.5.3 IMPACT TEST5.2.3.1 IMPULSE VOLTAGE5.2.3.5 TOUCH CURRENT MEASUREMENT5.2.6.3.1 DRY HEAT5.2.6.3.2 DAMP HEAT5.2.6.4 VIBRATION TEST5.2.3.6.3 SHORT-CIRCUIT TESTS5.2.3.6.4 BREAK DOWN OF COMPONENTS5.2.2.1 CLEARANCES AND CREEPAGE DISTANCES5.2.3.2 A.C. OR D.C. VOLTAGE5.2.3.6.3 SHORT CIRCUIT TEST - STANDARD FAULT CURRENT5.2.3.6.4 BREAKDOWN OF COMPONENTS5.2.3.7 CAPACITOR DISCHARGE TEST5.2.3.8 TEMPERATURE RISE5.2.3.9 PROTECTIVE BONDING5.2.4.4 LOSS OF PHASE5.2.4.5.2 INOPERATIVE BLOWER5.2.4.5.3 CLOGGED FILTER | 2021-10-21 | |
INST | IEC 61800-5-1:2007/AMD1:2016 | 5.2.1 VISUAL INSPECTION5.2.2.1 NON-ACCESSIBILITY5.2.2.4 ENCLOSURE INTEGRITY, (IP RATING) => IP205.2.2.5.2 DEFLECTION TEST5.2.2.5.3 IMPACT TEST5.2.3.1 IMPULSE VOLTAGE5.2.3.5 TOUCH CURRENT MEASUREMENT5.2.6.3.1 DRY HEAT5.2.6.3.2 DAMP HEAT5.2.6.4 VIBRATION TEST5.2.3.6.3 SHORT-CIRCUIT TESTS5.2.3.6.4 BREAK DOWN OF COMPONENTS5.2.2.1 CLEARANCES AND CREEPAGE DISTANCES5.2.3.2 A.C. OR D.C. VOLTAGE5.2.3.6.3 SHORT CIRCUIT TEST - STANDARD FAULT CURRENT5.2.3.6.4 BREAKDOWN OF COMPONENTS5.2.3.7 CAPACITOR DISCHARGE TEST5.2.3.8 TEMPERATURE RISE5.2.3.9 PROTECTIVE BONDING5.2.4.4 LOSS OF PHASE5.2.4.5.2 INOPERATIVE BLOWER5.2.4.5.3 CLOGGED FILTER | 2021-10-21 | |
MEAS | IEC 61010-1:2010 | 10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES13.2.2 BATTERY ABNORMAL 14.8 CIRCUITS AND COMPONENTS USED AS TRANSIENT OVERVOLTAGE LIMITING DEVICES4.4.4.16 STAND-ALONE INVERTERS - LOAD TRANSFER 5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.4.4 IMPEDANCE6.5.2.3 PROTECTIVE CONDUCTOR TERMINAL6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.5.4 PROTECTIVE IMPEDANCE6.6.2 TERMINALS FOR EXTERNAL CIRCUITS6.7.2.1 CLEARANCES AND CREEPAGE DISTANCES6.7.2.2 SOLID INSULATION6.7.3.2 CLEARANCES6.7.3.3 CREEPAGE DISTANCES6.7.3.4 SOLID INSULATION6.8.3.1 AC VOLTAGE TEST6.8.3.2 DC VOLTAGE TEST6.8.3.3 IMPULSE VOLTAGE WITHSTAND TEST7.2 SHARP EDGES7.6 WALL MOUNTING8.2.1 STATIC TEST8.2.2 IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST | 2021-10-21 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | 10.1-10.4 NORMAL TEMPERATURE TEST10.5.1 INTEGRITY OF CLEARANCES AND CREEPAGE DISTANCES10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES13.2.2 BATTERY ABNORMAL14.8 CIRCUITS AND COMPONENTS USED AS TRANSIENT OVERVOLTAGE LIMITING DEVICES4.4.4.16 STAND-ALONE INVERTERS - LOAD TRANSFER5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.4.4 IMPEDANCE6.5.2.3 PROTECTIVE CONDUCTOR TERMINAL6.5.2.4 AND 6.5.2.5 GROUNDING CONTINUITY TEST6.5.4 PROTECTIVE IMPEDANCE6.6.2 TERMINALS FOR EXTERNAL CIRCUITS6.7.2.1 CLEARANCES AND CREEPAGE DISTANCES6.7.2.2 SOLID INSULATION6.7.3.2 CLEARANCES6.7.3.3 CREEPAGE DISTANCES6.7.3.4 SOLID INSULATION6.8.3.1 AC VOLTAGE TEST6.8.3.2 DC VOLTAGE TEST6.8.3.3 IMPULSE VOLTAGE WITHSTAND TEST7.2 SHARP EDGES7.6 WALL MOUNTING8.2.1 STATIC TEST8.2.2 IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST | 2021-10-21 | |
MEAS | IEC 61010-2-201:2017 | 10 EQUIPMENT TEMPERATURE LIMITS AND RESISTANCE TO HEAT14.101 COMPONENTS BRIDGING INSULATION14.102 SWITCHING DEVICES4.4 TESTING IN SINGLE FAULT CONDITION4.4.1.101.1 OVERLOAD TEST4.4.1.101.2 ENDURANCE TEST6.5.2.5 IMPEDANCE OF PROTECTIVE BONDING OF PERMANENTLY CONNECTED EQUIPMENT6.6 CONNECTIONS TO EXTERNAL CIRCUITS6.7 INSULATION REQUIREMENTS6.8 PROCEDURE FOR VOLTAGE TESTS8.2.2 IMPACT | 2021-10-21 |