LEADER ELECTRONICS INC.

Address(es)
  • 8TH FL 138 LN 235 BAOQIAO RD
    NEW TAIPEI
    XINDIAN DISTRICT,
    Chinese Taipei

Website Not available
Status

MEMBER

Acceptance date 2016-06-10

Further information

Stage

Country

Name

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST 4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST 4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS 4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING 4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST4.4.3.2, ANNEX T.3/ STEADY FORCE TEST, 30N4.4.3.2, ANNEX T.4/ STEADY FORCE TEST, 100N4.4.3.2, ANNEX T.5/ STEADY FORCE TEST, 250N4.4.3.3, ANNEX T.7/ DROP TEST4.4.3.4, ANNEX T.6/ IMPACT TEST4.4.3.8, ANNEX T.8/ STRESS RELIEF TEST5.2.2.1 - 5.2.2.6 /CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 / DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 / BALL PRESSURE TEST5.4.2, 5.4.3 / MINIMUM CLEARANCE AND CREEPAGE DISTANCE5.4.2.4 / MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST5.4.5 / ANTENNA TERMINAL INSULATION5.4.4.6.2 / SEPARABLE THIN SHEET MATERIAL5.4.8 / HUMIDITY CONDITIONING5.4.9.1 / ELECTRIC STRENGTH TEST5.5.2.2 / SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 / RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 / TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 / TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 / PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 / POWER MEASUREMENTS6.2.3.1 / ARCING PIS DETERMINATION6.2.3.2 / RESISTIVE PIS DETERMINATIONB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 / NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.2.5 / INPUT TEST: SINGLE PHASEB.3 / SIMULATED ABNORMAL OPERATING CONDITIONSB.4 / SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 / TRANSFORMER OVERLOADANNEX G.5.4.6.3 / ALTERNATIVE LOCKED/ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX G.7.3.2 / CORD STRAIN RELIEF TESTANNEX Q.1 / LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 / STEADY FORCE TEST, 10 N
2021-08-06

ITAV

ANNEX T.4 (4.4.4.2) / STEADY FORCE TEST, 100 NANNEX T.5 (4.4.4.2) / STEADY FORCE TEST, 250 NANNEX T.7 (4.4.4.3) / DROP TESTANNEX T.6 (4.4.4.4, 8.10.4) / ENCLOSURE IMPACT TESTANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) / STEADY FORCE TEST, 30 NANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) / STRESS RELIEF TEST4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING4.7 / EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST5.2, 5.7 / CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.1.1 / ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS5.4.1.4, ANNEX B.2 / MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.8 / DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 / BALL PRESSURE TEST5.4.2, 5.4.3 / CLEARANCE & CREEPAGE DISTANCES 5.4.4.6.2 / SEPARABLE THIN SHEET MATERIAL 5.4.5, ANNEX G.10.3.2 / ANTENNA TERMINAL INSULATION VOLTAGE SURGE 5.4.8 / HUMIDITY CONDITIONING 5.4.9 / ELECTRIC STRENGTH TEST 5.5.2.2 / SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) / RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7 / PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 / PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 / POWER MEASUREMENTS 6.2.3.1 / ARCING PIS DETERMINATION 6.3 / NORMAL OPERATING CONDITIONS TEMPERATURE TEST ANNEX B.2.5 / INPUT TEST: SINGLE PHASE ANNEX B.2.6 / NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 / SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 / SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 / TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 / TRANSFORMER OVERLOAD ANNEX G.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.3.2 / STRAIN RELIEF TEST ANNEX Q.1 / LIMITED POWER SOURCE ANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) / STEADY FORCE TEST, 10 N
2019-07-24

OFF

1.2.2.1 / MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 / INPUT TEST: SINGLE - PHASE1.6.2 / INPUT TEST: POLY - PHASE1.7.11 / DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 / ENERGY HAZARD MEASUREMENTS2.1.1.7 / CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 / SELV RELIABILITY TEST2.4.1, 2.4.2 / LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 / LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 / HUMIDITY TEST2.10.2 / DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 / THIN SHEET MATERIAL TESTS2.10.5.13 / TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.1.9 / CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6 / STRAIN RELIEF TEST4.1 / STABILITY TESTS4.2.1-4.2.4 / STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 / IMPACT TEST4.2.6, 4.2.1 / DROP TEST4.2.7, 4.2.1 / STRESS RELIEF TEST4.2.10 / LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 / KNOB PULL/HANDLE LOADING TEST4.3.5 / CONNECTOR CURRENT INTERRUPTION TEST4.3.6 / DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 / DIRECT PLUG-IN BLADE SECUREMENT TEST4.3.6 / DIRECT PLUG-IN SECURITY OF INPUT CONTACTS4.3.6 / DIRECT PLUG-IN RESISTANCE TO CRUSHING4.3.6 / DIRECT PLUG-IN ROD PRESSURE TEST4.3.8 / BATTERY TESTS4.3.8 / LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 / HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 / HEATING TEST4.5.5, 4.5.5 / BALL PRESSURE TEST5.1, ANNEX D / TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D / TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1.8.1 / LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE‐PHASE)5.1.8.3 / LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 / ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 / COMPONENT FAILURE TEST5.3.1 / ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 / TRANSFORMER ABNORMAL OPERATION TEST5.3.7 / POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST5.3.7 / OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 / REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2, 6.2.2.2 / ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST7.3, 6.2.2, 6.2.2.1 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, IMPULSE 7.3, 6.2.2, 6.2.2.2 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, STEADY-STATE7.4.2 / CABLE DISTRIBUTION SYSTEM, VOLTAGE SURGE7.4.3 / CABLE DISTRIBUTION SYSTEM, IMPULSEANNEX B.7 / LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-07-24

OFF

1.2.2.1 / MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 / INPUT TEST: SINGLE - PHASE1.6.2 / INPUT TEST: POLY - PHASE1.7.11 / DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 / ENERGY HAZARD MEASUREMENTS2.1.1.7 / CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 / SELV RELIABILITY TEST2.4.1, 2.4.2 / LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 / LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 / HUMIDITY TEST2.10.2 / DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 / THIN SHEET MATERIAL TESTS2.10.5.13 / TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.1.9 / CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6 / STRAIN RELIEF TEST4.1 / STABILITY TESTS4.2.1-4.2.4 / STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 / IMPACT TEST4.2.6, 4.2.1 / DROP TEST4.2.7, 4.2.1 / STRESS RELIEF TEST4.2.10 / LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 / KNOB PULL/HANDLE LOADING TEST4.3.5 / CONNECTOR CURRENT INTERRUPTION TEST4.3.6 / DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 / DIRECT PLUG-IN BLADE SECUREMENT TEST4.3.6 / DIRECT PLUG-IN SECURITY OF INPUT CONTACTS4.3.6 / DIRECT PLUG-IN RESISTANCE TO CRUSHING4.3.6 / DIRECT PLUG-IN ROD PRESSURE TEST4.3.8 / BATTERY TESTS4.3.8 / LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 / HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 / HEATING TEST4.5.5, 4.5.5 / BALL PRESSURE TEST5.1, ANNEX D / TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D / TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1.8.1 / LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE‐PHASE)5.1.8.3 / LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 / ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 / COMPONENT FAILURE TEST5.3.1 / ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 / TRANSFORMER ABNORMAL OPERATION TEST5.3.7 / POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST5.3.7 / OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 / REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2, 6.2.2.2 / ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST7.3, 6.2.2, 6.2.2.1 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, IMPULSE 7.3, 6.2.2, 6.2.2.2 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, STEADY-STATE7.4.2 / CABLE DISTRIBUTION SYSTEM, VOLTAGE SURGE7.4.3 / CABLE DISTRIBUTION SYSTEM, IMPULSEANNEX B.7 / LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-07-24

OFF

1.2.2.1 / MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST.1.6.2 / INPUT TEST: SINGLE - PHASE1.6.2 / INPUT TEST: POLY - PHASE1.7.11 / DURABILITY OF MARKING TEST2.1.1.5, 2.1.2, 1.2.8.10 / ENERGY HAZARD MEASUREMENTS2.1.1.7 / CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 / SELV RELIABILITY TEST2.4.1, 2.4.2 / LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 / LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST I2.6.3.4, 2.6.1 / PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 / HUMIDITY TEST2.10.2 / DETERMINATION OF WORKING VOLTAGE – WORKING VOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10, 2.10.5.6 / THIN SHEET MATERIAL TESTS2.10.5.13 / TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH3.1.9 / CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6 / STRAIN RELIEF TEST4.1 / STABILITY TESTS4.2.1-4.2.4 / STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 / IMPACT TEST4.2.6, 4.2.1 / DROP TEST4.2.7, 4.2.1 / STRESS RELIEF TEST4.2.10 / LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.3.2 / KNOB PULL/HANDLE LOADING TEST4.3.5 / CONNECTOR CURRENT INTERRUPTION TEST4.3.6 / DIRECT PLUG IN EQUIPMENT – MOMENT TEST4.3.6 / DIRECT PLUG-IN BLADE SECUREMENT TEST4.3.6 / DIRECT PLUG-IN SECURITY OF INPUT CONTACTS4.3.6 / DIRECT PLUG-IN RESISTANCE TO CRUSHING4.3.6 / DIRECT PLUG-IN ROD PRESSURE TEST4.3.8 / BATTERY TESTS4.3.8 / LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, .4.4 / HAZARDOUS MOVING PARTS TEST4.5.1, 1.4.12, 1.4.13 / HEATING TEST4.5.5, 4.5.5 / BALL PRESSURE TEST5.1, ANNEX D / TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM)5.1, ANNEX D / TOUCH CURRENT TEST(Poly – PHASE; TN/TT SYSTEM)5.1.8.1 / LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE‐PHASE)5.1.8.3 / LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS5.2.2 / ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 / COMPONENT FAILURE TEST5.3.1 / ABNORMAL OPERATON TESTS5.3.3, 5.3.7B, ANNEX C.1 / TRANSFORMER ABNORMAL OPERATION TEST5.3.7 / POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST5.3.7 / OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST6.1.2 / REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH6.2.2, 6.2.2.2 / ELECTRIC STRENGTH TEST PROCEDURE ‐ STEADY‐STATE TEST7.3, 6.2.2, 6.2.2.1 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, IMPULSE 7.3, 6.2.2, 6.2.2.2 / CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH PROCEDURE, STEADY-STATE7.4.2 / CABLE DISTRIBUTION SYSTEM, VOLTAGE SURGE7.4.3 / CABLE DISTRIBUTION SYSTEM, IMPULSEANNEX B.7 / LOCKED –ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY
2019-07-24