LC Future Center Limited Taiwan Branch
LC Future Center Limited Taiwan Branch
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2019-05-24 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, ANNEX T.4 ‐ STEADY FORCE TEST, 100 N 4.4.3.2, ANNEX T.5 ‐ STEADY FORCE TEST, 250 N 4.4.3.2, ANNEX T.3 ‐ STEADY FORCE TEST, 30 N 4.4.3.3, ANNEX T.7 ‐ DROP TEST 4.4.3.4, ANNEX T.6 ‐ IMPACT TEST4.4.3.8, ANNEX T.8 ‐ STRESS RELIEF TEST5.4.1.4, Annex B.2 ‐ MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.2.2.2, 6.2.2.3 ‐ POWER MEASUREMENTS 6.3 ‐ NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 ‐ REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS 6.4.3.3 ‐ REDUCTION OF THE LIKELIHOOD OF IGNITION ‐ TEMPERATURES LIMITED BY FUSES 6.6 ‐ TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 8.6.2 ‐ STATIC STABILITY B.2.5 ‐ INPUT TEST: SINGLE PHASE B.2.6 ‐ NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT B.3 ‐ SIMULATED ABNORMAL OPERATING CONDITIONS B.4 ‐ SIMULATED SINGLE FAULT CONDITIONS 6.4.2, ANNEX B.4 ‐ SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS G.5.4.6 ‐ LOCKED‐ROTOR OVERLOAD TEST FOR D.C. MOTORS G.5.4.6.3 ‐ ALTERNATIVE LOCKED‐ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIES ANNEX Q.1 ‐ LIMITED POWER SOURCE ANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N | 2023-12-06 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N4.4.4.2, ANNEX T.3 - STEADY FORCE TEST, 30 N4.4.4.3, ANNEX T.7 - DROP TEST4.4.4.4, ANNEX T.6 - IMPACT TEST4.4.4.5, ANNEX T.3 - STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS6.2.3.1 - ARCING PIS DETERMINATION6.2.3.2 - RESISTIVE PIS DETERMINATION6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.3, ANNEX B.4 - REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS6.4.3.3 - REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES6.6 - TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONB.2.5 - INPUT TEST: SINGLE PHASEB.2.6 - NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 - SIMULATED ABNORMAL OPERATING CONDITIONSB.4 - SIMULATED SINGLE FAULT CONDITIONS6.4.2, ANNEX B.4 - SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITIONANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 - LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSG.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORSANNEX M.3.2 – PROTECTION CIRCUITS FOR BATTERIESANNEX Q.1 - LIMITED POWER SOURCEANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N | 2019-05-24 | |
OFF | IEC 60950-1:2005 | Accepted with clauses:1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENTTEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DCMOTORS IN SECONDARY | 2019-05-24 | |
OFF | IEC 60950-1:2005/AMD1:2009 | Accepted with clauses:1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENTTEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DCMOTORS IN SECONDARY | 2019-05-24 | |
OFF | IEC 60950-1:2005/AMD2:2013 | Accepted with clauses:1.6.2 - INPUT TEST: SINGLE - PHASE1.7.11 - DURABILITY OF MARKING TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS4.1 - STABILITY TESTS4.2.1-4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, PART 22.10.2 - IMPACT TEST4.2.6, 4.2.1 - DROP TEST4.2.7, 4.2.1 - Stress Relief Test4.3.8 - BATTERY TESTS4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENTTEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.1 - ABNORMAL OPERATON TESTS5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTANNEX B.7 - LOCKED –ROTOR OVERLOAD TEST FOR DCMOTORS IN SECONDARY | 2019-05-24 |