Laboratory Of Dongguan Aohai Technology Co., Ltd.
Laboratory Of Dongguan Aohai Technology Co., Ltd.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2022-11-17 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 – DROP TEST4.4.3.4, ANNEX T.6 – IMPACT TEST4.4.3.8, ANNEX T.8 – STRESS RELIEF TEST4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: MOMENT TEST 5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.3 – TEST FOR HYGROSCOPIC MATERIALS5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.10.3 – BALL PRESSURE TEST5.4.5 – ANTENNA TERMINAL INSULATION 5.4.4.6.2 – SEPARABLE THIN SHEET MATERIAL5.4.9.1 – ELECTRIC STRENGTH TEST – TYPE TESTING OF SOLID INSULATION5.5.2.2 – CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS8.7 – WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTSB.2.5 – INPUT TEST: SINGLE PHASEB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 – TRANSFORMER OVERLOADQ.1 – LIMITED POWER SOURCEANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 N | 2022-11-17 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2,ANNEX T.3 STEADY FORCE TEST, 30N 4.4.4.2,ANNEX T.4 STEADY FORCE TEST, 100N 4.4.4.2,ANNEX T.5 STEADY FORCE TEST, 250N 4.4.4.3,ANNEX T.7 DROP TEST 4.4.4.4,ANNEX T.6 IMPACT 4.4.4.5,ANNEX T.3 STEADY FORCE TEST FOR INTERNALENCLOSURE AND BARRIER 4.4.4.7,ANNEX T.8 STRESS RELIEF TEST 4.7 EQUIPMENT FOR DIRECT INSERTION INTOMAINS SOCKET-OUTLETS: MOMENT TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGYSOURCES 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 – BALL PRESSURE TEST5.4.5 – ANTENNA TERMINAL INSULATION 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL 5.4.8 Humidity5.4.9 ELECTRIC STRENGTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITORDISCHARGE AFTER DISCONNECTION OF ACONNECTOR 5.6.6.2 A) RESISTANCE OF THE PROTECTIVE BONDINGSYSTEM: 25 A OR LESS 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCHCURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2,6.2.2.3 POWER MEASUREMENTS 8.7 – WALL OR CEILING MOUNTING TESTSANNEX B.2.5 INPUT TEST: SINGLE PHASE B.2.6, 5.4.1.4, 6.3, 9.2 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATINGCONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 TRANSFORMER OVERLOAD TESTS ANNEX T.2 STEADY FORCE TEST, 10N ANNEX Q.1 LIMITED POWER SOURCE | 2022-11-17 |