Kiosk Information Systems Inc.
Kiosk Information Systems Inc.
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2019-11-21 |
Further information
Stage | Country | Name |
---|---|---|
2 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.4.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.4.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.4.3, ANNEX T.7 – DROP TEST4.4.4.4, ANNEX T.6 – IMPACT TEST4.4.4.5, ANNEX T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.6, ANNEX T.9 – GLASS IMPACT TEST5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION6.4.3, ANNEX B.4– REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL OR CEILING MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.4.4 – MOTOR LOCKED-ROTOR OVERLOAD TESTANNEX G.7.3.2 – STRAIN RELIEF TESTANNEX Y.5.3 – WATER SPRAY TEST | 2020-02-13 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, ANNEX T.3 – STEADY FORCE TEST, 30 N4.4.4.2, ANNEX T.4 – STEADY FORCE TEST, 100 N4.4.4.2, ANNEX T.5 – STEADY FORCE TEST, 250 N4.4.4.3, ANNEX T.7 – DROP TEST4.4.4.4, ANNEX T.6 – IMPACT TEST4.4.4.5, ANNEX T.3 – STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.4.6, ANNEX T.9 – GLASS IMPACT TEST5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.1.4, Annex B.2 – MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 – PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.3 – NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.4.2, ANNEX B.4 – SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION6.4.3, ANNEX B.4– REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STABILITY TEST8.6.4 – GLASS SLIDE TEST8.6.5 – HORIZONTAL FORCE TEST8.7 – WALL OR CEILING MOUNTING TESTS8.8 – HANDLE STRENGTHB.2.5 – INPUT TEST: SINGLE PHASEB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSANNEX G.5.4.4 – MOTOR LOCKED-ROTOR OVERLOAD TESTANNEX G.7.3.2 – STRAIN RELIEF TESTPART 22, 9.1, ANNEX B – WATER SPRAY TEST | 2020-02-13 | |
OFF | IEC 60950-1:2005 | 1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTPART 22, 9.1, ANNEX B – WATER SPRAY TEST | 2020-02-13 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTPART 22, 9.1, ANNEX B – WATER SPRAY TEST | 2020-02-13 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.6.2 - INPUT TEST: SINGLE-PHASE2.1.1.7 CAPACITANCE DISCHARGE TEST2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST4.1 STABILITY TESTS4.2.1 - 4.2.4 – STEADY FORCE TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.5, 4.2.1, PART 22 10.2 IMPACT TEST4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 5.3.9 ABNORMAL OPERATION TESTS5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTPART 22, 9.1, ANNEX B – WATER SPRAY TEST | 2020-02-13 |