INVENTUS POWER, INC.- DESIGN CENTER
INVENTUS POWER, INC.- DESIGN CENTER
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2022-07-08 |
Further information
Stage | Country | Name |
---|---|---|
2 | Denmark |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
BATT | IEC 62133:2012 | 5.2 INSULATION AND WIRING8.1.2 CHARGE (PROCEDURE 2)8.1 CHARGING PROCEDURES FOR TEST PURPOSESTEMPERATURE TEST (BATTERY)8.3.2 EXTERNAL SHORT CIRCUIT (BATTERY)8.3.3 FREE FALL8.3.6 OVER‐CHARGING OF BATTERY | 2022-07-08 | |
BATT | IEC 62133-2:2017 | - | 2022-07-08 | |
BATT | IEC 62133-2:2017/AMD1:2021 | 5.2 INSULATION AND WIRING7.1 CHARGING PROCEDURES FOR TEST PURPOSES7.2.2 CASE STRESS AT HIGH AMBIENT TEMPERATURE (BATTERY)7.3.2 EXTERNAL SHORT-CIRCUIT (BATTERY)7.3.3 FREE FALL7.3.6 OVER-CHARGING OF BATTERY7.3.8.1 VIBRATION7.3.8.2 MECHANICAL SHOCK | 2022-07-08 | |
BATT | IEC 62619:2022 | 7.2.3 DROP TEST7.3.3 PROPAGATION TEST8.2.2 OVERCHARGE CONTROL OF VOLTAGE | 2023-08-01 | |
BATT | IEC 62619:2017 | 7.2.3 DROP TEST7.3.3 PROPAGATION TEST8.2.2 OVERCHARGE CONTROL OF VOLTAGE8.2.3 OVERCHARGE CONTROL OF CURRENT8.2.4 OVERHEATING CONTROL | 2023-08-01 | |
ITAV | IEC 62368-1:2018 | 5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.2 RESISTIVE PIS DETERMINATION 9.0 THERMAL BURN INJURY ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 OPERATING TEMPERATURE MEASUREMENT CONDITIONS ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIESANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4 (ANNEX T.7) DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX M.5 (ANNEX P.2.3) RISK OF BURN DUE TO SHORT-CIRCUIT DURING CARRYING ANNEX Q.1 LIMITED POWER SOURCE ANNEX T.4 (4.4.3.2) STEADY FORCE TEST, 100 N ANNEX T.7 (4.4.3.3) DROP TEST ANNEX T.8 (4.4.3.8) STRESS RELIEF TEST | 2022-07-08 | |
ITAV | IEC 62368-1:2014 | 5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH TEST 5.5.2.2SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.2 RESISTIVE PIS DETERMINATION 9.0 THERMAL BURN INJURY ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 OPERATING TEMPERATURE MEASUREMENT CONDITIONS ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIES ANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.4.4 (ANNEX T.7) DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERY ANNEX M.5 (ANNEX P.2.3) RISK OF BURN DUE TO SHORT-CIRCUIT DURING CARRYING ANNEX Q.1 LIMITED POWER SOURCE ANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 NANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 NANNEX T.6 (4.4.4.4) IMPACT TESTANNEX T.7 (4.4.4.3) DROP TEST ANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST | 2022-07-08 | |
OFF | IEC 60950-1:2005 | 1.2.2.1 GUIDE INFORMATION PAGE ‐ MAXIMUM OUTPUTVOLTAGE, CURRENT, AND VOLT‐AMPERE MEASUREMENTTEST1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ‐ 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B,ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST | 2022-07-08 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.2.2.1 GUIDE INFORMATION PAGE ‐ MAXIMUM OUTPUTVOLTAGE, CURRENT, AND VOLT‐AMPERE MEASUREMENTTEST1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ‐ 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B,ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST | 2022-07-08 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.2.2.1 GUIDE INFORMATION PAGE ‐ MAXIMUM OUTPUTVOLTAGE, CURRENT, AND VOLT‐AMPERE MEASUREMENTTEST1.6.2 INPUT TEST: SINGLE‐PHASE1.7.11 DURABILITY OF MARKING TEST2.1.1.5, 2.1.2,1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST INCLUDING HAZARDOUS VOLTAGE MEASUREMENTS2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE TEST2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST2.10.2 DETERMINATION OF WORKING VOLTAGE ‐ WORKINGVOLTAGE MEASUREMENT TEST2.10.5.9, 2.10.5.10,2.10.5.6 THIN SHEET MATERIAL TESTS2.10.5.6, 2.10.5.13 TRANSFORMER AND WIRE INSULATION ELECTRIC STRENGTH TEST4.2.1‐4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1, PART22 10.2 IMPACT TEST4.2.6 DROP TEST4.2.7 STRESS RELIEF TEST4.3.8 BATTERY TESTS4.5.1, 1.4.12, 1.4.13 HEATING TEST4.5.5, 4.5 BALL PRESSURE TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE‐PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.1 ‐ 5.3.9 ABNORMAL OPERATION TESTS5.3.3, 5.3.7B,ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST5.3.7 POWER SUPPLY OUTPUT SHORT‐CIRCUIT/OVERLOAD TEST | 2022-07-08 |