Intelligent Platforms LLC

Address(es)
  • 2500 Austin Dr, VA, 22911,
    Charlottesville,
    United States of America

Website Not available
Status

WITHDRAWN

Acceptance date 2022-03-03

Further information

Stage

Country

Name

2

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2(A) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATIONANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX G.5.3.3 TRANSFORMER OVERLOADANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)ANNEX T.6 ENCLOSURE IMPACT TESTANNEX T.7 DROP TESTANNEX T.8 STRESS RELIEF TESTG.5.3.3.3 TRANSFORMER OVERLOAD - ALTERNATIVE TEST METHODM.3.2 PROTECTION CIRCUITS FOR BATTERIESQ.1 LIMITED POWER SOURCE
2022-03-03

MEAS

10.1 - 10.4 TEMPERATURE TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.8 DIELECTRIC VOLTAGE WITHSTAND TEST6.8.2 HUMIDITY PRECONDITIONING TEST8.2.1 STATIC TEST8.2.2 IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST
2022-03-03

MEAS

10.1 - 10.4 TEMPERATURE TEST10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURES5.1.3 INPUT POWER/CURRENT MEASUREMENT5.3 DURABILITY OF MARKING TEST6.8 DIELECTRIC VOLTAGE WITHSTAND TEST6.8.2 HUMIDITY PRECONDITIONING TEST8.2.1 STATIC TEST8.2.2 IMPACT9.4 LIMITED ENERGY CIRCUIT DETERMINATION TEST
2022-03-03

MEAS

4.4.1 COMPONENT ABNORMAL 4.4.2.2 PROTECTIVE IMPEDANCE ABNORMAL4.4.2.3 PROTECTIVE CONDUCTOR ABNORMAL4.4.2.4 SHORT TERM / INTERMITTENT DUTY ABNORMAL 4.4.2.5 MOTOR ABNORMAL 4.4.2.6 CAPACITOR SHORT CIRCUIT ABNORMAL 4.4.2.7.2 MAINS TRANSFORMER Short Circuit 4.4.2.7.3 MAINS TRANSFORMER OVERLOAD 4.4.2.8 OUTPUT ABNORMAL 4.4.2.9 MULTI-SUPPLY ABNORMAL 4.4.2.10 COOLING ABNORMAL 4.4.2.11 HEATING DEVICE ABNORMAL 4.4.2.13 INSULATION BETWEEN CIRCUITS AND PARTS ABNORMAL 4.4.1.101.1, 4.4.1.101.2 OVERLOAD AND ENDURANCE TEST - GENERAL USE AND RESISTIVE LOADS 4.4.1.101.1, 4.4.1.101.2 OVERLOAD AND ENDURANCE TEST - PILOT DUTY LOADS 5.1.3 MAINS SUPPLY 5.3 DURABILITY OF MARKINGS 6.5.2.4, 6.5.2.5 GROUNDING CONTINUITY 6.8 DIELECTRIC VOLTAGE WITHSTAND 6.8.2 HUMIDITY CONDITIONING 8.2.1 RIGIDITY TEST 8.2.2 IMPACT8.3.1 DROP TEST OTHER THAN HAND-HELD EQUIPMENT AND DIRECT PLUG-IN EQUIPMENT 9.4 LIMITED ENERGY CIRCUIT DETERMINATION 10.4.1.103 TEMPERATURE10.5.2 RESISTANCE TO HEAT OF NONMETALLIC ENCLOSURE 10.5.3 BALL PRESSURE
2022-03-03