Hitachi Information & Telecommunication Engineering, Ltd.
Hitachi Information & Telecommunication Engineering, Ltd.
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2005-11-15 |
Further information
Stage | Country | Name |
---|---|---|
2 | United States of America | |
2 | United States of America |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
ITAV | IEC 62368-1:2018 | 4.4.3.2, T.5 – STEADY FORCE TEST, 250 N4.4.3.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGURARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.3.4, T.6 – IMPACT TEST4.4.3.5, T.3 – STEADY FORCE TEST, 30 N FOR INTERNAL AND BARRIER5.2.2.1-5.2.2.6 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.9.1 – ELECTRIC STRENGTH TEST5.5.2.2 –CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 – TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 – TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.2 – RESISTIVE PIS DETERMINATION8.6.2 – STATIC STABILITY8.6.3.2 – RELOCATION STABILITY TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6 , 5.4.1.4, 6.3, B.1.5– NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSQ.1 – LIMITED POWER SOURCET.2 , 5.4.2.6, 5.4.3.2, G.15.2.6 – STEADY FORCE TEST, 10 N4.4.3.8, T.8 – STRESS RELIEF TEST | 2022-09-20 | |
ITAV | IEC 62368-1:2014 | 4.4.4.2, T.5 – STEADY FORCE TEST, 250 N4.4.4.2, T.3 – STEADY FORCE TEST, 30 N FOR SAFEGURARD THAT ACTS AS FIRE ENCLOSURE/BARRIER ONLY4.4.4.4, T.6 – IMPACT TEST4.4.3.5, T.3 – STEADY FORCE TEST, 30 N FOR INTERNAL AND BARRIER5.2 – CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.8 – DETERMINATION OF WORKING VOLTAGE5.4.9 – ELECTRIC STRENGTH TEST5.5.2.2 – SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6.2 – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS6.2.3.2 – RESISTIVE PIS DETERMINATION8.6.2 – STATIC STABILITY8.6.3 – RELOCATION STATBILITY TESTB.2.5 – INPUT TEST: SINGLE PHASEB.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 – SIMULATED ABNORMAL OPERATING CONDITIONSB.4 – SIMULATED SINGLE FAULT CONDITIONSF.3.10 – TEST FOR THE PERMANENCE OF MARKINGSG.5.4.6 – LOCKED -ROTOR OVERLOAD TEST FOR D.C. MOTORQ.1 – LIMITED POWER SOURCET.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N4.4.4.7, T.8 – STRESS RELIEF TEST | 2019-07-05 | |
OFF | IEC 60950-1:2005 | 1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.1, 2.8.2, PART 21 4.2 - ACCESS TO ENERGIZED PARTS TEST2.1.1.7 - CAPACITANCE DISCHARGE TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 – 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTAnnex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS4.2.7, 4.2.1 - STRESS RELIEF TEST | 2019-07-05 | |
OFF | IEC 60950-1:2005/AMD1:2009 | 1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.1, 2.8.2, PART 21 4.2 - ACCESS TO ENERGIZED PARTS TEST2.1.1.7 - CAPACITANCE DISCHARGE TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 – 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTAnnex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS4.2.7, 4.2.1 - STRESS RELIEF TEST | 2019-07-05 | |
OFF | IEC 60950-1:2005/AMD2:2013 | 1.6.2 - INPUT TEST: SINGLE-PHASE1.7.11 - DURABILITY OF MARKING TEST2.1.1.1, 2.8.2, PART 21 4.2 - ACCESS TO ENERGIZED PARTS TEST2.1.1.7 - CAPACITANCE DISCHARGE TEST2.5 - LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST4.2.1 – 4.2.4 - STEADY FORCE TESTS4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST4.5.1, 1.4.12, 1.4.13 - HEATING TEST5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 - ELECTRIC STRENGTH TEST5.3.1 – 5.3.9 - ABNORMAL OPERATION5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TESTAnnex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS4.2.7, 4.2.1 - STRESS RELIEF TEST | 2019-07-05 |