Hilti Entwicklungsgesellschaft GmbH DEKRA-515
Hilti Entwicklungsgesellschaft GmbH DEKRA-515
Address(es) |
|
Website | Not available |
Status | MEMBER |
Acceptance date | 2020-06-22 |
Further information
Stage | Country | Name |
---|---|---|
3 | Netherlands |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
HOUS | IEC 60335-1:2020 | All clauses applicable to battery-powered appliances except- Requirements for mains-powered appliances- Clause 9 (starting)- Clause 15.1 IP testing- Clause 21.2 (Strength of accessible parts of solid insulation to prevent penetration by sharp implements)- Clause 32 (Radiation, toxicity and similar hazards)- Annex E (Needle-flame test)- Annex N (Proof tracking test)- Annex R partly (Software evaluation)- Annex F (capacitors)- Annex G (Safety isolating transformers)- Annex I Motors having basic insulation inadequate for the rated voltage of the appliance- Annex J (normative) Coated printed circuit boards | 2022-06-16 | |
HOUS | IEC 60335-1:2010 | All clauses applicable to battery-powered appliances except- Requirements for mains-powered appliances- Clause 9 (starting)- Clause 15.1 IP testing- Clause 21.2 (Strength of accessible parts of solid insulation to prevent penetration by sharp implements)- Clause 32 (Radiation, toxicity and similar hazards)- Annex E (Needle-flame test)- Annex N (Proof tracking test)- Annex R partly (Software evaluation)- Annex F (capacitors)- Annex G (Safety isolating transformers)- Annex I Motors having basic insulation inadequate for the rated voltage of the appliance- Annex J (normative) Coated printed circuit boards | 2022-06-16 | |
HOUS | IEC 60335-1:2010/AMD1:2013 | All clauses applicable to battery-powered appliances except- Requirements for mains-powered appliances- Clause 9 (starting)- Clause 15.1 IP testing- Clause 21.2 (Strength of accessible parts of solid insulation to prevent penetration by sharp implements)- Clause 32 (Radiation, toxicity and similar hazards)- Annex E (Needle-flame test)- Annex N (Proof tracking test)- Annex R partly (Software evaluation)- Annex F (capacitors)- Annex G (Safety isolating transformers)- Annex I Motors having basic insulation inadequate for the rated voltage of the appliance- Annex J (normative) Coated printed circuit boards | 2022-06-16 | |
HOUS | IEC 60335-1:2010/AMD2:2016 | All clauses applicable to battery-powered appliances except- Requirements for mains-powered appliances- Clause 9 (starting)- Clause 15.1 IP testing- Clause 21.2 (Strength of accessible parts of solid insulation to prevent penetration by sharp implements)- Clause 32 (Radiation, toxicity and similar hazards)- Annex E (Needle-flame test)- Annex N (Proof tracking test)- Annex R partly (Software evaluation)- Annex F (capacitors)- Annex G (Safety isolating transformers)- Annex I Motors having basic insulation inadequate for the rated voltage of the appliance- Annex J (normative) Coated printed circuit boards | 2022-06-16 | |
HOUS | IEC 60335-2-69:2021 | See part 1 and further excluding:- Annex AA (dust classification)- Annex DD ESD protected areas),- Annex EE (Noise)- Annex FF (Vibration)- Annex GG vacuum cleaners for rescue and firefighting services | 2022-06-16 | |
HOUS | IEC 60335-2-69:2016 | See part 1 and further excluding:- Annex AA (dust classification)- Annex DD ESD protected areas),- Annex EE (Noise)- Annex FF (Vibration)- Annex GG vacuum cleaners for rescue and firefighting services | 2022-06-16 | |
INDA | IEC 60204-1:2016 | Clause 18 (which covers the verification tests) | 2023-06-01 | |
INDA | IEC 60204-1:2016/AMD1:2021 | Clause 18 (which covers the verification tests) | 2023-06-01 | |
TOOL | IEC 60745-1:2006 | All clauses except:- 14.2 (IP testing),- 29.3 + Annex G (Tracking test),- (EN 60745-1: Cl. 6.1 Noise) | 2020-06-22 | |
TOOL | IEC 60745-2-1:2003 | See part 1 | 2020-06-22 | |
TOOL | IEC 60745-2-1:2003/AMD1:2008 | See part 1 | 2020-06-22 | |
TOOL | IEC 60745-2-3:2006 | See part 1 | 2020-06-22 | |
TOOL | IEC 60745-2-3:2006/AMD1:2010 | See part 1 | 2020-06-22 | |
TOOL | IEC 60745-2-3:2006/AMD2:2012 | See part 1 | 2020-06-22 | |
TOOL | IEC 62841-1:2014 | All clauses except:- 14.4.2 (IP testing),- 18.8.1 SCF evaluation- I.2 (Noise) | 2020-06-22 | |
TOOL | IEC 62841-2-1:2017 | See part 1 | 2020-06-22 | |
TOOL | IEC 62841-2-3:2020 | See part 1 | 2021-01-28 | |
TOOL | IEC 62841-2-6:2020 | See IEC 62841-1 | 2023-06-01 | |
TOOL | IEC 62841-2-6:2020/AMD1:2024 | See IEC 6284101 | 2024-09-17 | |
TOOL | IEC 62841-2-10:2017 | See IEC 62841-1 | 2023-06-01 | |
TOOL | IEC 62841-2-17:2017 | See IEC 62841-1 | 2023-06-01 | |
TOOL | IEC 62841-3-6:2014 | See part 1 | 2020-06-22 | |
TOOL | IEC 62841-3-7:2020 | See IEC 62841-1 | 2023-12-06 |